• Title/Summary/Keyword: small dam

Search Result 291, Processing Time 0.023 seconds

Flood Water Level Changes Analyses for the Construction of a Small Dam -Focused on the Geum River Reach in Sejong City- (수위유지시설 설치에 따른 홍수위 변화 해석 - 세종시 금강 구간을 중심으로 -)

  • Jeong, Sang-Man;Park, Chan-Seong;Lee, Joo-Heon;Shin, Kwang-Seob
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.2
    • /
    • pp.59-68
    • /
    • 2009
  • Currently, building a small dam located 1.16 km downstream from Geumnam Bridge is being considered in order to improve the riverine scenery of the site for Sejong City and to create a hydrophilic space. The purpose of this research is to present the appropriate dimensions of a small dam by reviewing the flood control reliability of the Geum River after the small dam is built. To establish this purpose, changes in the flood water level were compared and analyzed by changing the installation height of a small dam using 1D and 2D models. 1D HEC-RAS and 2D FESWMS models were applied to perform the numerical analysis of the reach. The results showed that flood control reliability was guaranteed when the installation height of the small dam was 5 meters or lower. From the 2D model, a more accurate result can be developed because the model could provide a two dimensional numerical analysis. The results can be used to determine the appropriate dimensions of a small dam for Sejong City.

Analysis of Fluid-Structure Interaction for Development of Korean Inflatable Rubber Dams for Small Hydropower (소수력 발전용 한국형 공기주입식 고무댐 개발을 위한 유체-구조 연성 해석)

  • Hwang, Tae-Gyu;Kim, Jin-Gu
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.8
    • /
    • pp.1221-1230
    • /
    • 2008
  • Inflatable rubber dams are used for controlling flood, impounding water for recreations, preventing beach erosions, diverting water for irrigations, and generating hydropower. They are long, flexible, inflated with air, cylindrical structures on a rigid horizontal foundation such as concrete. The dam is modeled as an elastic shell inflated with air. The mechanical behaviors of the inflated dam model were investigated by using the finite element method. The analysis process such as One Way Coupling Fluid-Structure Interaction consists of two steps. First, the influences of the fluid side were investigated, viz, the shape changes of the inflated rubber dam due to the fluid motions was captured when the height of the dam was 30cm with air pressure 0.01MPa, at which the pressure distributions over the surface of the dam were calculated. And next, the structural deformations were calculated using the pressure distributions. The initial inlet velocity for flow field was set to 0.1m/s. The structural deformation behaviors were investigated. The final research goal is to develop a Korean Inflatable Rubber Dam to be used for generating small hydropower.

Stream Eco-corridor Restoration by Out-aged Small Dam Removal - Focused on Gokreung River Gokreung 2 Small Dam Removal - (기능을 상실한 보 철거를 통한 하천생태통로 복원 - 곡릉천 곡릉2보 철거를 대상으로 -)

  • Ahn, Hong Kyu;Woo, Hyoseop;Rhee, Dong Seop;Kim, Kyu Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.2
    • /
    • pp.40-54
    • /
    • 2008
  • Small and large dams are installed in the course of a stream for maintaining the water level of the stream or obtaining agricultural water. Currently about 18,000 of them are installed in Korea to supply water. However, the environmental problems of small dams are well known : the interruption of stream eco-corridors, deterioration of water quality in the upper reaches of the small dam, changes in the habitats of riparian organisms, damages to the stream scenery. In a very few of these small dams artificial eco-corridors like fishways are installed, but the number is very minimal.Accordingly, to efficiently restore stream eco-corridors by removing these small dams, it will be necessary to closely examine physical impacts, such as changes in the riverbed and changes in the shape of the stream caused by the removal, chemical impacts, such as changes in water quality, and transport and accumulation of contaminated sediments and biological impacts, such as changes in the habitats of organisms, and develop related technologies in advance, and have these technologies verified through demonstration application in the sites. In this study, we analyzed the physical, chemical and ecological impacts of the removal of the above-mentioned small dams, and conducted a research on the demonstration small dam removal project for a spot investigation. As a result, the small dam removal will restore the eco-corridor, there by improving the habitat of fishes and crustaceans. The number of major underwater organisms inhabiting the Gokreungcheon, such as Korean spotted sleepers, Chinese minnows, Microphysogobio yaluensis, Abbottina rivularis, stone morokos, striped shinners, long-nosed barbels, and Chinese mitten crabs, is expected to increase, and the food chain in the ecosystem will improve so that species diversity will improve as well.

A Basic Study on Relative Liquefaction Failure Risk Assessment of Domestic Small to Medium-Sized Earthfill Dams (국내 중소규모 흙댐의 상대적 액상화 파괴위험도 평가 기초 연구)

  • Park, Tae Hoon;Ha, Ik-soo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.27 no.3
    • /
    • pp.147-155
    • /
    • 2023
  • This study aims to present a method to evaluate the relative risk of failure due to liquefaction of domestic small to medium-sized earthfill dams with a height of less than 15 m, which has little information on geotechnical properties. Based on the results of previous researches, a series of methods and procedures for estimating the probability of dam failure due to liquefaction, which calculates the probability of liquefaction occurrence of the dam body, the amount of settlement at the dam crest according to the estimation of the residual strength of the dam after liquefaction, the overtopping depth determined from the amount of settlement at the dam crest, and the probability of failure of the dam due to overtopping was explicitly presented. To this end, representative properties essential for estimating the probability of failure due to the liquefaction of small to medium-sized earthfill dams were presented. Since it is almost impossible to directly determine these representative properties for each of the target dams because it is almost impossible to obtain geotechnical property information, they were estimated and determined from the results of field and laboratory tests conducted on existing small to medium-sized earthfill dams in previous researches. The method and procedure presented in this study were applied to 12 earthfill dams on a trial basis, and the liquefaction failure probability was calculated. The analysis of the calculation results confirmed that the representative properties were reasonable and that the overall evaluation procedure and method were effective.

Application of Physical Habitat Simulation System (PHABSIM) in the Reach of Small Dam Removal for Zacco platypus (피라미에 대한 보 철거 구간에서의 물리서식처 모의(PHABSIM) 적용)

  • Im, Dong-Kyun;Jung, Sang-Hwa;Ahn, Hong-Kyu;Kim, Kyu-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.11
    • /
    • pp.909-920
    • /
    • 2007
  • River restoration and environmental improvement projects have been peformed by social needs, therefore methodology for evaluating such projects must be provided. The PHysical HABitat SIMulation system (PHABSIM) is proposed as a tool for the assessment of hydraulic habitat suitability for aquatic species related to flow regime in river. This study evaluates the change of physical habitat for Zacco platypus according to small dam removal and the model suitability by applying PHABSIM to the reach where small dam was removed. It is shown that the physical habitat is generally increased and improved where the small dam was removed. However, physical habitat in the spawning stage that has a weak swimming speed is decreased by increased flow velocity in the upstream area of small dam, so proper countermeasure for that condition should be needed. Consequently, PHABSIM can be effectively used to provide methodology for assessment and necessity of various river projects including a removal of out-aged hydraulic structures.

Dilemma of a small dam with large basin area under climate change condition

  • Jeong-Hyeok Ma;Chulsang Yoo;Tae-Sup Yun;Dongwhi Jung
    • Computers and Concrete
    • /
    • v.33 no.5
    • /
    • pp.559-572
    • /
    • 2024
  • Problems of under-sized dams (small dams with large basin area) could get worse under the global warming condition. This study evaluates the possible change of these problems with the Namgang Dam, an under-sized dam in Korea. For this purpose, first, this study simulates the dam inflow data using a rainfall-runoff model, which are then used as input for the reservoir operation. As a result, daily dam storage, dam release, and dam water supply are derived and compared for both past observed period (1973~2022) and future simulated period (2006~2099) based on the global warming scenarios. Summarizing the results are as follows. First, the inflow rate in the future is expected to be increased significantly. The maximum inflow could be twice of that observed in the past. As a result, it is also expected that the frequency of the water level reaching the high level is increasing. Also, the amount and frequency of dam release are to be increased in the future period. More seriously, this increase is expected to be concentrated on rather extreme cases with large dam release volume. Simply, the condition for flood protection in the downstream of the Namgang Dam is becoming worse and worse. Ironically, the severity of water shortage problem is also expected to become much worse. As the most extreme case, the frequency of no water supply was zero in the observed period, but in the future period, it becomes once every five years. Both the maximum consecutive shortage days and the total shortage volume are expected to become more than twice in the future period. To prevent or mitigate this coming problem of an under-sized dam, the only countermeasure at this moment seems to be its redevelopment. Simply a bigger dam with larger dam reservoir can handle this adverse effect more easily.

Analysis of Small reservoir system by Flood control ability augmentation (치수능력 증대에 따른 저수지시스템 분석)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.14 no.11
    • /
    • pp.995-1004
    • /
    • 2005
  • As a research establish reservoir safety operation for small dam systems. This study presents hydrologic analysis conducted in the Duckdong and Bomun dam watershed based on various rainfall data and increase inflow. Especially the Duckdong dam without flood control feature are widely exposed to the risk of flooding, thus it is constructed emergency gate at present. In this study reservoir routing program was simulation for basin runoff estimating using HEC-HMS model, the model simulation the reservoir condition of emergency Sate with and without. At the reservoir analysis results is the Duckdong dam average storage decrease $20\%$ with emergency gate than without emergency gate. Also, the Bomun dam is not affected by the Duckdong flood control augmentation.

A Riverbed Change Prediction by River-Crossing Structure -Focused on the Major River Reaches of the Multifunctional Administrative City- (하천 횡단구조물에 의한 하상변동 예측 - 행정중심복합도시 주요 하천구간을 중심으로 -)

  • Yeon, Kyu-Sung;Jeong, Sang-Man;Yun, Chan-Young;Lee, Joo-Heon;Shin, Kwang-Seob
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.1
    • /
    • pp.107-113
    • /
    • 2009
  • This study has been conducted for the long-term riverbed change prediction on Geum River and Miho Stream surrounding the planned Multifunctional Administrative City and the neighboring regions by the construction of a small dam. Based on the analysis of vertical riverbed changes of the cross-sectional data for the years 1988, 2002 and 2007, minimum bed elevation significantly decreased in both Geum River and Miho Stream in 2007 as compared to 1988. Compared to 2002, however, a slight elevation change was observed. To make a long-term prediction on riverbed changes by the construction of a small dam, a one dimensional HEC-RAS 4.0 model has been used. By the fixed bed model test, the water levels were calibrated. By using the cross-sectional data of 1988 and 2002, verification was conducted under a movable bed model. According to the prediction of riverbed changes for each scenario with varying height of small dam, minor impact is expected around Miho Stream while major impact is expected around Geum River by 2017, as the small dam height increases. If the small dam is 7m-high, for example, it's been simulated that 1.59m deposition would be expected around the upper stream of Miho Stream Confluence while 1.98m scour would be expected around the downstream of the small dam.

Hydrologic Safety Evaluation of Small Scale Reservoir by Simplified Assesment Method (간편법에 의한 소규모저수지의 수문학적 안전성 평가)

  • Lee, Joo-Heon;Yang, Seung-Man;Kim, Seong-Joon;Kang, Boo-Sik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.2
    • /
    • pp.9-17
    • /
    • 2011
  • Based on the statistical annual report, there are 17,649 reservoirs are operating for the purpose of agricultural water supply in Korea. 58 % of entire agricultural reservoirs had been constructed before 1948 which indicate the termination of required service life and rest of those reservoirs have also exposed to the dam break risk by extreme flood event caused by current ongoing climate change. To prevent damages from dam failure accident of these risky small size dams, it is necessary to evaluate and manage the structural and hydrological safety of the reservoirs. In this study, a simplified evaluation method for hydrologic safety of dam is suggested by using Rational and Creager formula. Hydrologic safety of small scale dams has evaluated by calculating flood discharge capacity of the spillway and compares the results with design frequency of each reservoir. Applicability and stability of suggested simplified method have examined and reviewd by comparing the results from rainfall-runoff modeling with dam break simulation using HEC-HMS. Application results of developed methodology for three sample reservoirs show that simplified assessment method tends to calculate greater inflow to the reservoirs then HEC-HMS model which lead lowered hydrologic safety of reservoirs. Based on the results of application, it is expected that the developed methodology can be adapted as useful tool for small scale reservoir's hydrologic safety evaluation.

Application of subspace identification on the recorded seismic response data of Pacoima Dam

  • Yu, I-No;Huang, Shieh-Kung;Loh, Kenneth J.;Loh, Chin-Hsiung
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.4
    • /
    • pp.347-364
    • /
    • 2019
  • Two seismic response data from the CSMIP strong motion instrumentation of Pacoima dam are selected: San Fernando earthquake (Jan 13, 2001; ML=4.3) and Newhall earthquake (Sept. 1, 2011; ML=4.2), for the identification of the dam system. To consider the spatially nonuniform input ground motion along the dam abutment, the subspace identification technique with multiple-input and multiple-output is used to extract the dynamic behavior of the dam-reservoir interaction system. It is observed that the dam-reservoir interaction is significant from the identification of San Fernando earthquake data. The influence of added mass (from the reservoir) during strong ground motion will create a tuned-mass damper phenomenon on the dam body. The fundamental frequency of the dam will be tuned to two different frequencies but with the same mode shapes. As for the small earthquake event, the dam-reservoir interaction is insignificant.