• Title/Summary/Keyword: site investigations

Search Result 305, Processing Time 0.024 seconds

토양 및 지하수 Investigation 과 Remediation에 대한 현장적용

  • Wallner, Heinz
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.11a
    • /
    • pp.44-63
    • /
    • 2000
  • Situated close to Heathrow Airport, and adjacent to the M4 and M25 Motorways, the site at Axis Park is considered a prime location for business in the UK. In consequnce two of the UK's major property development companies, MEPC and Redrew Homes sought the expertise of Intergeo to remediate the contaminated former industrial site prior to its development. Industrial use of the twenty-six hectare site, started in 1936, when Hawker Aircraft commence aircraft manufacture. In 1963 the Firestone Tyre and Rubber Company purchased part of the site. Ford commenced vehicle production at the site in the mid-1970's and production was continued by Iveco Ford from 1986 to the plant's decommissioning in 1997. Geologically the site is underlain by sand and gravel, deposited in prehistory by the River Thames, with London Clay at around 6m depth. The level of groundwater fluctuates seasonally at around 2.5m depth, moving slowly southwest towards local streams and watercourses. A phased investigation of the site was undertaken, which culminated in the extensive site investigation undertaken by Intergeo in 1998. In total 50 boreholes, 90 probeholes and 60 trial pits were used to investigate the site and around 4000 solid and 1300 liquid samples were tested in the laboratory for chemical substances. The investigations identified total petroleum hydrocarbons in the soil up to 25, 000mg/kg. Diesel oil, with some lubricating oil were the main components. Volatile organic compounds were identified in the groundwater in excess of 10mg/l. Specific substances included trichloromethane, trichloromethane and tetrachloroethene. Both the oil and volatile compounds were widely spread across the site, The specific substances identified could be traced back to industrial processes used at one or other dates in the sites history Slightly elevated levels of toxic metals and polycyclic aromatic hydrocarbons were also identified locally. Prior to remediation of the site and throughout its progress, extensive liaison with the regulatory authorities and the client's professional representatives was required. In addition to meetings, numerous technical documents detailing methods and health and safety issues were required in order to comply with UK environmental and safety legislation. After initially considering a range of options to undertake remediation, the following three main techniques were selected: ex-situ bioremediation of hydrocarbon contaminated soils, skimming of free floating hydrocarbon product from the water surface at wells and excavations and air stripping of volatile organic compounds from groundwater recovered from wells. The achievements were as follows: 1) 350, 000m3 of soil was excavated and 112, 000m3 of sand and gravel was processed to remove gravel and cobble sized particles; 2) 53, 000m3 of hydrocarbon contaminated soil was bioremediated in windrows ; 3) 7000m3 of groundwater was processed by skimming to remove free floating Product; 4) 196, 000m3 of groundwater was Processed by air stripping to remove volatile organic compounds. Only 1000m3 of soil left the site for disposal in licensed waste facilities Given the costs of disposal in the UK, the selected methods represented a considerable cost saving to the Clients. All other soil was engineered back into the ground to a precise geotechnical specification. The following objective levels were achieved across the site 1) By a Risk Based Corrective Action (RBCA) methodology it was demonstrated that soil with less that 1000mg/kg total petroleum hydrocarbons did not pose a hazard to health or water resources and therefore, could remain insitu; 2) Soils destined for the residential areas of the site were remediated to 250mg/kg total petroleum hydrocarbons; in the industrial areas 500mg/kg was proven acceptable. 3) Hydrocarbons in groundwater were remediated to below the Dutch Intervegtion Level of 0.6mg/1; 4) Volatile organic compounds/BTEX group substances were reduced to below the Dutch Intervention Levels; 5) Polycyclic aromatic hydrocarbons and metals were below Inter-departmental Committee for the Redevelopment of Contaminated Land guideline levels for intended enduse. In order to verify the qualify of the work 1500 chemical test results were submitted for the purpose of validation. Quality assurance checks were undertaken by independent consultants and at an independent laboratory selected by Intergeo. Long term monitoring of water quality was undertaken for a period of one year after remediation work had been completed. Both the regulatory authorities and Clients representatives endorsed the quality of remediation now completed at the site. Subsequent to completion of the remediation work Redrew Homes constructed a prestige housing development. The properties at "Belvedere Place" retailed at premium prices. On the MEPC site the Post Office, amongst others, has located a major sorting office for the London area. Exceptionally high standards of remediation, control and documentation were a requirement for the work undertaken here.aken here.

  • PDF

Optimization of Contaminated Land Investigation based on Different Fitness-for-Purpose Criteria (조사목적별 기준에 부합하는 오염부지 조사방법의 최적화 방안에 관한 연구)

  • Jong-Chun Lee;Michael H. Ramsey
    • Economic and Environmental Geology
    • /
    • v.36 no.3
    • /
    • pp.191-200
    • /
    • 2003
  • Investigations on the contaminated lands due to heavy metals from mining activities or hydrocarbons from oil spillage for example, should be planned based on specific fitness-for-purpose criteria(FFP criteria). A FFP criterion is site specific or varies with situation, based on which not only the data quality but also the decision quality can be determined. The limiting factors on the qualities can be, for example, the total budget for the investigation, regulatory guidance or expert's subjective fitness-for-purpose criterion. This paper deals with planning of investigation methods that can satisfy each suggested FFP criterion based on economic factors and the data quality. To this aim, a probabilistic loss function was applied to derive the cost effective investigation method that balances the measurement uncertainty, which estimates the degree of the data quality, with the decision quality. In addition, investigation planning methods when the objectives of investigations do not lie in the classification of the land but simply in producing the estimation of the mean concentration of the contaminant at the site(e.g. for the use in risk assessment), were also suggested. Furthermore, the efficient allocation of resources between sampling and analysis was also devised. These methods were applied to the two contaminated sites in the UK to test the validity of each method.

Study on the Geological Structure around KURT Using a Deep Borehole Investigation (장심도 시추공을 이용한 KURT 주변의 지질구조 연구)

  • Park, Kyung-Woo;Kim, Kyung-Su;Koh, Yong-Kwon;Choi, Jong-Won
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.8 no.4
    • /
    • pp.279-291
    • /
    • 2010
  • To characterize geological features in study area for high-level radioactive waste disposal research, KAERI (Korea Atomic Energy Research Institute) has been performing the several geological investigations such as geophysical surveys and borehole drilling since 1997. Especially, the KURT (KAERI Underground Research Tunnel) constructed to understand the deep geological environments in 2006. Recently, the deep borehole of 500 m depths was drilled to confirm and validate the geological model at the left research module of the KURT. The objective of this research was to identify the geological structures around KURT using the data obtained from the deep borehole investigation. To achieve the purpose, several geological investigations such as geophysical and borehole fracture surveys were carried out simultaneously. As a result, 7 fracture zones were identified in deep borehole located in the KURT. As one of important parts of site characterization on KURT area, the results will be used to revise the geological model of the study area.

On-site Conservation Treatment of the Beaker-shaped Pottery from Yori, Hyangnam, Hwaseong (화성 향남 요리 출토 심발형 토기 수습과 보존처리)

  • Kwon, Ohyoung;Ham, Chulhee;Lee, Sunmyoung
    • Journal of Conservation Science
    • /
    • v.36 no.6
    • /
    • pp.494-504
    • /
    • 2020
  • Ten historic sites (denoted as A- J in this study) of a tomb were found during the construction of the east-west expressway in District 2 of Hyangnam, Hwaseong, which is implemented by the Gyeonggi-do headquarters of the Korea Land & Housing Corporation. Thetombswere first detected at siteH, and further investigations revealed various tombs from the Three Kingdoms period; artifacts such as gilt-bronze shoes and caps were excavated from wooden coffins in the tombs. The pottery examined in this study was the only pottery artifact excavated from the site. Its raw clay was soft and loose, reddish brown, and had quartz and feldspar particles of < 1 mm, which appeared to have been added as reinforcing agents. The firing temperature of the pottery was estimated to be under 800-870 ℃ as the mica remains and tridimite, which is the phase transition mineral of quartz, was not produced; a slight endothermic peak was also detected because of the hydration of sericite at 800 ℃. The condition of the artifact was severely weakened because of various factors, such as soil pressure from the stratum formed over the site and repeated freezing and thawing. The artifact could not be collected alone, and thus, surrounding soil that had attached to the artifact was also collected; the artifact was transported to the laboratory and conservation treatment was conducted in a safe and systematic manner.

Development of an Index for the Risk Assessment of Walking Trail (탐방로 재난 위험성 평가를 위한 위험지수 개발)

  • Kwak, Jae Hwan;Kim, Hong Gyun;Kim, Youl;Kim, Man-Il;Lee, Moon Se
    • The Journal of Engineering Geology
    • /
    • v.28 no.3
    • /
    • pp.379-395
    • /
    • 2018
  • A walking trail environment can be divided into the upper part of the trail, the trail itself, and the lower part of the trail. In this study, based on field investigations, we developed a risk index for trails by considering human/societal factors that affect each of these three trail environments. A checklist was developed for field investigations, and checklist items were scored through relative importance analysis. The relative weights of items were analyzed using the AHP (Analytic Hierarchy Process) technique, revealing that the upper environment of a trail is twice as important as the rest of the environment. The importance and score of items belonging to each environment were determined. We define the risk index as the sum of the item scores. Weights were added using data from existing investigations including landslides risk rating and designated risk steep slopes. The risk index has a maximum value of 200, and the maximum and minimum calculated scores of 335 risk sections were 159 and 64.2, respectively. As a result of comparative analysis between field observations and risk index calculations, most sections at relatively low risk had risk values less than 100, and sections with high risks or that had been the site of accident yielded scores that exceeded 140.

Study of the Value of National Cultural Heritage in the Gaetaesa Temple Site, Nonsan and the Establishment of an Integrated Maintenance Plan (논산 개태사지의 국가문화재적 가치 및 종합정비방안 수립에 관한 연구)

  • Seo, Jung-young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.2
    • /
    • pp.76-87
    • /
    • 2019
  • This study aims to analyze the status of the Gaetaesa Temple Site in Nonsan and the value of national cultural heritage associated with it, to work towards gaining the acceptance criteria to become state-designated cultural property and to propose a plan for comprehensive maintenance, a plan for the promotion of the project and a plan for the management and operation. The Gaetaesa Temple Site in Nonsan has unprecedented advancements, and the condition of the remains are relatively good. It would be necessary to conduct digging/excavation surveys continuously in the future and ensure the dignity of the Gaetaesa Temple Site in Nonsan as a cultural asset. In addition, the Gaetaesa Temple Site has excellent historical and cultural values as treasure-class cultural heritage. Most temples had treasures taken out of them, so it is necessary to designate this site as a state-designated cultural property instead of a municipality-designated cultural heritage site, and to manage it systematically. Accordingly, this study investigated the history and historical facts about the Gaetaesa Temple Site in Nonsan through the analysis of literature, including old documents, old maps, related academic papers and books, and referred to the results of digging/excavation surveys, conducted up to six times since the first excavation survey conducted in 1986, in order to understand the status of the remains, ruins and the building sites excavated at the Gaetaesa Temple Site in Nonsan. In addition, this study analyzed the values of the Gaetaesa Temple Site in Nonsan, dividing them into the remains, relics and ruins, and set up the scope of the Gaetaesa Temple Site in Nonsan, the cultural property area (designated and protected areas) and the acceptance criteria for the construction work in the historical and cultural environment preservation area. This study proposed a plan for the comprehensive maintenance of the Gaetaesa Temple Site in Nonsan, a plan for the promotion of the project and a plan for the management and operation. It is necessary to carry out ongoing excavation investigations and to reflect the opinions of the residents for the purchase of land, to supplement the comprehensive maintenance plan, business promotion and management plans, and step-by-step business plans should be established in detail.

Earthquake Engineering Bedrock Based on the Shear Wave Velocities of Rock Strata in Korea (국내 암반지층의 전단파속도에 근거한 지진공학적 기반암 결정)

  • Sun, Chang-Guk
    • The Journal of Engineering Geology
    • /
    • v.24 no.2
    • /
    • pp.273-281
    • /
    • 2014
  • In most current seismic design codes, design earthquake ground motions are defined by a reference spectrum, based on bedrock and site amplification factors that quantify the geotechnical dynamic conditions. Earthquake engineering bedrock is the fundamental geotechnical formation where the seismic waves are attenuated without amplification. To better define bedrock in an earthquake engineering context, shear wave velocity ($V_S$ ) data obtained from in-situ seismic tests were examined for several rock strata in Korea; these data were categorized by borehole drilling investigations. The $V_S$ values for most soft rock data in Korea are > 750 m/s, which is the threshold $V_S$ value for identifying engineering bedrock from a strong motion station. Conversely, VS values are < 750 m/s for 60% of $V_S$ data in weathered rock in Korea. Thus, the soft (or harder) rock strata below the weathered rock layer in Korea can be regarded as earthquake engineering bedrock.

A Review of Industrially Developed Components and Operation Conditions for Anion Exchange Membrane Water Electrolysis

  • Lim, Ahyoun;Cho, Min Kyung;Lee, So Young;Kim, Hyoung-Juhn;Yoo, Sung Jong;Sung, Yung-Eun;Jang, Jong Hyun;Park, Hyun S.
    • Journal of Electrochemical Science and Technology
    • /
    • v.8 no.4
    • /
    • pp.265-273
    • /
    • 2017
  • Solid-state alkaline water electrolysis is a promising method for producing hydrogen using renewable energy sources such as wind and solar power. Despite active investigations of component development for anion exchange membrane water electrolysis (AEMWE), understanding of the device performance remains insufficient for the commercialization of AEMWE. The study of assembled AEMWE devices is essential to validate the activity and stability of developed catalysts and electrolyte membranes, as well as the dependence of the performance on the device operating conditions. Herein, we review the development of catalysts and membranes reported by different AEMWE companies such as ACTA S.p.A. and Proton OnSite and device operating conditions that significantly affect the AEMWE performance. For example, $CuCoO_x$ and $LiCoO_2$ have been studied as oxygen evolution catalysts by Acta S.p.A and Proton OnSite, respectively. Anion exchange membranes based on polyethylene and polysulfone are also investigated for use as electrolyte membranes in AEMWE devices. In addition, operation factors, including temperature, electrolyte concentration and acidity, and solution feed methods, are reviewed in terms of their influence on the AEMWE performance. The reaction rate of water splitting generally increases with increase in operating temperature because of the facilitated kinetics and higher ion conductivity. The effect of solution feeding configuration on the AEMWE performance is explained, with a brief discussion on current AEMWE performance and device durability.

Feasibility of Early Definitive Internal Fixation of Pelvic Bone Fractures in Therapeutic Open Abdomen

  • Choi, Kyunghak;Jung, Kwang-Hwan;Keum, Min Ae;Kim, Sungjeep;Kim, Jihoon T;Kyoung, Kyu-Hyouck
    • Journal of Trauma and Injury
    • /
    • v.33 no.1
    • /
    • pp.18-22
    • /
    • 2020
  • Purpose: Damage control laparotomy has contributed to improved survival rates for severe abdominal injuries. A large part of severe abdominal injury occurs with a concomitant pelvic bone fracture. The safety and effectiveness of internal fixation of pelvic bone fracture(s) has not been established. The aim of the present study was to evaluate infection risk in the pelvic surgical site in patients who underwent emergent abdominal surgery. Methods: This single-center retrospective observational study was based on data collected from a prospectively maintained registry between January 2015 and June 2019. Patients who underwent laparotomy and pelvic internal fixation were included. Individuals <18 and ≥80 years of age, those with no microbiological investigations, and those who underwent one-stage abdominal surgery were excluded. Comprehensive statistical comparative analysis was not performed due to the small number of enrolled patients. Results: A total of six patients met the inclusion criteria, and the most common injury mechanism was anterior-posterior compression (67%). The average duration of open abdomen was 98 hours (range, 44-98), and the time interval between abdominal closure and pelvic surgery was 98 hours. One patient (16.7%) died due to multi-organ dysfunction syndrome. Micro-organisms were identified in the abdominal surgical site in five patients (83%), with no micro-organisms in pelvic surgical sites. There was no unplanned implant removal. Conclusions: Internal fixation of pelvic bone fracture(s) could be performed in the state of open abdomen, and the advantages of early fixation may countervail the risks for cross contamination.

Effect on the Stabilizing Heat Treatment to Weld Joint for the USC Coal Boiler Tubes(SA213 TP347H) (초초임계 석탄발전 보일러 튜브(SA213 TP347H) 용접부 안정화 열처리 효과)

  • Ahn, Jong-Seok;Park, Jin-Keun;Lee, Gil-Jae;Yoon, Jae-Yeon
    • Journal of Welding and Joining
    • /
    • v.33 no.4
    • /
    • pp.30-36
    • /
    • 2015
  • Austenite stainless steel(SA213-TP347H) has widely been used for the superheater & reheater tube in USC(ultra-supercritica) coal boiler because of its high creep rupture strength and anti-oxidation. But recently, the short-term failures have happened frequently in heat affected zone for only 4,000~15,000hours of service. Many investigations have been conducted to understand the failure mechanism. The root cause of failure was comfirmed to "strain induce participation hardening crack" or "reheat cracking". This mechanism often occurred due to weld residual stress and precipitation of the Cr, Nb carbides in the stabilized stainless steel such as TP347H. This paper presents an analysis of failure tube and effect of the sample tubes that conducting stabilizing heat treatment in site after 11,380hours & 16,961hours of service. Visual inspection was performed. In addition, microscopic characteristics was identified by O.M, SEM, and hardness test was carried out to find out the heat treatment effects. Failures seem to happen because of being not conducted stabilizing heat treatment in site. And another cause is inadequate weld parameter such as pass, ampere, voltage, inter-pass temperature. Thus, this paper has the purpose to describe that how to prevent similar failures in those weld-joints.