• 제목/요약/키워드: specialty construction work

검색결과 28건 처리시간 0.019초

전문건설업체 측면에서 전문공종 시공업무 장애 요인에 관한 연구 (A Study on the Obstacle Factors of Construction Works in terms of the Specialty Contractors)

  • 양진국;이기훈;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.155-156
    • /
    • 2021
  • Most of the construction works in domestic are not direct undertaking work, but by a contract method including subcontracting. Therefore, a general contractor for each project jointly carry out construction work with a specialty contractor for each engineering type. However, in terms of contract, this method is not a joint venture contract, but a subcontract. Accordingly, this system can cause various problems between the prime contractor and the subcontractor. Therefore, this study aims to extract and present the actual obstacle factors in terms of specialty contract company performing specialty construction work for construction project. The presented contents are expected to present the standard for the cooperation system that the prime contractor and the subcontractor can win-win.

  • PDF

전문건설업체 종사자의 업무수행수준 및 필요역량요인 분석 (Analysis of the Level and Competence Factors on Specialty Contractors' Employees)

  • 홍성호;정대운;오치돈
    • 한국건설관리학회논문집
    • /
    • 제16권2호
    • /
    • pp.54-64
    • /
    • 2015
  • 최근 건설산업의 환경변화에 따라 전문건설업체 종사자의 업무수행능력 향상을 통한 업체 경쟁력 강화가 요구되고 있다. 이에 본 연구는 전문건설업체 종사자의 능력향상에 가장 효율적인 방법이 교육이라는 점을 인식하고, 이들을 대상으로 한 효과적인 교육, 나아가 맞춤형 교육 프로그램 개발에 기초자료로 활용될 수 있는 직무별 경력별 업무수행수준 분석과 필요역량요인을 파악하기 위한 목적으로 수행되었다. 이를 위해 전문건설업체의 대표, 현장소장, 공사담당, 공무담당, 자재/노무담당, 안전담당 등을 대상으로 설문조사를 실시한 후, 이들의 업무부담수준과 업무수행 능력수준비 등 업무수준을 분석하였으며, 직무별 필요역량요인을 파악하였다. 본 연구의 분석결과를 통해 향후 전문건설업체 종사자의 직무별 경력별 특성을 반영한 수요자 중심의 맞춤형 교육이 가능 할 것으로 판단된다.

전문건설업 유형별 효율성 분석 연구 (A Study on the Efficiency Analysis of Specialty Construction Industry Type)

  • 김예정;유동영;박선구
    • 한국콘텐츠학회논문지
    • /
    • 제19권5호
    • /
    • pp.64-73
    • /
    • 2019
  • 본 연구는 전문건설업체의 경쟁력을 평가하기 위해 DEA모형을 활용하여 효율성을 분석하였다. 분석대상기업은 전문건설업 상장업체와 외감업체로 2010년부터 2017년까지 연속자료가 존재하는 300개 기업을 대상으로 하였다. 특히, 전문건설업 유형별 효율성을 비교, 분석하여 그 시사점을 찾는데 중점을 두었다. 의미 있는 분석결과는 다음과 같다. 첫째, 전문건설업체의 효율성은 전반적으로 종합건설업 등과 비교하면 효율성 값이 낮게 분석되었다. 둘째, 전문건설업 유형별 효율성은 시설물축조 및 해체 전문공사업이 가장 높게 나타났다. 이는 해당 업종인 철근 콘크리트공사업, 비계 구조물해체공사업 등이 전문건설업 내에서 상대적으로 효율적임을 의미한다. 셋째, 전문건설업 효율성은 건설경기에 영향을 받는다. 건설경기가 확장국면에 있을 때는 효율성 값이 높고, 수축국면에서는 낮은 효율성 값을 나타내었다. 마지막으로 규모수익성 분석에서 전문건설업은 DRS로 분석되는 경우가 가장 많았다. 이는 규모 확대보다 규모 축소를 통해 기업의 효율성을 높이는 것이 바람직하다는 것을 의미한다.

멀티프로젝트를 수행하는 전문건설업체의 최적인력관리방안 기초연구 - 철근.콘크리트공사 중심으로 - (A Study on the Human Resource Management of the Specialty Contractors Performing Multi Projects -Focused on Rebar and Concrete Work-)

  • 서종민;나영주;김선국
    • 한국건축시공학회지
    • /
    • 제8권5호
    • /
    • pp.67-73
    • /
    • 2008
  • Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment In a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it's imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.

건설사업관리자의 역량기반 경력관리체계 구축 방안 (Competency-Based Career Management System Plan for Construction Manager)

  • 정서영;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.

  • PDF

전문건설업체 종사자 교육 프로그램의 현황과 개선방향 (The Status and Improvement Scheme of Educational Program for Specialty Contractors' Employees)

  • 홍성호;정대운;신주열;이동욱
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2563-2573
    • /
    • 2013
  • 전문건설업체의 관리자 및 기술자의 역량에 따라 건설산업 경쟁력과 관련된 기능공 및 임시 근로자의 노동생산성이 좌우된다. 그러므로 건설산업 경쟁력을 향상하기 위해서는 교육 프로그램을 통한 전문건설업체 관리자 및 기술자의 역량강화가 절실히 요구된다. 그러나 전문건설업체의 관리자 및 기술자 교육에 관한 연구는 한정적이거나 수행된 바 없는 실정이다. 따라서 본 연구는 전문건설업체 종사자 대상 교육의 현황과 문제점을 파악하고, 개선방안의 일환으로 수요자 맞춤형 교육 프로그램 개발방향을 마련하기 위해 수행되었다. 이를 위해 교육 프로그램에 관한 광범위한 문헌검토가 이루어졌으며, 현행 전문건설업체 종사자의 교육 현황과 문제점, 그리고 요구사항을 파악하기 위해 설문조사를 실시하였다. 문헌 및 설문조사 결과를 바탕으로 전문건설업체 종사자 맞춤형 교육 프로그램의 개발방향을 교육내용, 방법 및 형태, 시간으로 구분하여 제안하였다.

디지털 패브리케이션 전문 건설업체 역할 및 성과 분석 - 비정형 포디움 시공 사례를 중심으로 - (Specialty Contractor's Role and Performance Analysis for Digital Fabrication - Focusing on the case of irregular podium construction -)

  • 함남혁;안병주;김재준
    • 한국BIM학회 논문집
    • /
    • 제8권1호
    • /
    • pp.43-55
    • /
    • 2018
  • Recently, there have been increasing studies on the application of digital technology, which has its focus of the irregular building. However, most of these studies have not clarified the objective of the technology and the effectiveness of professional manpower on its performance. This study analyzes actual used technology and the role of specialty contractor. It presents a framework to quantify the performance of the specialty contractor. For these purposes, this paper presents a proposed method to evaluate the activities of specialty contractors using a queueing model. As an attempt to verify the model, an actual irregular building project, in which digital fabrication is applied, is investigated during the construction phase. In order to collect the digital fabrication data, digital fabrication reports and specialty contractor's work log of project are reviewed. In addition, Digital Fabrication input personnel, productivity data are collected through interviews with experts involving in the case project. Analysis of specialty contractor's performance in digital fabrication reveals that the wait status of project participants varies probabilistically depending on the digital technology application level. The results of this study are expected to contribute toward the improvement of the production level in the construction industry.

IPA 기법을 활용한 전문건설업체 종사자의 직무별 역량요인 분석 (Analysis of Competence Factors Assessment for Specialty Contractors' Employees using IPA)

  • 홍성호;정대운;오치돈
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.21-30
    • /
    • 2015
  • 최근 분리발주 활성화와 같이 지속적인 건설산업의 정책적 환경변화 속에서 실질적인 공사업무를 담당하고 있는 전문건설업체 종사자는 종합건설업체와 유사한 업무를 수행하고 있음에도 불구하고 상대적으로 낮은 역량수준을 보유하고 있는 것으로 평가되고 있는 실정이다. 이에 본 연구는 전문건설업체 종사자의 업무수행에 필요한 역량요인의 중요도와 현재역량 수준을 분석하여 향후 개선이 필요한 역량항목을 도출하기 위한 목적으로 수행되었다. 이를 위해 전문건설업체의 대표, 현장소장, 공사담당, 공무담당, 자재/노무담당, 안전담당 등을 대상으로 설문조사를 실시하여 각 직무별 필요역량요인에 대한 중요도 및 현재역량 수준을 파악하였으며, IPA 기법을 이용하여 분석을 실시하였다. 본 연구의 결과는 향후 전문건설업체 종사자의 직무별 역량강화를 위한 교육 프로그램의 개발 등에 활용될 수 있을 것으로 판단된다.

전문건설업체 작업일보의 정보구성에 관한 연구 (Information Constitution of Daily Job-Site Report for Specialty Contractors)

  • 이강민;신원상;이동은;김대영;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.279-280
    • /
    • 2012
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is questionable if the reliability and/or authenticity of the system is acceptable due to the lack of consistent enactment and/or revision procedures. This study identifies informational conditions and issues relative to using daily work report as a data collection method for enacting and/or revising CSPU system, and establishes the measures for improving the daily work report. This study aims on the information constitution of daily job-site report, daily manpower report, wages register for specialty contractors. According to the research results, most of necessary data were included in a daily job-site report. In conclusion, it is investigated that data of daily manpower report and wage register need to be included in a daily job-site report for understanding the current state of worker in the future.

  • PDF

시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 - (A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works -)

  • 이주성;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제5권3호
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.