International conference on construction engineering and project management
/
2013.01a
/
pp.412-418
/
2013
With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.
Proceedings of the Korea Society for Simulation Conference
/
2003.11a
/
pp.75-85
/
2003
With recent advances in technology and the changing nature of business, call center management has become a rapidly growing industry. However theoretical analysis about the call center system is very difficult, and the forecasting of call volume also. In the situation, it is significant that we study call-flow system, design system model and perform simulation. If these are possible, it is able to control the staff schedule and the resource management efficiently. This study introduces the process of applying the call center to simulation. So, it is feasible to break from the intuitive management by a minority manager and analyze it scientifically. The enterprise can reduce unnecessary expense, make an offer high quality to user in a keen competition
This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.
This study was conducted to evaluate the subjective ideas about the determinants of quality in ambulatory care unit among outpatients and medical staff of a university hospital, and to compare the differences of the ideas, between patients themselves and hospital staff. A self-administered questionnaire survey was conducted covering 799 outpatients and 190 hospital staff in March, 1998. The questionnaire included general characteristics and 26 determinants of ambulatory care quality. The following are summaries of the findings: 1. Both of outpatients and hospital staff perceived, "Physician's knowledge" as the most important determinant of medical care quality. 2. In respect of 7 determinants related to physician's knowledge and skill, both outpatients and hospital staff perceived "physician's knowledge and skill" as important determinants. The scores of determinants such as, "Not doing unnecessary examinations", and "Assignment of adequate number of patients and duty schedule for the physician" were significantly different between outpatients and hospital staff. 3. In respect of 4 determinants related to doctor-patient relationship, both outpatients and hospital staff perceived "attention to patient's complaints" as the most important determinant. The scores related to the determinants such as "kindness of physician" and "explanation of treatment outcome" were significantly different between outpatients and hospital staff. 4. Among the amenities related determinants, "Modern facilities and equipments" were perceived as the most important determinant in both group. 5. In respect of 8 determinants related to non-financial accommodation, outpatients perceived, "Waiting hours for treatment" as the most important determinant, and hospital staff perceived, "Kindness of hospital staff". 6. In respect of 4 determinants related to financial accommodation, outpatients perceived, "Fare account of medical cost" as the most important determinant, and hospital staff perceived, "Increasing reimbursements". Further comprehensive research should be made on the evaluation of perceptions of medical care quality, both of outpatient and inpatient care, among patients and hospital staff. So good quality in medical care will be achieved based on clients' needs.
Journal of the Korea Academia-Industrial cooperation Society
/
v.10
no.6
/
pp.1281-1286
/
2009
Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.
Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
Journal of the Korea Institute of Building Construction
/
v.24
no.1
/
pp.145-156
/
2024
In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.
Journal of the Korea Institute of Information and Communication Engineering
/
v.19
no.7
/
pp.1585-1592
/
2015
Currently, the existing schedule management of ship repair has depended on hand-written notes of engineering manager in the repair ship yard. Simple management based on the hand-written notes is inefficient because current states of equipments and staff are not graspable in real-time. To solve this problem, the ICT based scheduling method is required in ship repair industry. In this paper, we propose a system based on ICT which manages schedules for repairing ships. The proposed system solves the problem occurred by the management to use the hand-written notes. Because the system has a function to report the current state of ship repair, it is able to cope with various problems, such as delay, wrong repair and so on. Moreover, the system is able to maximize the efficiency of ship repair process due to efficient management to staff and equipment.
Journal of Agricultural Extension & Community Development
/
v.22
no.1
/
pp.69-78
/
2015
This study conducted IPA of each item related to the farm party operation aiming at the participants to farm parties. The survey was carried out on the participants to the farm parties held in Damyang County from October 11th to November 22nd, 2014, and 103 questionnaires were used for the final analysis. The specific results of the IPA are as follows. In the first quarter of 'maintenance and management performance' are included the total of seven items. They are a harmonious view with the surrounding environment, friendliness of the farmer and the party staff, posting the event schedule and providing the program, proper disposition of the staff in the farm, an exchange among farm party participants, food that makes use of farm produce and the convenience of gaining information. In the second quarter of 'intensive improvement' are included eight items. They are cleanliness of the facilities such as restroom and basin, providing the pamphlets or promotion materials of the farms in the farm party, things to experience utilizing the farm produce grown in the host farm, various events, smooth progress of the farm party program, inclusion of the indigenous native food, variety of things to buy including farm produce and information delivery about the farm produce on sale.
Proceedings of the Korean Operations and Management Science Society Conference
/
2003.05a
/
pp.81-86
/
2003
다수의 수련병원이 단일 병원군을 형성하려 전공의를 공동으로 모집선발하고, 또한 공동 책임에 수련시키는 전공의 통합수련프로그램인 "병원군별 전공의 총정원제"에서 인턴 순환근무 수련일정 계획은 순환교육과 임상경험을 위란 인턴의 일년간 수련일정을 수립하는 의사결정문제이다. 전공의의 순환배치와 관련하여 병원간의 갈등 또는 인턴의 불만 등이 발생할 수 있기에 병원군별 전공의 총정원제는 질적으로 우수하면 객관적인 인턴수련일정을 필요로 한다. 본 논문은 인턴일정계획의 수리모형을 제시하고, 면실의 데이터를 사용해 산출된 순환일정을 다각도로 분석한 결과를 제시한다. 작성된 수련일정은 9개병원이 참여한 CMC병원군에서 2003년 현재 263명 인턴의 일년수련 순환배지에 사용되고 있다.
International Journal of Computer Science & Network Security
/
v.24
no.6
/
pp.17-22
/
2024
Software cost and schedule estimation is usually based on the estimated size of the software. Advanced estimation techniques also make use of the diverse factors viz, nature of the project, staff skills available, time constraints, performance constraints, technology required and so on. Usually, estimation is based on an estimation model prepared with the help of experienced project managers. Estimation of software cost is predominantly a crucial activity as it incurs huge economic and strategic investment. However accurate estimation still remains a challenge as the algorithmic models used for Software Project planning and Estimation doesn't address the true dynamic nature of Software Development. This paper presents an efficient approach using the contemporary Constructive Cost Model (COCOMO) augmented with the desirable feature of fuzzy logic to address the uncertainty and flexibility associated with the cost drivers (Effort Multiplier Factor). The approach has been validated and interpreted by project experts and shows convincing results as compared to simple algorithmic models.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.