Risk management applicable to shield TBM tunnel: II. Risk analysis methodology (쉴드 TBM 터널에 적용 가능한 리스크 관리: II. 리스크 분석 방법)

  • Hyun, Ki-Chang;Min, Sang-Yoon;Moon, Joon-Bai;Jeong, Gyeong-Hwan;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.683-697
    • /
    • 2012
  • In this paper, a risk analysis methodology applicable to shield TBM tunnels was studied. Fault Tree Analysis (FTA) was utilized to identify all risk items and to calculate the probability of failure of each item and Analytic Hierarchy Process (AHP) was used to obtain the impact of each risk item. Finally, a risk level of each risk item can be assessed. Developed methodology is applied to a Seoul subway site in which EPB shield tunnel method was utilized and it was found that risk analysis results matched reasonably well with field data.

A study on the selection of optimal cross section according to the ventilation system in TBM road tunnels (TBM 도로터널의 환기방식에 따른 최적단면 선정에 관한 연구)

  • Lee, Ho-Keun;Kang, Hyun-Wook;Kim, Hyun-Soo;Kim, Hong-Moon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.135-148
    • /
    • 2013
  • Recently, road tunnels have become longer and the plans for long and deep road tunnel have been underway in urban areas. These long and deep tunnel excavations include NATM and TBM. Shield TBM is applied to around 80% of traffic tunnels in Europe, and approximately 30% of them in other developed countries. However, as much of equipment is imported from foreign countries at high prices and distribution rate of TBM tunnel is considerably low in Korea, NATM excavation method is commonly used. To increase TBM tunnel, it is necessary to do assure economic feasibility with the supply-demand of TBM equipment. For this, the selection of standardized TBM diameter is urgently needed. Therefore, the study aims to estimate the standardized optimum section properties of TBM by examining TBM excavation cross section utilization depending on the volume of traffic, the number of lane and its cross-section type(single or double deck), and ventilation system.

A simplified combined analytical method for evaluating the effect of deep surface excavations on the shield metro tunnels

  • Liu, Bo;Yu, Zhiwei;Han, Yanhui;Wang, Zhiliu;Yang, Shuo;Liu, Heng
    • Geomechanics and Engineering
    • /
    • v.23 no.5
    • /
    • pp.405-418
    • /
    • 2020
  • Deep excavation may have impact on the adjacent tunnels. It is obvious that the excavation will adversely affect and even damage the existing tunnels if the induced deformation exceeds the capacity of tunnel structures. It hence creates a high necessity to predict tunnel displacement induced by nearby excavation to ensure the safety of tunnel. In this paper, a simplified method to evaluate the heave of the underlying tunnel induced by adjacent excavation is presented and verified by field measurement results. In the proposed model, the tunnel is represented by a series of short beams connected by tensile springs, compressional springs and shear springs, so that the rotational effect and shearing effect of the joints between lining rings can be captured. The proposed method is compared with the previous modelling methods (e.g., Euler-Bernoulli beam, a series of short beams connected only by shear springs) based on a field measured longitudinal deformation of subway tunnels. Results of these case studies show a reasonable agreement between the predictions and observations.

Performance comparison of machine learning classification methods for decision of disc cutter replacement of shield TBM (쉴드 TBM 디스크 커터 교체 유무 판단을 위한 머신러닝 분류기법 성능 비교)

  • Kim, Yunhee;Hong, Jiyeon;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.5
    • /
    • pp.575-589
    • /
    • 2020
  • In recent years, Shield TBM construction has been continuously increasing in domestic tunnels. The main excavation tool in the shield TBM construction is a disc cutter which naturally wears during the excavation process and significantly degrades the excavation efficiency. Therefore, it is important to know the appropriate time of the disc cutter replacement. In this study, it is proposed a predictive model that can determine yes/no of disc cutter replacement using machine learning algorithm. To do this, the shield TBM machine data which is highly correlated to the disc cutter wears and the disc cutter replacement from the shield TBM field which is already constructed are used as the input data in the model. Also, the algorithms used in the study were the support vector machine, k-nearest neighbor algorithm, and decision tree algorithm are all classification methods used in machine learning. In order to construct an optimal predictive model and to evaluate the performance of the model, the classification performance evaluation index was compared and analyzed.

Stability analysis of shield tunnel segment lining by field measurement and full scale bending test (실대형 하중재하 시험 및 현장계측을 통한 쉴드터널 세그먼트 안정성 분석)

  • Lee, Gyu-Phil;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.5
    • /
    • pp.611-620
    • /
    • 2019
  • The shield tunnel was mostly applied to cable tunnel with a diameter of 3~4 m, recently 7.8 m diameter shield tunnel was constructed in the lower section of the Incheon International Airport runway and is planning or under construction to roads and railway tunnels in the lower section of the Han River. Segments are also becoming larger as the shield tunnel cross-section increases, which causes a number of problems in the design, construction, and performance evaluation of segments. In this study, segment lining structural safety, criteria for serviceability check considering axial forces and quality control method for approximately 8 m in diameter shield tunnel were reviewed by field measurements and full scale bending test.

A study on the improvement of the protective shield construction method and explosion-proof tube performance for tunnel blasting (터널 발파에 대한 방호쉴드 공법 및 방폭튜브 성능 개선 연구)

  • Sang-Hwan Kim;Soo-Jin Lee;Jung-Nam Kwon;Dong-gyun Yoo;Yong-Woo Kim;Kwang-Eun Cho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.4
    • /
    • pp.285-303
    • /
    • 2023
  • Interest in building underground spaces is increasing for the creation of downtown infrastructure and efficient space utilization. A representative method of utilizing underground space is a tunnel, and in addition to road tunnels, the construction of utility tunnels such as power conduits and utility conduits is gradually increasing. The current basic tunnel construction method can be divided into NATM (New Austrian Tunnelling Method) and TBM (Tunnel Boring Machine). The NATM is a reliable method, but it is accompanied by vibration and noise due to blasting. In the case of the TBM excavation method, there are disadvantages in terms of construction period and construction cost, but it is possible to improve economic feasibility by introducing appropriate complementary methods. In this study, a blasting method was develop using the NATM after TBM pre-excavation using the protective shield method. This is a method that compensates for the disadvantages of each tunnel construction method, and is expected to reduce construction costs, blasting vibration, and noise. In order to review the performance of the developed method, an experiment was conducted to evaluate the performance of explosion-proof tube to which a protective shield scale model was applied, and the impact of blasting vibration of the protective shield method was analyzed.

The Behaviours of Existing Tunnels in response to Multiple side-by-side Tunnel Construction in Soft Ground (연약지반 다수의 터널 병렬시공 시 기존터널의 거동)

  • Ahn, Sung Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.6
    • /
    • pp.193-204
    • /
    • 2008
  • This paper describes laboratory experiments modelling multiple tunnel construction in soft ground. A series of small-scale model tests have been conducted at approximately 1/50 scale in order to investigate the behaviours of existing tunnels in response to the construction of new tunnels in close proximity. The model tunnels were constructed in a consolidated Speswhite Kaolin clay using a tunnelling device involving an auger type cutter within a shield. Strain gauges and LVDTs were used for instrumenting the existing tunnels. The findings obtained from the analyses of these tests were compared to the field measurements involving the reconstruction of the Northern Line London Underground Ltd. tunnels at Old street, United Kingdom. The results were also compared to the ground movement measurements obtained from a separate set of tests undertaken using the same apparatus and experimental procedures.

Fire-induced damage on Shield TBM concrete segment (터널 화재로 인한 콘크리트 세그먼트의 손상특성 규명)

  • Choi, Soon-Wook;Chang, Soo-Ho;Lee, Gyu-Phil;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.423-430
    • /
    • 2005
  • Fire accidents in underground space may bring much loss of lives as well as properties and result in catastrophic disasters. This study aimed to manufacture the high-temperature furnace capable of simulating fire scenarios (RABT and RWS) and carry out the preliminary fire tests to evaluate fire-induced damage in underground structures. Specimens used in the fire tests were the concrete segments generally used in shield TBM tunnels. The simulated fire scenario was set to the RABT curve that is the most representative fire scenario in underground space. From the fire tests, the spalling was estimated to reach approximately 20cm from the surface exposed to fire. In addition, from the observation of core specimens obtained after fire tests, the deteriorated zone of unspalled specimens amounted to approximately 10cm from the surface of spalling.

  • PDF

OPTMAL LICATION OF ACOUSTIC SENSORS AND OPTIMAL OBSERVATION POLICY FOR DETECTING ANIMALIUS PLANE OBJECY IN SHIELD CINSTRUCTION METHOD

  • Yamane, Kenji;Tanaka, Shogo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1995.10a
    • /
    • pp.240-243
    • /
    • 1995
  • In excavating tunnels, shield tunneling machines having many cutters on their cutter planes are used. Not many observation data being available in the detection system, optimal observation policy is very important. From this viewpoint, we previously considered the optimal location of acoustic sensors on the cutter plane and also the optimal observation policy for the case where three receiving transducers were used, and showed that the optimal sensor location was given as arbitrary equally-spaced points on the cutter plane circle, and that the optimal rotating angles were also found to be arbitrary. In application, however, it is often difficult to locate sensors at arbitrary positions or to use three sensors from the viewpoints of machine structure and cost. This paper considers the optimal observation policy for detecting anomlous plane objects for the case where two receiving transducers are used and the case where three receiving transducers are located only on a diameter of the cutter plane.

  • PDF

A Study on Backfill Injection of Shield Tunnelling (쉴드터널에서의 뒷채움주입에 관한 연구)

  • 민덕기;백진욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1995.10a
    • /
    • pp.201-210
    • /
    • 1995
  • In Resent years, urban tunnels have been more deeply constructed due to the congestion of buried steuctures. In such conditions, the shield method has become one of the popular urban tunnelling method by reason of several characteristics ; safety of construction, mimium environmental damage, and workbility. In tunnelling, the space which is tail-void are created between the ground and the other face of the primary lining. in other to reduce the ground seformation, it is important backfilling in tail-void. In this paper, the result of an experimental investigation undertaken to evaluate the physical and mechanical propeties of grouts composed of various mixtures of backfill materials. And the backfill injection model test was carried out considering the effects of tail-void.

  • PDF