• Title/Summary/Keyword: set construction

Search Result 1,985, Processing Time 0.024 seconds

A Study on Establishment of Construction CALS Standardization system (건설CALS 표준화 체계 정립에 관한 기초적 연구)

  • 이상호;김명원;김봉근;유인채
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.141-154
    • /
    • 2001
  • This paper presents a fundamental study to establish a standardization system of the Construction Continuous Acquisition and Life-cycle Support(CALS). States of standardization in the Construction CALS were reviewed to find some defects in developing CALS system in construction industry. It is analyzed that three of major parts were needed to put up a standardization system for the Construction CALS. Firstly, the range of Construction CALS standardization is set up by identifying of Construction CALS and defining the standard and standardization. Secondly, the strategy to enable more effective implementation of Construction CALS standardization and the relationship of the concerned system presented can be used for establishing the Construction CALS standardization system. In addition, the spread and application device is proposed for using Construction CALS standards at public institutions and construction related companies. Conclusively, a classification system of the Construction CALS standards was proposed and some objects to be standardized were presented in the classification system. What were studied in this paper will provide the primary information and guidance to develop a guideline for standardization of the Construction CALS.

  • PDF

The Lead-Lag Relationship between BSI and Industrial Production Index in Construction Industry (건설업 BSI와 산업생산지수 간의 선후행성)

  • Yoo, Han-Soo
    • Land and Housing Review
    • /
    • v.11 no.3
    • /
    • pp.33-37
    • /
    • 2020
  • The aim of this paper is to scrutinize the relation between Business Survey Index and Industrial Production Index in construction industry, stated in another way, the relation between CEO's expectations of future business status and real business activity in construction industry. Previous papers on this research area have been examined the relation between released BSI and released IPI. However, this paper focuses 'the relation between released BSI and the long-run component of IPI' and 'the relation between released BSI and the short-run component of IPI'. The first step is to decompose released IPI by unobserved component model. The long-run component of IPI is set up as a random walk process. And short-run component is set up as a stationary AR(1) process. The findings are as follows. First, released BSI Granger causes unidirectionally released IPI. Second, there exists one-way Granger causality from released BSI to long-run component of IPI. Third, Granger causality does not exist between released BSI and 'short-run component of IPI'. BSI increases IPI in the second or third month. These findings of this paper mean that CEO's expectations may influence industrial production in construction industry.

MITIGATION AND REMISSION OF CONTRACTOR'S DEFECTS LIABILITY IN KOREAN CONSTRUCTION CONTRACTS

  • Jong-Gwang Lee ;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.447-451
    • /
    • 2005
  • The purpose of this study is to improve regulations such as law and standard contract forms related to defects liability in Korea. Defects liability has been one of the major causes of construction contract disputes in Korea in recent years. It is important to avoid or resolve disputes regarding defects liability through regulations containing clear criteria and to specify the standard regarding the mitigation and remission of the contractor's defects liability. This study was carried out through document research and analysis of judicial precedents. The following are the courses of improvement regarding the mitigation and remission of defects liability in Korea. First, laws and standard contract forms must contain more detailed clauses regarding exemption of a contractor's defects liability, which clearly set out the scope of the defects liability of the contractor. Second, the current system for defects liability favors the owner rather than the contractor - it is necessary to change the defects liability system in order to give the owner and the contractor an equal standing. Third, strict liability is taken on by the contractor even when the term of guarantee for defects lasts longer than the legally set period of liability for defects. Hence, it is necessary to improve the system by alleviating the liability of the contractor through applying negligence liability as opposed to strict liability during the term of guarantee.

  • PDF

Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method (역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석)

  • Park, Yong-Hyeon;Ju, Young-Kyu
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

An Advanced User-Construction Requirement Within the EFD for the Development of Large-scale Information Systems

  • Park, Won-Seok;Park, Man-Gon
    • Journal of Korea Multimedia Society
    • /
    • v.6 no.4
    • /
    • pp.723-735
    • /
    • 2003
  • This research focuses ell an approach for the building of a requirements model for the development of large-scale information systems. It will suggest a set of requirements engineering processes as a procedure of the implementation for building the requirements model. It will also emphasise the evaluation requirements model aimed to refine and complete the requirements model by the different user groups as a cross reference. This paper provides an advanced user-construction requirements within the Event Flow Diagram as a set of requirements engineering process.

  • PDF

Planning for Reasonable Construction and Expanding of Distribution Substation By Load Forecasting (부하예측에 의한 합리적인 배전용 변전소 증설계획 수립)

  • Choi, Sang-Bong;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Bae, Jeong-Hyo;Ha, Tae-Hyun;Lee, Hyun-Goo;Kim, Ho-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.92-94
    • /
    • 2000
  • This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of substation bank system. In this paper, above all, proper sphere of supply area by each district which could be standardized with respect to its supply capacity is established under assumption of long term load forecasting which was made by district respectively, and then goal of utilization ratio based on configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents. Finally it is set up for optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio.

  • PDF

Stochastic Time-Cost Tradeoff Using Genetic Algorithm

  • Lee, Hyung-Guk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.114-116
    • /
    • 2015
  • This paper presents a Stochastic Time-Cost Tradeoff analysis system (STCT) that identifies optimal construction methods for activities, hence reducing the project completion time and cost simultaneously. It makes use of schedule information obtained from critical path method (CPM), applies alternative construction methods data obtained from estimators to respective activities, computes an optimal set of genetic algorithm (GA) parameters, executes simulation based GA experiments, and identifies near optimal solution(s). A test case verifies the usability of STCT.

  • PDF

On a Construction of Subobject Classifiers

  • Yi, Hyang-Il
    • Journal of the Chungcheong Mathematical Society
    • /
    • v.7 no.1
    • /
    • pp.13-23
    • /
    • 1994
  • In this paper, we consider the higher-order type theoretic language L and construct a type model D of complete partial ordered set. We show that the complete partial ordered set for the language L gives rise to a category and generates a topos.

  • PDF

A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

AN EPICYCLOIDAL BOUNDARY OF THE MAIN COMPONENT IN THE DEGREE-n BIFURCATION SET

  • Geum, Young-Hee;Kim, Young-Ik
    • Journal of applied mathematics & informatics
    • /
    • v.16 no.1_2
    • /
    • pp.221-229
    • /
    • 2004
  • It is known that the parametric boundary equation for the main component in the Mandelbrot set represents a cardioid. We derive an epicy-cloidal boundary equation of the main component in the degree-n bifurcation set by extending the parameter which describes the cardioid in the Mandelbrot set. Computational results as well as some useful properties are presented together with the programming source codes written in Mathematica. Various boundaries are displayed for $2\leqn\leq7$7 and show a good agreement with the theory presented here. The known boundary equation enables us to significantly reduce the construction time for the degree-n bifurcation set.