• Title/Summary/Keyword: scheduling management

Search Result 1,280, Processing Time 0.025 seconds

Developing a short standard questionnaire for assessing work organization hazards: the Healthy Work Survey (HWS)

  • BongKyoo Choi;Youngju Seo
    • Annals of Occupational and Environmental Medicine
    • /
    • v.35
    • /
    • pp.7.1-7.14
    • /
    • 2023
  • Background: At present, no short standard questionnaire exists for assessing and comparing major work organization hazards in the workplaces of the United States. Methods: We conducted a series of psychometric tests (content validity, factor analysis, differential-item functioning analysis, reliability, and concurrent validity) to validate and identify core items and scales for major work organization hazards using the data from the 2002-2014 General Social Surveys (GSSs), including the Quality of Worklife (QWL) questionnaire. In addition, an extensive literature review was undertaken to find other major work organization hazards which were not addressed in the GSS. Results: Although the overall validity of the GSS-QWL questionnaire was satisfactory in the psychometric tests, some GSS-QWL items of work-family conflict, psychological job demands, job insecurity, use of skills on the job, and safety climate scales appeared to be weak. In the end, 33 questions (31 GSS-QWL and 2 GSS) were chosen as the least, but best validated core questions and included in a new short standard questionnaire (called the Healthy Work Survey [HWS]). And their national norms were established for comparisons. Furthermore, based on the literature review, fifteen more questions for assessing other significant work organization hazards (e.g., lack of scheduling control, emotional demands, electronic surveillance, wage theft) were included in the new questionnaire. Thus, the HWS includes 48 questions in total for assessing traditional and emerging work organization hazards, which covers seven theoretical domains: work schedule/arrangement, control, support, reward, demands, safety, and justice. Conclusions: The HWS is a short standard questionnaire for assessing work organization hazards which can be used as a first step toward the risk management of major work organization hazards in the workplaces of the US.

A Study on the Legal Proposal of Crew's Fatigue Management in the Aviation Regulations (항공법규에서의 승무원 피로관리기준 도입방안에 관한 연구 - ICAO, FAA, EASA 기준을 중심으로 -)

  • Lee, Koo-Hee;Hwang, Ho-Won
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.27 no.1
    • /
    • pp.29-73
    • /
    • 2012
  • Aviation safety is the State and industry's top priority and more scientific approaches for fatigue management should be needed. There are lately various studies and regulation changes for crew fatigue management with ICAO, FAA and EASA. ICAO issued the provisions of fatigue management for flight crew since 1st edition, 1969, of Annex 6 operation of aircraft as a Standards and Recommended practice(SARPs). Unfortunately, there have been few changes and improvement to fatigue management provisions since the time they were first introduced. However the SARPs have been big changed lately. ICAO published guidance materials for development of prescriptive fatigue regulations through amendment 33A of Annex 6 Part 1 as applicable November 19th 2009. And then ICAO introduced additional amendment for using Fatigue Risk Management System (FRMS) with $35^{th}$ amendment in 2011. According to the Annex 6, the State of the operator shall establish a) regulations for flight time, flight duty period, duty period and rest period limitations and b) FRMS regulations. The Operator shall implement one of following 3 provisions a) flight time, flight duty period, duty period and rest period limitations within the prescriptive fatigue management regulations established by the State of the Operator; or b) a FRMS; or c) a combination of a) and b). U.S. FAA recently published several kinds of Advisory Circular about flightcrew fatigue. U.S. passed "Airline Safety and FAA Extension Act of 2010" into law on August 1st, 2010. This mandates all commercial air carriers to develop a FAA-acceptable Fatigue Risk Management Plan(FRMP) by October 31st, 2010. Also, on May 16, 2012, the FAA published a final rule(correction) entitled 'Flightcrew Member Duty and Rest Requirements; correction to amend its existing prescriptive regulations. The new requirements are required to implement same regulations for domestic, flag and supplemental operations from January 4, 2014. EASA introduced a Notice of Proposed Amendment (NPA) 2010-14 entitled "Draft opinion of the European Aviation Safety Agency for a Commission Regulation establishing the implementing rules on Flight and Duty Time Limitations and Rest Requirements for Commercial Air Transport with aeroplanes" on December 10, 2010. The purpose of this NPA is to develop and implement fatigue management for commercial air transport operations. Comparing with Korean and foreign regulations regarding fatigue management, the provisions of ICAO, FAA, EASA are more considering various fatigue factors and conditions. Korea regulations should be needed for some development of insufficiency points. In this thesis, I present the results of the comparative study between domestic and foreign regulations in respect of fatigue management crew member. Also, I suggest legal proposals for amendment of Korea Aviation act and Enforcement Regulations concerning fatigue management for crew members. I hope that this paper is helpful to change korea fatigue regulations, to enhance aviation safety, and to reduce the number of accidents relating to fatigue. Fatigue should be managed at all level such as regulators, experts, operators and pilots. Authority should change surveillance mind-set from regulatory auditor to expert adviser. Operators should identify various fatigue factors and consider to crew scheduling them. Crews should strongly manage both individual and duty-oriented fatigue issues.

  • PDF

Two-phases Hybrid Approaches and Partitioning Strategy to Solve Dynamic Commercial Fleet Management Problem Using Real-time Information (실시간 정보기반 동적 화물차량 운용문제의 2단계 하이브리드 해법과 Partitioning Strategy)

  • Kim, Yong-Jin
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.2 s.73
    • /
    • pp.145-154
    • /
    • 2004
  • The growing demand for customer-responsive, made-to-order manufacturing is stimulating the need for improved dynamic decision-making processes in commercial fleet operations. Moreover, the rapid growth of electronic commerce through the internet is also requiring advanced and precise real-time operation of vehicle fleets. Accompanying these demand side developments/pressures, the growing availability of technologies such as AVL(Automatic Vehicle Location) systems and continuous two-way communication devices is driving developments on the supply side. These technologies enable the dispatcher to identify the current location of trucks and to communicate with drivers in real time affording the carrier fleet dispatcher the opportunity to dynamically respond to changes in demand, driver and vehicle availability, as well as traffic network conditions. This research investigates key aspects of real time dynamic routing and scheduling problems in fleet operation particularly in a truckload pickup-and-delivery problem under various settings, in which information of stochastic demands is revealed on a continuous basis, i.e., as the scheduled routes are executed. The most promising solution strategies for dealing with this real-time problem are analyzed and integrated. Furthermore, this research develops. analyzes, and implements hybrid algorithms for solving them, which combine fast local heuristic approach with an optimization-based approach. In addition, various partitioning algorithms being able to deal with large fleet of vehicles are developed based on 'divided & conquer' technique. Simulation experiments are developed and conducted to evaluate the performance of these algorithms.

Outage Probability and Throughput Management Using CoMP under the Coexistence of PS-LTE and LTE-R Networks (안전망과 철도망 공존환경에서 협력통신을 이용한 아웃티지 및 수율 관리)

  • Lim, WonHo;Jeong, HyoungChan;Ahmad, Ishtiaq;Chang, KyungHi
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.6
    • /
    • pp.595-603
    • /
    • 2016
  • In the Republic of Korea, the LTE-based public safety (PS-LTE) network is being built for the 700 MHz frequency band. However, the same bands are also assigned to the LTE-based high-speed railway (LTE-R) network. Therefore, it is essential to utilize the co-channel interference management schemes for the coexistence of two LTE networks in order to increase the system throughput and to reduce the user outage probability. In this paper, we focus on the downlink (DL) system for the coexistence of PS-LTE and LTE-R networks by considering non radio access network (RAN) sharing and LTE-R RAN sharing by PS-LTE users (UEs) to analyze the UE throughput. Moreover, we also utilize the cooperative communications schemes, such as coordinated multipoint (CoMP) for the coexistence of PS-LTE and LTE-R networks in order to reduce the UE outage probability. We categorize the coexistence of PS-LTE and LTE-R networks into four different scenarios, and evaluate the performance of each scenario by the important performance indexes, such as UE average throughput and UE outage probability.

An Analysis of Optimal Operation Strategy of ESS to Minimize Electricity Charge Using Octave (Octave를 이용한 전기 요금 최소화를 위한 ESS 운전 전략 최적화 방법에 대한 분석)

  • Gong, Eun Kyoung;Sohn, Jin-Man
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.85-92
    • /
    • 2018
  • Reductions of the electricity charge are achieved by demand management of the load. The demand management method of the load using ESS involves peak shifting, which shifts from a high demand time to low demand time. By shifting the load, the peak load can be lowered and the energy charge can be saved. Electricity charges consist of the energy charge and the basic charge per contracted capacity. The energy charge and peak load are minimized by Linear Programming (LP) and Quadratic Programming (QP), respectively. On the other hand, each optimization method has its advantages and disadvantages. First, the LP cannot separate the efficiency of the ESS. To solve these problems, the charge and discharge efficiency of the ESS was separated by Mixed Integer Linear Programming (MILP). Nevertheless, both methods have the disadvantages that they must assume the reduction ratio of peak load. Therefore, QP was used to solve this problem. The next step was to optimize the formula combination of QP and LP to minimize the electricity charge. On the other hand, these two methods have disadvantages in that the charge and discharge efficiency of the ESS cannot be separated. This paper proposes an optimization method according to the situation by analyzing quantitatively the advantages and disadvantages of each optimization method.

A Comparative Analysis on Generated Construction Waste Quantities in a Case Study for Deconstruction of an Apartment (공동주택의 분별해체 시험시공을 통한 건설폐기물 발생량 비교 분석)

  • Kim, Hyojin;Kang, Leenseok;Kim, Changhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.63-70
    • /
    • 2014
  • Deconstruction of the building must be applied firstly in order to improve recycling and reuse of construction wastes. In this study have done a case study for deconstruction of an apartment. All construction waste(CW) which will be generated during deconstruction was examined in each part of the building. Because drawing did not exist in most of the old building, we drew up floor plans of buildings. After analyzing these drawings, estimated quantities of CW. It was measured working time of labor and equipments for deconstruction and general demolition on each building of the apartment. In addition, it was proposed in the volume and weight per unit after analyzing detailed measurement of CW which was generated in the process of deconstruction and traditional demolition. It suggested recovery rate at a site, volume and weight conversion factors, and waste basic unit per area that based on the results of comparative analysis on the amount of CW which is calculated from drawing and generated at a site. These factors will be used fundamental materials for estimating quantities and treatment cost of CW, and scheduling of works.

A LSTM Based Method for Photovoltaic Power Prediction in Peak Times Without Future Meteorological Information (미래 기상정보를 사용하지 않는 LSTM 기반의 피크시간 태양광 발전량 예측 기법)

  • Lee, Donghun;Kim, Kwanho
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.4
    • /
    • pp.119-133
    • /
    • 2019
  • Recently, the importance prediction of photovoltaic power (PV) is considered as an essential function for scheduling adjustments, deciding on storage size, and overall planning for stable operation of PV facility systems. In particular, since most of PV power is generated in peak time, PV power prediction in a peak time is required for the PV system operators that enable to maximize revenue and sustainable electricity quantity. Moreover, Prediction of the PV power output in peak time without meteorological information such as solar radiation, cloudiness, the temperature is considered a challenging problem because it has limitations that the PV power was predicted by using predicted uncertain meteorological information in a wide range of areas in previous studies. Therefore, this paper proposes the LSTM (Long-Short Term Memory) based the PV power prediction model only using the meteorological, seasonal, and the before the obtained PV power before peak time. In this paper, the experiment results based on the proposed model using the real-world data shows the superior performance, which showed a positive impact on improving the PV power in a peak time forecast performance targeted in this study.

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

Design of Experiment and Analysis Method for the Integrated Logistics System Using Orthogonal Array (직교배열을 이용한 통합물류시스템의 실험 설계 및 분석방법)

  • Park, Youl-Kee;Um, In-Sup;Lee, Hong-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.12
    • /
    • pp.5622-5632
    • /
    • 2011
  • This paper presents the simulation design and analysis of Integrated Logistics System(ILS) which is operated by using the AGV(Automated Guided Vehicle). To maximize the operation performances of ILS with AGV, many parameters should be considered such as the number, velocity, and dispatching rule of AGV, part types, scheduling, and buffer sizes. We established the design of experiment in a way of Orthogonal Array in order to consider (1)maximizing the throughput; (2)maximizing the vehicle utilization; (3)minimizing the congestion; and (4)maximizing the Automated Storage and Retrieval System(AS/RS) utilization among various critical factors. Furthermore, we performed the optimization by using the simulation-based analysis and Evolution Strategy(ES). As a result, Orthogonal Array which is conducted far fewer than ES significantly saved not only the time but the same outcome when compared after validation test on the result from the two methods. Therefore, this approach ensures the confidence and provides better process for quick analysis by specifying exact experiment outcome even though it provides small number of experiment.

Design of an Efficient Control System for Harbor Terminal based on the Commercial Network (상용망 기반의 항만터미널 효율적인 관제시스템 설계)

  • Kim, Yong-Ho;Ju, YoungKwan;Mun, Hyung-Jin
    • Journal of Industrial Convergence
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2018
  • The Seaborne Trade Volume accounts for 97% of the total. This means that the port operation management system can improve port efficiency, reducing operating costs, and the manager who manages all operations at the port needs to check and respond quickly when delays of work and equipment support is needed. Based on the real-time location information confirmation of yard automation equipment used the existing system GPS, the real-time location information confirmation system is a GPS system of the tablet, rather than a port operation system that monitors location information for the entered information, depending on the completion of the task or the start of the task. Network configurations also reduce container processing delays by using commercial LTE services that do not have shading due to containers in the yard also reduce container processing delays. Trough introduction of smart devices using Android or IOS and container processing scheduling utilizing artificial intelligence, we will build a minimum delay system with Smart Device usage of container processing applications and optimization of container processing schedule. The adoption of smart devices and the minimization of container processing delays utilizing artificial intelligence are expected to improve the quality of port services by confirming the processing containers in real time to consumers who are container information demanders.