• Title/Summary/Keyword: scheduling management

Search Result 1,293, Processing Time 0.029 seconds

Economic Scheduling of Multiple Feedstock Biogas Production Systems on Two Identical Digesters (두 개의 동일한 소화조로 이루어진 메탄가스 생산체제의 경제적 운영에 관한 연구)

  • Gim, Bong-Jin
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.15 no.1
    • /
    • pp.37-46
    • /
    • 1990
  • Biomass to methane production is a good supply of substitutable energy resources. The economic viability of these systems depends a great deal on cost effective production methods and facilities. The operational problem is to determine the time eto allocate to each batch of several feedstocks for each digester and to determine the number of batches for each digester so as to maximize biogas production for two identical digesters over a fixed planning horizon. This paper provides an efficient approximation procedure which is based on decomposition of the problem and the analysis of incremental gas production function for each feedstock. The computational experience for the heuristic procedure was also reported.

  • PDF

Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok) (신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계)

  • Jung, Young-Soo;Kim, Woo-Joong;Ha, Ji-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.4
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.

An Extended DNC System for Factory Automation (공장자동화를 위한 확장 DNC 시스템)

  • 김영기;강무진;이재원
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.18 no.9
    • /
    • pp.2297-2311
    • /
    • 1994
  • This paper presents the study on the development of a DNC, system IPIS(Interactive Plant Information System)/DNC, which can manage NC machines and robots as a distributed control method in the machine. processing factory. The IPIS/DNC system is composed of a host computer, satellites and NC machines. A set of software modules are developed on the host computer and the satellites separately. By modularizing each functions of the IPIS/DNC system and using multi-taking method, the functions such as NC program management, NC program distribution, and shop monitoring can be performed on the host computer, and the functions such as NC program transfer to the NC machines, and NC program editing can be performed on the satellites. A Relational database which is linked with job scheduling system is used for IPIS/DNC system.

State-of-the-Art of DBR Scheduling Methodology (DBR 스케줄링 기법의 연구 동향)

  • Jang Seong Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.652-659
    • /
    • 2003
  • 이 논문은 TOC(Theoyv of Constraints) 기반의 DBR(Dyum-Buffey-Rope) 스케줄링 기법의 기본 개념을 소개하고. 이 기법이 저음 개발되어 오늘에 이르기까지 실제 생산기업에 적용되고 이론적으로 발전되어온 역사를 문헌을 중심으로 고찰하는 것이다. DBR 스케줄링 기법의 기본 개념 및 구조를 간단한 사례를 중심으로 설명하였으며. 1998년 처음 개발된 이후 발표된 논문을 중심으로 프로세스 산업적용, 반도체 산업 적용, DBR과 ERP 통합, MPS 문제, 버퍼 크기 문제, 공급망 관리와의 연계, VAT 분석, JIT와의 연계, 서비스 산업에의 적용. 일반 산업응용 사례, DBR 시스템 개발 등으로 나누어 문한 분석을 한 결과를 제시하였다. 마지막으로 향후 DBR 기법의 발전 방향 등에 대하여 논의하였다.

  • PDF

Agent-based Collaborative Simulation Architecture for Distributed Manufacturing Systems (분산 생산 시스템을 위한 에이전트 기반의 협업 시뮬레이션 체계)

  • Cha Yeong Pil;Jeong Mu Yeong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.808-813
    • /
    • 2003
  • Maintaining agility and responsiveness m designing and manufacturing activities are the key issues for manufacturing companies to cope with global competition. Distributed design and control systems are regarded as an efficient solution for agility and responsiveness. However, distributed nature of a manufacturing system complicates production activities such as design, simulation, scheduling, and execution control. Especially, existing simulation systems have limited external integration capabilities, which make it difficult to implement complex control mechanisms for the distributed manufacturing systems. Moreover, integration and coupling of heterogeneous components and models are commonly required for the simulation of complex distributed systems. In this paper, a collaborative and adaptive simulation architecture is proposed as an open framework for simulation and analysis of the distributed manufacturing enterprises. By incorporating agents with their distributed characteristics of autonomy, intelligence, and goal-driven behavior, the proposed agent-based simulation architecture can be easily adapted to support the agile and distributed manufacturing systems. The architecture supports the coordination and cooperation relations, and provides a communication middleware among the participants in simulation.

  • PDF

Joint Optimal Production-Delivery Policy for Multiple Products with a Single Production Facility

  • Kim Taebok;Hong Yushin
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.537-541
    • /
    • 2003
  • The synchronization of production-delivery artivities is one of crucial factors to get competitive collaboration benefits between the manufacturer and the retailor(s). There were several researches to study on He optimal delivery policy to minimize the total cost of integrated system of both manufacturer and retailor(s). In this research, we investigate the joint optimal shipment policy in case that a manufacturer produces multiple products sharing a single production facility in the manufacturer side and retailor(s) deploys JIT delivery pattern with equal-size shipment policy. We formulate this problem as a form of 'Common Cycle Approach' in classical ELSP (Economic Lot Scheduling Problem) and provide simple optimal solution procedure.

  • PDF

A Quay Crane Scheduling Method Considering Congestions in the Yard of Container Terminals (컨테이너 터미널에서 장치장 현황정보를 고려한 안벽크레인 일정계획 방법)

  • Jeong Da-Hun;Park Yeong-Man;Lee Byeong-Gwon;Ryu Gwang-Ryeol;Kim Gap-Hwan
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1178-1185
    • /
    • 2006
  • 컨테이너 터미널에서의 생산성은 본선작업의 효율성과 밀접한 관련이 있다. 효율적인 본선작업을 위한 첫 번째 단계는 선석에서 컨테이너를 취급하는 장비인 안벽크레인(Quay Crane : QC)에 대하여 효율적인 작업일정계획을 수립하는 것이다. 일반적으로 안벽크레인의 작업일정계획은 선박내의 장치계획에 관한 정보와 장치장의 장치현황정보등 많은 정보를 활용해야 하며, 선박의 안정성과 크레인의 작업용이성 등 다양한 제약사항을 고려하여야 한다. 따라서 본 연구에서는 인공지능기법 중 최적에 가까운 해를 찾아주는 탐색기법인 GRASP(Greedy Randomized Adaptive Search Procedure)를 적용하여 실제 현장에서 적용 가능한 안벽크레인 작업일정계획기법을 제안하였다. 또한, 컨테이너 터미널의 실제 자료를 수집하여 제안된 메타휴리스틱 알고리즘의 성능을 분석하였다.

  • PDF

Incompatible Batch Scheduling with Setup Time (공정 교체 시간을 고려한 배치작업의 일정관리)

  • 김주일;이영훈
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.103-106
    • /
    • 2000
  • 본 논문은 작업이 공정시간 등의 특성으로 인해 Family 로 구분되어지고 동일한 Family 내의 작업끼리만 배치로 구성할 수 있는 제조환경에서의 스케줄링에 관한 연구이다. 이때 배치의 최대크기는 정해져 있어 그 이하의 수로 구성된 작업들로 하나의 배치를 구성할 수 있다. 동일 Family 내의 작업은 작업시간이 동일하고 배치로 구성된 작업이 진행될 때 수에 관계없이 하나의 작업에 소요되는 시간과 동일한 시간이 소요된다. 또한 다른 Family 와의 작업이 이어질 때는 교제시간이 발생한다. 목적함수는 전체지연 시간을 최소화하는 것이며 납기는 동일한 Family 에 있는 작업일지라도 각 작업별로 주어진다. 이 목적함수의 최적해를 구할 수 있는 동적계획법을 제시하고 이를 응용한 발견적 기법을 개발, 적용하여 각각 성능비교를 실시하였다.

  • PDF

Scheduling and Determination of Feasible Process Times for CVD Cluster Tools with a Dual End Effector (두 팔을 가진 화학 박막 증착용 클러스터 장비의 스케줄링과 공정 시간 결정)

  • 이환용;이태억
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.107-110
    • /
    • 2000
  • 화학 박막 증착용(CVD : Chemical Vapor Deposition) 클러스터 장비는 다양한 공정 경로가 가능하며 물류 흐름이 매우 복잡해질 수 있다. 또한, 공정이 종료된 웨이퍼는 제한 시간 내에 챔버에서 꺼내져야만 한다. 클러스터 장비는 두 개의 팔을 가진 로봇이며, 빈 쪽 팔을 이용하여 공정이 종료된 웨이퍼를 꺼낸 후, 다른 쪽 팔을 이용하여 이전 공정에서 가져온 웨이퍼를 해당 공정에 넣어 주는 스왑(SWAP) 방식으로 운영된다. 이러한 스왑 방식에서는 로봇 작업 순서가 결정되어 진다. 그러나, 로봇의 팔 이외에 임시버퍼가 없고, 각 챔버는 엄격한 체제 시간 제약(Residency Time Constraint)을 가지고 있기 때문에 로봇의 작업 시점의 제어가 필요하다. 본 논문에서는 간단한 Earliest Starting 방식으로 로봇의 작업 시점을 제어한다고 가정했을 때, 스왑 방식을 운용하면서 체제 시간 제약을 만족하는 공정 시간들의 조건을 제시한다. 공정 시간은 엔지니어에 의해 다소 조정이 가능하므로 공정 시간들의 조건은 엔지니어에게 스케줄 가능한 공정 시간을 결정할 수 있도록 지원해 주는 시스템에 활용 가능하다. 또한, 본 논문에서는 FSM(Finite State Machine)을 이용하여 CTC(Cluster Tool Controller) 내부의 실시간 스케줄러 구현 방법을 제안한다.

  • PDF

Procedures of Transform IDEF3 Model into CPM Precedence Network Model for Process Analysis (프로세스 분석을 위한 IDEF3 모델을 CPM Network 모델로 변환하기 위한 절차)

  • 강동진;김경표;이상용;정용식
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1999.05a
    • /
    • pp.135-144
    • /
    • 1999
  • A major concern in Concurrent Engineering is the control and management of workload in a period of process. As a general rule, leveling the peak of workload in a certain period is difficult because concurrent processing is comprised of various processes, including overlapping, paralleling and looping. Therefore, workload management with resource constraints is so beneficial that effective methods to analyze design process This study presents a procedure to transform the IDEF3 process model into the precedence logic network model for more useful assessment of the process. This approach is expected to facilitate resolving resource constrained scheduling problems more systematically in Concurrent Engineering environment.

  • PDF