• Title/Summary/Keyword: scheduling management

Search Result 1,293, Processing Time 0.03 seconds

A Study on the Distribution of Overload in Academic Affairs Management System Using Replication Server (데이터 복제 서버를 이용한 학사 관리 시스템의 부하 분산에 관한 연구)

  • Han, Gwang-Rok;Lee, Seung-Won
    • The KIPS Transactions:PartD
    • /
    • v.8D no.5
    • /
    • pp.605-612
    • /
    • 2001
  • In order to solve the overload of academic affairs management system, we propose a method builds a distributed Replication server and uses this server with the present centralized system. Normal query transactions which are not required for data modification are composed of almost all DML sentences. So we construct the distributed replication servers according to the data characteristics and make them perform the query transaction without modification. In this way, we can simultaneously distribute users and data, and cut down processing time for every transaction. Also Replication server has the advantages of implemental efficiency and economical because it uses resources of present centralized system without and additional configurations. Usually, to distribute the overload of server, they can use way, Client-side overload distribution that user program get present overload status then can choose a less overloaded server, and the other way, Server-side overload distribution that make use of Application Layer Scheduling Technique and IP Layer Scheduling Technique. Our Replication server can reduce the overload of centralized system by eliminating or complementing those defects of overload distribution, referred to in the forehead.

  • PDF

An Adaptive Delay Control based on the Transmission Urgency of the Packets in the Wireless Networks (무선망에서 패킷의 전송 긴급성을 고려한 적응적 지연 제어 방안)

  • Jeong, Dae-In
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.1A
    • /
    • pp.44-53
    • /
    • 2010
  • This paper proposes a traffic management policy for delay control in the wireless networks. The so-called EDD(Earliest Due Date) scheme is adopted as the packet scheduling policy, so that the service provision is performed in the order of the transmission urgency of the backlogged packets. In addition, we derive a formula to determine the contention window, one of the MAC parameters, with the goal of minimizing the non-work conserving characteristics of the traditional MAC scheme. This method eliminates the burden of the class-wise parameter settings which is typically required for the priority control. Simulations are performed to show the validity of the proposed scheme in comparison with the policy that adopts the class-level queue management such as the IEEE 802.11e standard. Smaller delays and higher rates of delay guarantees are observed throughout the experiments.

A Patching-Based VOD System supporting VCR Operations (VCR 동작을 지원하는 패칭 기반의 주문형 비디오 시스템)

  • 조창식;마평수;이기호;강지훈
    • Journal of KIISE:Information Networking
    • /
    • v.30 no.1
    • /
    • pp.9-16
    • /
    • 2003
  • In this paper, we propose a method for supporting VCR operations in a patching based multicast VOD system. Random access, pause and resume operations are supported in our system, and the channel and session scheduling algorithms for the VCR operations are proposed. When it is necessary to join a sharable multicast channel in the admission control for the VCR operations, the patching technique, which shares an on-going regular channel and allocates a new patching channel for the missing data, is used. Therefore, unlike the previous approach that allocates an excessive number of I-channels, service latency is minimized and channel usage is optimized in our system. Moreover buffered data. which is saved in disk during patching, is reused to prevent unnecessary patching channel allocation. For this. the patching management information is extended and a buffed data management scheme is proposed. In our system, the First-Come-First-Served scheduling is used to inform clients the service latency for the VCR operations immediately.

Fuzzy LP Based Power Network Peak Shaving Algorithm (퍼지 LP 기반 전력망 Peak Shaving 알고리즘)

  • Ohn, Sungmin;Kim, Jung-Su;Song, Hwachang;Chang, Byunghoon
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.22 no.6
    • /
    • pp.754-760
    • /
    • 2012
  • This paper describes peak shaving algorithms as long-term cycle scheduling in the power management system (PMS) for MW-scale battery energy storage systems (BESS). The purpose of PMS is basically to manage the input and output power from battery modules placed in the systems. Assuming that an one-day ahead load curve is provided, off-line peak shaving algorithms can be employed, but applying the results of the off-line algorithm may result in the difference in the real-time performance because there is uncertainty in the provided load curve. This paper adopts fuzzy based LP (linear programming) algorithms for describing the peak shaving algorithm in PMS and discusses a solution technique and real-time operation strategies using the solution.

Scheduling Model for Centralized Unequal Chain Clustering (중앙 집중식 불균등 체인 클러스터링을 위한 스케줄링 모델)

  • Ji, Hyunho;Baniata, Mohammad;Hong, Jiman
    • Smart Media Journal
    • /
    • v.8 no.1
    • /
    • pp.43-50
    • /
    • 2019
  • As numerous devices are connected through a wireless network, there exist many studies conducted to efficiently connect the devices. While earlier studies often use clustering for efficient device management, there is a load-intensive cluster node which may lead the entire network to be unstable. In order to solve this problem, we propose a scheduling model for centralized unequal chain clustering for efficient management of sensor nodes. For the cluster configuration, this study is based on the cluster head range and the distance to the base station(BS). The main vector projection technique is used to construct clustering with concentricity where the positions of the base stations are not the same. We utilize a multiple radio access interface, multiple-input multiple-output (MIMO), for data transmission. Experiments show that cluster head energy consumption is reduced and network lifetime is improved.

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System (소형조선소 맞춤형 생산공정 계획관리 시스템 개발 및 적용에 관한 연구)

  • Kim, Young-Hun;Hong, Min-Jong;Baek, Seung-Ju;Lee, Won-Seok;Jo, Yong-Hwa;Lee, Dae-Hyung;Lee, Hoon-Sick;Na, Sung-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.1
    • /
    • pp.79-86
    • /
    • 2022
  • In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.

Inter-Cell Interference Management for Next-Generation Wireless Communication Systems

  • Kwon, Ho-Joong;Ko, Soo-Min;Seo, Han-Byul;Lee, Byeong-Gi
    • Journal of Communications and Networks
    • /
    • v.10 no.3
    • /
    • pp.258-267
    • /
    • 2008
  • In this paper, we examine what changes the next-generation wireless communication systems will experience in terms of the technologies, services, and networks and, based on that, we investigate how the inter-cell interference management should evolve in various aspects. We identify that the main driving forces of the future changes involve the data-centric services, new dynamic service scenarios, all-IP core access networks, new physical-layer technologies, and heavy upload traffic. We establish that in order to cope with the changes, the next-generation inter-cell interference management should evolve to 1) set the objective of providing a maximal data rate, 2) take the form of joint management of power allocation and user scheduling, 3) operate in a fully distributed manner, 4) handle the time-varying channel conditions in mobile environment, 5) deal with the changes in interference mechanism triggered by the new physical-layer technologies, and 6) increase the spectral efficiency while avoiding centralized coordination of resource allocation of the users in the uplink channel.

Development Security agents for Integrated security management of the Educational Network (교육망의 통합보안관리를 위한 보안 에이전트 개발)

  • Lee, Do Hyeon;Kim, Hyun Cheol;Kim, Jeom Goo
    • Convergence Security Journal
    • /
    • v.15 no.2
    • /
    • pp.43-55
    • /
    • 2015
  • Security infrastructure of Educational Network responds to threats by collecting and analyzing security events from various information protection system based on the integrated management system. Even if this system provides useful and detailed information to the administrator, there are some problems that this system does not provide effective response process and management systems for various threatening situations and the simultaneous threat processes. To solve this problem, we propose and develop security agents that enable the administrator to effectively manage integrated security for Educational Network. The proposed solution provides the administrator with efficient management techniques and process scheduling for various security events so that the administrator can response promptly to problems with the initial threat to Educational Network.

Case Study on Location Tracking System using RFID Active Tag and Improvement of Scheduling System in Semiconductor Manufacturing (반도체 제조업에서의 RFID Active 태그를 이용한 위치추적 시스템 구축 사례 및 스케줄링 개선 방안에 관한 연구)

  • Kim, Gahm-Yong;Chae, Myoung-Sin;Yu, Jae-Eon
    • IE interfaces
    • /
    • v.21 no.2
    • /
    • pp.229-236
    • /
    • 2008
  • Recently, ubiquitous computing paradigm considers as a tool for making innovation and competitive strength in manufacturing industry like other industries. Particularly, the location-based service that enables us to trace real-time logistics make effective management of schedules for inventory control, facilities and equipments, jobs planning, and facilitate the processes of information management and intelligence, which relate with ERP and SCM in organizations. Our study tries to build the location-based system for products of semiconductors in manufacturing place and suggests the good conditions and effective tracking procedures for positions of products. Our study show that the system is good for the saving of time in tracking products, however, it has to be improved in terms of accuracy. The study verifies the application of RFID technology in manufacturing industry and suggests the improvement of photograph process through RFID. In addition, our research introduces the future operation of FAB in semiconductors' processes that relate with real-time automation and RFID in manufacturing company.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.