Abstract
The shield tunnel was mostly applied to cable tunnel with a diameter of 3~4 m, recently 7.8 m diameter shield tunnel was constructed in the lower section of the Incheon International Airport runway and is planning or under construction to roads and railway tunnels in the lower section of the Han River. Segments are also becoming larger as the shield tunnel cross-section increases, which causes a number of problems in the design, construction, and performance evaluation of segments. In this study, segment lining structural safety, criteria for serviceability check considering axial forces and quality control method for approximately 8 m in diameter shield tunnel were reviewed by field measurements and full scale bending test.
쉴드터널은 직경 3~4 m 규모의 전력구 등에 주로 적용되었으나, 최근 직경 7~8 m 규모의 쉴드터널이 인천국제공항 활주로 하부에 시공되었으며, 한강 하저구간 도로 및 철도터널 시공완료 및 계획중에 있다. 쉴드터널 단면이 증가함에 따라 세그먼트 또한 대형화되고 있으며, 이로 인하여 세그먼트의 설계, 시공 및 성능평가 시 여러 문제점이 야기되고 있다. 따라서 본 연구에서는 직경 약 8 m 규모의 쉴드터널에 대한 현장계측 및 실대형 하중재하 시험을 통하여 쉴드터널 세그먼트 라이닝 구조적 안정성 분석, 축력을 고려한 세그먼트 사용성 검토방안의 적합성 및 품질관리 방안에 대하여 검토하였다.