• Title/Summary/Keyword: soil piling

Search Result 41, Processing Time 0.025 seconds

A Study on the Soil Conversion Factor of Underwater Soils (수중토사의 토량환산계수에 관한 연구)

  • Park, Sung-Sik;Bae, Yeon-Hoi;Moon, Hong-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.7
    • /
    • pp.5-12
    • /
    • 2015
  • In this study, the deposition of dredged soils from domestic rivers is simulated in the laboratory using a small soil box. In the tests, small sand with 0.002-0.85 mm, large sand with 0.85-2 mm, and gravel 4.75-5.6 mm are air or water-pluviated into the box. Such various deposition processes are simulated and their dry densities are measured. While dredging or piling such soils, their volume may change. The loss of such soils is calculated by a soil conversion factor C. The C value was determined as 0.91 for small sand, 0.96 for large sand, and 0.91 for gravel. The drainage through soil piles may occur and result in effective stress increase. This may cause the volume change of soils and in order to consider such effect it is necessary to recalculate C values. As a result, dry density increased by 5-12% when the drainage effect is considered. When the drainage effect is considered, the value of soil conversion factor C was 0.81 for small sand, 0.92 for large sand, and 0.82 for gravel. Eventually, the C value decreased up to 4-12%.

Measurement and Control of Ground Vibrations due to Precast Concrete Pile-driving by Diesel Hammer (디젤해머에 의한 콘크리트말뚝 항타시(抗打時) 발생(發生)되는 지반진동(地盤振動)의 측정(測定) 및 영향평가(影響評價))

  • Park, Yean Soo;Chon, Chun Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.9 no.1
    • /
    • pp.71-78
    • /
    • 1989
  • This Paper measures and analyzes ground vibrations induced during precast concrete pile-driving using diesel hammer at radii varying from 9m to 30m to evaluate effects of such vibrations associated with deep foundation piling operations near the residential of commercial areas. From this study, characteristics for attenuation and frequency of the vibrations casued by pile-driving are established and the empirical equation for predicting peak velocity and acceleration levels are obtained. This equation can be used to predict the peak vibration levels and select the appropriate hammers for future projects where similar soil conditions to this test site are encountered.

  • PDF

Estimation of End Bearing Capacity of SDA Augered Piles on Various Hearing Stratums (지지지반의 종류별 SDA매입말뚝의 선단지지력 산정)

  • Hong, Won-Pyo;Chai, Soo-Geun
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.5
    • /
    • pp.111-129
    • /
    • 2007
  • The standard construction manual of the SDA(Separated Doughnut Auger) piling method was proposed so that the resisting capacity of the augered piles could work effectively. 405 dynamic pile load tests and 30 static pile load tests were performed for 265 test piles, which were installed by the SDA piling method in 33 sites in Korea. The results of the pile load tests showed that the end bearing capacity of the SDA augered piles depended on the property of various soil stratums and did not agree with ones estimated by the existing formula based on several standard design codes. On the basis of the pile load test results, four formulas were presented according to bearing stratums to estimate quantitatively the unit end bearing capacity of the SDA augered piles. The formulas for the unit end bearing capacity of piles on soils or weathered rocks were related to N-value given by SPT(Standard Penetration Test), while the unit end bearing capacity on bedrock was suggested to be more than 1500 $tf/m^2$. The presented formulas were compared with the existing formulas, which were presented by several standard design codes to design the augered piles. In order to use correctly the presented formulas, the quality of Standard Penetration Test should be controlled precisely. Also it is desirable to choose a pilot construction site, where both dynamic and static pile load tests are performed.

Best Management Practices Reducing Soil Loss in the Saprolite Piled Upland in Hongcheon Highland (고령지 석비레 성토 밭의 토양유실 저감을 위한 최적영농관리방안)

  • Park, Chol-Soo;Jung, Yeong-Sang;Joo, Jin-Ho;Lee, Jung-Tae
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.38 no.3
    • /
    • pp.119-126
    • /
    • 2005
  • Soil erosion at Jawoon-Ri in Hongcheon highland is one of serious problems since saprolite piling on farmland has been typically practiced at 2-3 year's intervals. The objective of the case study was to survey management practices such as tillage, application of saprolite, and cultivating crops and to propose best management practices (BMP) to reduce soil loss in Jawoon-Ri, Hongcheon-Gun. Jawoon-Ri is located in the upper stream of Naerinchun. Upland areas of Jawoon 2 and 4Ri were 206.9 and 142.3 hectare, respectively. Estimation of soil loss in this study was based on USLE (Universal soil loss equation). Annual averaged soil losses were 15.6 MT per hectare in Jawoon-2Ri and 9.0 MT per hectare in Jawoon-4Ri, respectively. This case study tried to find methods to reduce soil erosion below tolerant soil loss level which is $11MT\;ha^{-1}\;yr^{-1}$. Estimated soil losses in more than 40% of uplands in Jawoon-2Ri and 4Ri were higher than tolerant soil loss level. Especially, edge of uplands undergone excessive soil erosion by concentrated runoff water. Therefore consolidation of upland edge was included as one of the proposed Best management practices BMP). The proposed BMP in this area were buffer strips, contour and mulching, diversion drain channel, grassed water-way, detour watet-way and cover crops and so on. Amounts for BMP requirements were 7,680 m for buffer strips, 123 ha (35%) for contour and mulching, 201 ha (57%) for diversion drain channel, 13,880 m for grassed water-way, 3,860 m for detour drainage, 8,365 m for sloping side consolidation and 3,492 ha for cover crops, respectively. Application of BMP are urgently needed in uplands which is direct conjunction with stream.

Estimation of Bearing Capacity of SIP Pile Installed by Improved Criteria (개선된 기준으로 시공된 SIP 말뚝의 지지력 평가에 관한 연구)

  • Park, Jong-Bae;Kim, Jung-Soo;Lim, Hae-Sik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.5 no.3
    • /
    • pp.5-15
    • /
    • 2004
  • SIP has been widely used as a low noise and vibration piling method in Korea. But the quality control of SIP was not properly settled down and field workers did not fully understand the principle of SIP method. So not a less troubles were raised at construction site and bearing capacity was not fully mobilized. To settle these problems, Korea National Housing Corporation amended the construction and load test criteria of SIP in 2002. After load tests on the SIPs installed in field according to the new criteria, we found that the bearing capacity in field vs the design load ratio increased and bearing characteristics was enhanced than that installed by the former criteria. To consider the enhanced bearing characteristics in the pile design and determine the adequate design criteria, this paper analyzed the accuracy of design criterion which were commonly used in Korea comparing with the load test results. Analysis result shows that Meyerhof criteria(1976) properly simulates the bearing capacity of SIP installed by the new construction and load test criteria.

  • PDF

Prediction of Driving Stresses in Piles (항타응력 추정)

  • 진병익;황정규
    • Geotechnical Engineering
    • /
    • v.3 no.1
    • /
    • pp.25-38
    • /
    • 1987
  • The prediction of driving stresses in piles is necessary for optimum selection of driving hammers, better design of precast piles, enact assessment of drivabilities and complete description of piling specifications. However, the existing pile-driving formulas based on the theory of Newtonian impact have some defects and shortcomings; the numerical method by the wave equation analysis using electronic computer usually Involves various uncertainties and limitations which can yield erroneous outcomes because it employs soil constants of which the nature is unknown as essential parameters and ignores the effect of residual stresses set up in the pile .after each hammer blow; and the electronic measuring technique needs extra time and expense. The method developed herein is presented for the purpose of giving field engineers a reliable and convenient analytical procedure for the prediction of driving stresses along the full length of pile using the most effetive parameters without resort to electronic computer. This method is based on the fundamental mechanics of stress waves in elastic rods and takes into account the effect of residual stresses induced by reversed friction in piles.

  • PDF

Study on Application of PIR-D(Pile Installation Recorder-Driven Pile) in Driven Pile (항타 말뚝에서 항타관리시스템(Pile Installation Recorder-Driven Pile)의 적용성에 관한 연구)

  • Park, Bong-Keun;Park, Min-Cheul;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.28-35
    • /
    • 2004
  • Driven pile has the excellent bearing characteristics and good economics, so it is known as the comparative piling method. To use the advantages of driven pile fully, it is necessary to perform the proper construction management. Engineers must drive pile to the proper bearing layer with proper blow energy and measure the blow count and penetration per certain depth to analyze the bearing capacity and driveability. In conventional method, these parameters have been measured manually so it was difficult to get good accuracy. After PIR-D(Pile Installation Recorder-Driven Pile) was attached to the driving equipment, the hammer efficiency, blow count and penetration in blow/10cm were measured automatically. In this paper, to givethe rational judgement criteria of bearing layer, driveability, blow/10cm according to pile depth during pile driving, the some relationship between the driving resistance and ground layer distribution was analyzed. The ground investigation during piles (PHC ${\Phi}450,\;{\Phi}400\;&\;Steel\;Pile\;{\Phi}609{\ast}16t$) installation in the marine clay layer in Incheon, the sandy soil layer in Yongin and the tuff layer in Pusan was done. And measuring hammer efficiency not doing recently, we could compare hammer efficiency(Eh) by PIR-D and energy transfer ratio(ETR) by Pile Dynamic Analyzer(PDA).

  • PDF

A study on Furniture Design as Object by Fusion Approaching with Wood and Ceramics (목재와 도자 소재의 융합적 접근에 의한 오브제 기능의 가구 연구)

  • Chung, Yong Hyun;Choi, Kyung Ran
    • Korea Science and Art Forum
    • /
    • v.19
    • /
    • pp.601-612
    • /
    • 2015
  • Postmodernism has blurred the line between design and art. We would like to suggest a design case that took diversity in the modern era that harmonizes functionality and shape of the top board of a furniture and trend of the role of furniture and objet into consideration. This study aims to project a new role into space via convergence of objet that has aesthetic function and furniture design that plays practical role in space. Thus, furniture design attempts to combine ceramic and carpentry and demonstrate the value and potential the combination possesses. By creating a distinct design from previous furniture that had visual limitations with ceramic bridge that adopted existing piling method in ceramic design, we expect a fresh blend of furniture and space that encompasses a different sensation from color and texture of soil and glaze, unable to attain from simple wood.

Studies on the Utilization of Exothermic Heat Composting during Winter Season (동계(冬季) 퇴비부숙열(堆肥腐熟熱) 이용(利用)에 관(關)한 연구(硏究))

  • Kim, Sung-Pil;Park, Young-Dae;Joo, Young-Hee;Uhm, Dae-Ik
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.17 no.3
    • /
    • pp.283-288
    • /
    • 1984
  • This study was conducted to evaluate the characteristics of exothermic heat and compost generated from decomposition of organic wastes composts were piled up with various sources of raw materials of rice straw, rice husk, human and animal wastes. The duration of generated exothermic heat during compositing process was longer in mixture piles of rice straw/rice husk ratio of 1:1 compared to rice straw alone. Temperature in compost piles added with phosphate as fused superphosphate fertilizer was rapidly increased at the earlier stage of composting and gradually decreased in 30 days compared to the check. pH of compost showed 5.5 at initial piling, however, its peak appeared 8.8 in 10 days with rapidly increasing temperature of compost and maintained around 8.3 after one month. Compost of mixture of rice straw and chicken droppings maintained temperature ranges of 30 to $65^{\circ}C$ for 39 days, compost of rice straw, rice husk and chicken droppings for 69 days, piles of rice straw, rice husk and hog manure for 56 days, mixture of rice straw, rice husk and cow manure for 66 days and compost of rice straw, rice husk and human wastes for 21 days.

  • PDF

A Study on the Wall and Reservoir at the Valley Part of Stone Fortress - Focused on the Fortress of $Geoyeol-seong$ and $Seongsan-seong$ - (석축 산성의 계곡부 체성과 못(池)에 관한 연구 - 거창 거열성과 함안 성산산성을 중심으로 -)

  • Kwon, Soon-Kang;Lee, Ho-Yeol;Park, Un-Jung
    • Journal of architectural history
    • /
    • v.20 no.3
    • /
    • pp.7-22
    • /
    • 2011
  • With the accumulations of outcomes from archaeological excavations of mountain fortress of three kingdoms period, there have been studies about time-periodic territory range of mountain fortress, difference in the way(method) of construction, defence system and so on from various points of view. This is an empirical study on the construction method of the valley part of stone fortress. First of all, it is required to secure large quantity of fresh water for those who lived at mountain fortress. Especially when builders of fortress construct a fortification at the valley part of stone fortress, in advance they must sufficiently consider several options including the establishment of sustainable water resources. First, when it comes to build a fortification on a ridge[or a slope] of a mountain, you have only to consider a vertical stress. However, when it comes to build a fortification at the valley part of a mountain, You must have more sufficient preparations for the constructing process. Because there are not only a vertical stress but also a horizontal pressure simultaneously. Second, a fortification of mountain fortress built by using unit building stone is a structure of masonry construction like brick construction, and the valley part of it is where the construction of the fortification begins. Third, when it comes to build a fortification at the valley part of a mountain, it seems that they use a temporary method such as coffer dam in oder to prevent the collapse of the fortification due to heavy rain. Furthermore, in response to a horizontal pressure a fortification is built by the way of its plane make an arch, or by piling up the soil with the plate method(類似版築) and earthen wall harder method(敷葉) they increase cross-sectional area of the fortification and its cutoff capacity. In front direction they put the reservoir facility for the fear that the hydraulic pressure and earth pressure are directly transmitted to the fortification. The process of constructing the fortification at the valley part of a mountain is done in the same oder as follows; leveling of ground(整地) ${\Rightarrow}$ construction of coffer dam ${\Rightarrow}$ construction of the fortification between the both banks of the valley ${\Rightarrow}$ construction of the fortification at bottom part of spill way(餘水路) between the both banks of the valley ${\Rightarrow}$ construction of spill way(餘水路) & reservoir facility ${\Rightarrow}$ construction of the fortification at upper part of spill way between the both banks of the valley. Coffer dam facility seems to be not only the protection device on occasion of flood but also an important criterion to measure the proper height of spill way or tailrace(放水路). This study has a meaningful significance in that it empirically examines the method of reduction of the horizontal pressure which the fortification at the valley part of a mountain takes, the date the construction was done, and wether the changes in climate such as heavy rainfall influence the process of construction.