• 제목/요약/키워드: spillway

검색결과 163건 처리시간 0.052초

보령댐 여수로 사면의 안정성 분석 및 유지방안 연구 (Study on the Stability Analysis and Supporting Methods for the Spillway Slopes in Boryeong Dam)

  • 정소걸;한공창;최성웅;박연준
    • 터널과지하공간
    • /
    • 제8권1호
    • /
    • pp.37-45
    • /
    • 1998
  • In this study, two dimensional and three dimensional numerical analysis were performed with a finite difference code for the safe maintenance of the spillway slope of the Boryeong dam. Results of the geological survey and the stereographic projection analysis on the discontinuities were used as input data for the numerical analysis. As a result, several suggestions were given such as the reinforcement of the local tension zone, the decrease in the angle of the slope, the drawdown of the pore pressure in the slope and the removal of the upper benches. A systematic and long-term monitoring system was also suggested.

  • PDF

중.소규모 댐에 대한 홍수배제능력 증대방안에 대한 연구 (The Study on Discharge Capacity Improvement for Small and Medium Sized Dams)

  • 박세훈;문영일;서일원;이대흥
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.735-739
    • /
    • 2006
  • 중 소규모 댐의 경우 대부분 홍수에 취약한 것으로 확인되고 있으나 투자의 우선순위에 밀려 안전의 사각지대에 놓여 있는 것이 현실이다. 그러나 만약 댐이 붕괴될 경우에는 그 피해가 막대하므로 현실적인 대책수립과 함께 보강조치가 필요하다. 본 연구에서는 치수 및 경제적인 측면에서 현실적인 대안을 강구하기 위하여 기존의 중.소규모 댐들을 저수지 규모 및 여수로 형식별로 분석하였고, 홍수배제능력증대사례를 조사하여 중.소규모 댐들에 적용 가능하다고 판단되는 몇 가지의 여수로 개축모형(안)을 선정하였다. 또한 선정된 개축모형(안) 중에서 1차적으로 Labyrinth spillway의 경우에 대한 방류능력증대 효과를 3차원 수치해석을 통하여 검토한 결과 초기방류량의 증가에 따른 홍수조절효과로 개축전의 월류수심 2.40m를 2.05m로 낮출 수 있고 기준 여유고를 확보할 수 있는 것으로 분석되었다.

  • PDF

최대가능홍수량 적용에 따른 농업용 저수지의 수문학적 안정성 분석 (Analysis on Hydrologic Stability of Agricultural Reservoir Using Probable Maximum Flood)

  • 김상우;맹승진
    • 한국관개배수논문집
    • /
    • 제17권2호
    • /
    • pp.28-34
    • /
    • 2010
  • This study re-exams hydrologic stability on spillway outlet capacity of agricultural reservoirs using hydrologic data with current rainfall condition instead of project hydrologic data applied at design on Backgok reservoir located in Chungbuk province. It is concluded that Backgok reservoir is not hydrologically stable and therefore structural measures including the extension of spillway and non structural measures should be taken. Continuous basic plan for river maintenance including additional bank reinforcement to bottom river shall be carried out. Due to high peak flood with more than 290% compared to 200 year frequency probability flood which was design standard of the past in view of the results of calculating PMF according to revised design standard for reservoirs, there could a problem for securing rationality in case of applying PMF with design flood. Therefore, hydrological stability, construction, and maintenance cost shall be synthetically studied and reasonal application shall be made if the decision is made on applying PMF with design flood.

  • PDF

기존댐 치수능력 증대사업의 시행 방안 (A Plan on the Flood Control Ability Improvement Project to maintain stability of existing dams)

  • 이완호;안희복
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.191-201
    • /
    • 2006
  • The flood control ability improvement project on existing dams is the project for prevention of disasters from excessive flood due to climate changes and thus protects lives and property damages by increasing safety of dams. The collapse of dam brings unimaginable disasters, so the project needs to be swiftly conducted by Government's funding. This paper introduces tile examples of the flood control ability improvement projects of multi-purpose and water supply dams, which is conducted in the way of structural measures among 26 dams operated by Kwater.

  • PDF

댐여수로 수문교각의 정적 거동 예측을 위한 구조 모형시험 (Structural Model Testing of Spillway Pier Subjected to Static Load)

  • 이명규;장봉석;이형준;하익수;김형수;고성기
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 봄학술 발표회 논문집(I)
    • /
    • pp.115-118
    • /
    • 2005
  • In this study, small scale model test was performed to verify the ultimate load capacity of spillway pier structure under static load. The 1/20 scale test specimen was made of specially designed micro-concrete and wire mesh. From the test result, the cracking load of specimen was 10 tonf and the ultimate was 19tonf. From the similarity rule, cracking and ultimate load of prototype pier structure were predicted 4000 tonf, 7600 ton, respectively.

  • PDF

삼각형 단일 Labyrinth 위어의 수리특성 연구 (A Study on Hydraulic Characteristics for Labyrinth Weir of Triangle Single Type)

  • 임장혁;박영진;백경원;송재우
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.191-194
    • /
    • 2008
  • Labyrinth weir is a hydraulic structure that can maintain constant water depth and increase overflow rate by increasing overflow width of weir through complicated displacement of its cross section. The labyrinth weir can be widely applied to various hydraulic facilities such as dam spillway, irrigation facilities, and canal structures. To date, however, few labyrinth weirs were applied to hydraulic facilities in Korea. Hence, in-depth research on labyrinth weir is highly required to efficiently apply the labyrinth weir to hydraulic facilities. This study was performed to analyze the hydraulic characteristics according to triangle labyrinth weir using hydraulic model experiments. The hydraulic characteristics provided in this study, which make it feasible to increase the overflow rate, and are expected to be widely applied to design of hydraulic facilities such as dam spillway and irrigation system.

  • PDF