• Title/Summary/Keyword: specialty construction work

Search Result 28, Processing Time 0.024 seconds

A Study on the Obstacle Factors of Construction Works in terms of the Specialty Contractors (전문건설업체 측면에서 전문공종 시공업무 장애 요인에 관한 연구)

  • Yang, Jin-Kook;Lee, Ki-Hun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.155-156
    • /
    • 2021
  • Most of the construction works in domestic are not direct undertaking work, but by a contract method including subcontracting. Therefore, a general contractor for each project jointly carry out construction work with a specialty contractor for each engineering type. However, in terms of contract, this method is not a joint venture contract, but a subcontract. Accordingly, this system can cause various problems between the prime contractor and the subcontractor. Therefore, this study aims to extract and present the actual obstacle factors in terms of specialty contract company performing specialty construction work for construction project. The presented contents are expected to present the standard for the cooperation system that the prime contractor and the subcontractor can win-win.

  • PDF

Analysis of the Level and Competence Factors on Specialty Contractors' Employees (전문건설업체 종사자의 업무수행수준 및 필요역량요인 분석)

  • Hong, Sung-Ho;Jung, Dae-Woon;Oh, Chi-Don
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.54-64
    • /
    • 2015
  • It is required to be enhancement of competitiveness for specialty contractors' employees due to specialty contractors are in charge of the actual construction work. The effective educational program for specialty contractors' employees is essential to improve the work performance of them. Therefore, the purpose of this study is to analyze level of work performance and find factors of core competence for specialty contractors' employees that can be utilized for development of effective educational program. The survey is based on CEO, Engineer and Manager in specialty contractors, and a questionnaire survey was performed to investigate the importance of job task, work load and degree of work difficulty as well as their core competence needs. The analysis result of this study can be utilized for development of effective educational program which is reflected the characteristics of specialty contractor's employees.

A Study on the Efficiency Analysis of Specialty Construction Industry Type (전문건설업 유형별 효율성 분석 연구)

  • Kim, Ye-Jung;Yoo, Dong-Young;Park, Sun-Gu
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.5
    • /
    • pp.64-73
    • /
    • 2019
  • This study analyzed the efficiency by using the DEA model to evaluate the competitiveness of specialty construction firms. The target of the analysis is 300 firms with continuous data from 2010 to 2017 as listed and externally listed firms. Significant analysis results are as follows. First, the efficiency of specialty construction firms is lower than that of general construction industry. Second, efficiency by type was highest in facilities construction and dismantling work. This shows that the relevant industries such as reinforced concrete works and scaffolding and demolition work are relatively efficient in specialty construction industry. Third, the efficiency of specialty construction industry is affected by economic fluctuations. When the construction industry is in the expansion phase, the efficiency value is high and the efficiency value is low in the down phase. Finally, in the scale profitability analysis, specialty construction industry was most analyzed by DRS. This means that it is effective to scale down for the efficiency of the firm.

A Study on the Human Resource Management of the Specialty Contractors Performing Multi Projects -Focused on Rebar and Concrete Work- (멀티프로젝트를 수행하는 전문건설업체의 최적인력관리방안 기초연구 - 철근.콘크리트공사 중심으로 -)

  • Seo, Jong-Min;Na, Young-Ju;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.67-73
    • /
    • 2008
  • Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment In a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it's imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.

Competency-Based Career Management System Plan for Construction Manager (건설사업관리자의 역량기반 경력관리체계 구축 방안)

  • Jung, Seo-Young;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.

  • PDF

The Status and Improvement Scheme of Educational Program for Specialty Contractors' Employees (전문건설업체 종사자 교육 프로그램의 현황과 개선방향)

  • Hong, Sung-Ho;Jung, Dae-Woon;Shin, Ju-Yeoul;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2563-2573
    • /
    • 2013
  • Specialty contractors are in charge of the actual construction work and managing many work force in construction sites. The effective educational program for specialty contractors' employees is essential to improve the competitiveness of construction industry. However, there is no in-depth research on training programs for their management or technical staff. Therefore, this study proposes a framework of educational program for the specialty contractors' employees in order to enhance their competence. An extended review of literature related the educational program was carried out to understand the concept, structure, and element of the education system. A questionnaire survey for specialty contractors' employees was performed to investigate the status and problems of educational programs as well as the their educational needs. Based on the survey, the demand-oriented education programs is required to meet the needs of specialty contractors' employees. The framework of demand-oriented education programs for specialty contractors' employees consists of training contents, training type and method, training hour.

Specialty Contractor's Role and Performance Analysis for Digital Fabrication - Focusing on the case of irregular podium construction - (디지털 패브리케이션 전문 건설업체 역할 및 성과 분석 - 비정형 포디움 시공 사례를 중심으로 -)

  • Ham, Nam-Hyuk;Ahn, Byung-Ju;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.43-55
    • /
    • 2018
  • Recently, there have been increasing studies on the application of digital technology, which has its focus of the irregular building. However, most of these studies have not clarified the objective of the technology and the effectiveness of professional manpower on its performance. This study analyzes actual used technology and the role of specialty contractor. It presents a framework to quantify the performance of the specialty contractor. For these purposes, this paper presents a proposed method to evaluate the activities of specialty contractors using a queueing model. As an attempt to verify the model, an actual irregular building project, in which digital fabrication is applied, is investigated during the construction phase. In order to collect the digital fabrication data, digital fabrication reports and specialty contractor's work log of project are reviewed. In addition, Digital Fabrication input personnel, productivity data are collected through interviews with experts involving in the case project. Analysis of specialty contractor's performance in digital fabrication reveals that the wait status of project participants varies probabilistically depending on the digital technology application level. The results of this study are expected to contribute toward the improvement of the production level in the construction industry.

Analysis of Competence Factors Assessment for Specialty Contractors' Employees using IPA (IPA 기법을 활용한 전문건설업체 종사자의 직무별 역량요인 분석)

  • Hong, Sung-Ho;Jung, Dae-Woon;Oh, Chi-Don
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.21-30
    • /
    • 2015
  • Recently, the construction policy is rapidly changing and construction project becomes larger and more complex. Specialty contractors are in charge of the actual construction work, but they are considered to have low competence level. To strengthen competence of specialty contractors' employees, above all, it is essential to evaluate and to analyze the competence factors level for specialty contractors' employees. However, there is no in-depth research on competence factors level for specialty contractors. Therefore, the purpose of this study is to analyze the competence factor in order to find the high priority factor. The result of this study can be utilized for development of effective educational program for enhance specialty contractors' competence.

Information Constitution of Daily Job-Site Report for Specialty Contractors (전문건설업체 작업일보의 정보구성에 관한 연구)

  • Lee, Kang-Min;Shin, Won-Sang;Lee, Dong-Eun;Kim, Dae-Young;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.279-280
    • /
    • 2012
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is questionable if the reliability and/or authenticity of the system is acceptable due to the lack of consistent enactment and/or revision procedures. This study identifies informational conditions and issues relative to using daily work report as a data collection method for enacting and/or revising CSPU system, and establishes the measures for improving the daily work report. This study aims on the information constitution of daily job-site report, daily manpower report, wages register for specialty contractors. According to the research results, most of necessary data were included in a daily job-site report. In conclusion, it is investigated that data of daily manpower report and wage register need to be included in a daily job-site report for understanding the current state of worker in the future.

  • PDF

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.