Kim, Hyun-Ah;Lee, Eun-Jung;Chun, Jun-Chul;Kim, Kwang-Hoon Pio
KSII Transactions on Internet and Information Systems (TIIS)
/
제5권11호
/
pp.2121-2142
/
2011
In this paper, we propose an e-Learning process control model that aims to graphically describe and automatically generate the manifest of sequencing prerequisites in packaging SCORM's content aggregation models. In specifying the e-Learning activity sequencing, SCORM provides the concept of sequencing prerequisites to be manifested on each e-Learning activity of the corresponding tree-structured content organization model. However, the course developer is required to completely understand the SCORM's complicated sequencing prerequisites and other extensions. So, it is necessary to achieve an efficient way of packaging for the e-Learning content organization models. The e-Learning process control model proposed in this paper ought to be an impeccable solution for this problem. Consequently, this paper aims to realize a new concept of process-driven e-Learning content aggregating approach supporting the e-Learning process control model and to implement its e-Learning process modeling system graphically describing and automatically generating the SCORM's sequencing prerequisites. Eventually, the proposed model becomes a theoretical basis for implementing a SCORM-based e-Learning process management system satisfying the SCORM's sequencing prerequisite specifications. We strongly believe that the e-Learning process control model and its modeling system achieve convenient packaging in SCORM's content organization models and in implementing an e-Learning management system as well.
A typical job sequencing problem is studied in this research to improve productivities in manufacturing companies. The problem consists of two-stage parts and assembly processes. Two parts are provided independently each other and then two sequential assembly processes are followed. A new heuristic is developed to solve the new type of sequencing problem. Initial solution is developed in the first stage and then the initial solution is improved in the second stage. In the first stage, a longer part manufacturing time for each job is selected between two, and then a sequence is determined by descending order of the times. This initial sequence is compared with Johnson's sequence obtained from 2-machine assembly times. Any mismatches are tried to switch as one possible alternative and completion time is calculated to determine whether to accept the new sequence or not to replace the current sequence. Searching process stops if no more improvement can be made.
In countries with FMD vaccination, as in Korea, typical clinical signs do not appear, and even in FMD positive cases, it is difficult to isolate the FMDV or obtain whole genome sequence. To overcome this problem, more rapid and simple NGS system is required to control FMD in Korea. FMDV (O/Boeun/ SKR/2017) RNA was extracted and sequenced using Ion Torrent's bench-top sequencer with amplicon panel with optimized bioinformatics pipelines. The whole genome sequencing of raw data generated data of 1,839,864 (mean read length 283 bp) reads comprising a total of 521,641,058 (≥Q20 475,327,721). Compared with FMDV (GenBank accession No. MG983730), the FMDV sequences in this study showed 99.83% nucleotide identity. Further study is needed to identify these differences. In this study, fast and robust methods for benchtop next generation sequencing (NGS) system was developed for analysis of Foot-and-mouth disease virus (FMDV) whole genome sequences.
Planning for the expansion of production capacity is of vital importance in many applications within the private and public sectors. This paper considers a sequencing expansion problem in which capacity can be added only at discrete points in time. Given the demand forecast of each period, capacity and cost of each expansion project, we are to determine the sequence of expansion necessary to provide sufficient capacity to meet the demand in all periods at minimum cost. This problem is formulated as a pure integer programming and solved by branch and bound method using Lagrangian relaxation. At first, simple sequencing expansion problem is presented, and in the latter part, extension to include precedence between projects is suggested.
In this paper, we address a single machine non-preemptive n-job scheduling problem to minimize the sum of earliness and tardiness with different release times and due dates. To solve the problem, we propose a genetic algorithm with new crossover and mutation operators to find the job sequencing. For the proposed genetic algorithm, the optimal pair of crossover and mutation rates is investigated. To illustrate the suitability of genetic algorithm, solutions of genetic algorithm are compared with solutions of exhaustive enumeration method in small size problems and tabu search method in large size problems. Computational results demonstrate that the proposed genetic algorithm provides the near-optimal job sequencing in the real world problem.
Scheduling problems which determine the sequence of jobs are one of the Important issues to many industries. This paper deals with a single-machine job sequencing problem which has complex constraints and an objective function. To solve the problem, an expressive constraint description language and an automatic code generator are developed for our scheduling system. The user just needs to describe the scheduling problem using the constraint description language that allows to express both quantitative and qualitative constraints as well as an objective function in real world semantics. Then, a complete scheduling program based on constraint satisfaction technique is automatically generated through the code generator. Advantage of this approach is that models of the scheduling problems are easily developed and maintained because models ore formulated by using the language which reflects real world semantics.
This paper presents possibilistic job scheduling based on the membership function as an alternative to probabilistic job scheduling and illustrates a methodology for solving job sequencing problem which the opinions of experts greatly disagree in each processing time. Triangular fuzzy numbers are used to represent the processing times of experts. Here, the comparison method is based on the dominance property. The criteria for dominance are presented. By the dominance criteria, for each job, a mojor TFN and a minor TFN are selected and apessimistic sequence with mojor TFNs and an optimistic sequence with minor TFNs are computed. The three-machine flow shop problem is considered as an example to illustrate the approach.
This paper analyzed md developed flow - shop sequencing heuristic method. The essence of the heuristic approach is in the application of selective routine that reduce the size of a problem. The advantages of this approach are consistency. Speed, endurance and the ability to cope with more data and larger systems than is humanly possible, In recent years many heuristic procedures have been suggested for the flow - shop sequencing problem. Although limited comparisons of these procedures have been made, a full scale test and evaluation have not been reported previously. The maximum flow - time criterion is selected as the evaluation criterion is selected as the evaluation criterion of flow - shop's efficiency. The author evaluated these 3 heuristic method's performance. By the evaluation of the result, we can see that the modified methods produce a shorter maximum flow - time than the original methods.
A more comprehensive analytical framework for examining the relative merits of alternative dispatching process policies for nurseries is developed in this paper. The efficiency of the dispatch process of plants in a nursery is analysed using a vehicle routing model. The problem then involves determining in what order each vehicle should visit its locations. The problem is NP-hard. Several heuristic techniques are used to solve a real life nursery sequencing problem. The results obtained by these heuristic techniques are compared with each other and the current sequencing of orders. The model with some minor alterations can be also used to minimise the dispatching and collecting process in different agricultural plants.
This paper considers the problem of sequencing printed circuit boards(PCBs) on an automatic surface mount device(SMD) placement machine in order to minimize total setup time. Since the total set of component feeders needed by all boards cannot be loaded simultaneously on the magazine, the setup must be made between two successive boards in the sequence. It is assumed that the setup time depends on the number of component feeders to be replaced in the magazine. An important characteristic is that each feeder occupies a different number of slots in the magazine. This problem is equivalent to travelling salesman problem(TSP) except that the distances between two cities, that is, the setup times between two boards, are not known in advance. So, TSP-based heuristics with new distance functions are presented and their performances are compared through various test problems. Computational results indicate that our heuristics outperform existing methods.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.