• 제목/요약/키워드: scale flexibility

검색결과 305건 처리시간 0.029초

GUI기법을 이용한 Load Flow 교육용 시뮬레이터 개발 (Development of Load Flow simulator for the Educational Program using GUI)

  • 문정환;김영용;장세환;류승오;박준호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.72-74
    • /
    • 2007
  • This paper presents a Windows graphic developed by the authors for the education and training of power system. Object-oriented programming is a major trend in computer software because it increases flexibility of large-scale software systems. An efficient platform for power system simulation applications has been proposed. This paper presents an intuitive Windows-based program for the power system analysis. The advantages of the object-oriented approach are demonstrated with an implementation of the graphical program. It provides a graphical interface for designing the one-line diagram of the bus and analyzing the output of the simulations. A graphical editor to visually edit the power system, diagram, results processing and exporting and graphic presentations.

  • PDF

뎅기 바이러스 진단을 위한 항원결정부위 예측 및 설계 (Peptide Antigen Prediction and Design for Immunodiagnosis of Dengue virus Infection)

  • 이지후;이인성;김학용
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2015년도 춘계 종합학술대회 논문집
    • /
    • pp.225-226
    • /
    • 2015
  • 뎅기 바이러스는 전 세계적으로 빠르게 확산되고 있는 모기 매개 바이러스이다. 현재까지 4가지의 혈청형이 알려져 있는 뎅기 바이러스는 뎅기열, 뎅기 출혈열과 뎅기 쇼크증후군 등을 유발한다. 현재 뎅기 바이러스가 전 세계적으로 확산되고 있음에도 불구하고 확실한 치료제나 백신이 없기 때문에 초기 진단이 매우 중요하다. 아열대기후로 진입하는 우리나라에서도 흰줄숲모기가 자주 발견되기 때문에 이 질병으로부터 결코 자유롭지가 않다. 바이러스 감염을 진단하기 위한 진단키트를 개발하기 위해서는 타깃 유전자 부위 선정이 매우 중요하기 때문에 본 연구에서는 먼저 생명정보학을 기반으로 뎅기 바이러스만을 특이적으로 검출할 수 있는 항월결정부위를 예측하고 진단키트에 적용하고자 하였다. 4가지 유형의 뎅기 바이러스 유전자들을 찾고, ProtScale Tool 프로그램으로 친수성(hydrophilicity), 접근성(acc -essibility), 유연성(flexibility), 회전(${\beta}-turns$) 등의 특성을 분석하여 항원결정부위를 선정하였다. 이 항원결정부위를 이용하여 단일클론항체를 제작하였으며 향후 진단키트로의 적용 가능성을 확인하였다.

  • PDF

비선형 다중채널 Loudness 교정을 위한 고성능 보청기 칩 (High-performance Digital Hearing Aid Processor Chip with Nonlinear Multiband Loudness Correction)

  • 박영철;김동욱;김원기;박상일
    • 대한의용생체공학회:학술대회논문집
    • /
    • 대한의용생체공학회 1997년도 춘계학술대회
    • /
    • pp.342-344
    • /
    • 1997
  • Owing to technical advances in very large-scale integrated circuits (VLSI), high-speed digital signal processing (DSP) chips become fast enough to allow for real-time implementation of hearing aid algorithms in units small enough to be wearable. In this paper, we present a digital hearing aid processor (DHAP) chip built around a general-purpose 16-bit DSP core. The designed DHAP performs a nonlinear loudness correction of 8 octave frequency bands based on audiometric measurements. By employing a programmable DSP, the DHAP provides all the flexibility needed to implement audiological algorithms. In addition, the has a low power feature and $5.410\times5.720mm^2$ dimensions that fit for wearable devices.

  • PDF

프랭크 로이드 라이트의 유소니언 주택의 생태적 특성 (Ecological Characteristics of Usonian Houses of Frank Lloyd Wright)

  • 윤지영
    • KIEAE Journal
    • /
    • 제10권3호
    • /
    • pp.17-26
    • /
    • 2010
  • This study aims at exploring the characteristics of the Usonian houses of Frank Lloyd Wright from an ecological viewpoint. After considering the definition and application of ecological architecture through literature review, 28 Usonian houses were selected and analyzed for the study. Also, nine Usonian houses, which clearly have ecological and historical importance, were visited and more thoroughly analyzed. The result shows that Usonian houses are ecological in terms of 1) the relationship among nature, landscape and house, 2) the orientation, natural light and natural ventilation, 3) the use of natural local materials including wood, stones and bricks, 4) the use of floor heating (the On-dol system inKorea), 5) the human scale, 6) the use of the board and batten unit (an early system of prefabrication), and 7) the openness and flexibility of floor plans.

전동차 유지보수를 위한 BOM 체계 구축에 관한 (A Study on BOM System Constructing for Rolling Stock Maintenance)

  • 손영진;이강원
    • 한국철도학회논문집
    • /
    • 제10권2호
    • /
    • pp.195-200
    • /
    • 2007
  • The most important part of RIMS(Rolling Stock Information Maintenance System) project is to construct BOM(Bill of Material). BOM is a listing or description of raw materials, parts, and assemblies that define a product. To construct BOM for RIMS is not a easy task due to several reasons such as data base scale and flexibility, proper integration between physical BOM and functional BOM, interoperability with other systems, etc. In this study we show several principles that Seoul Metro takes to get over the difficulties mentioned above. Based on these principles we propose the methodology Seoul Metro employs to construct BOM efficiently. We also discuss the applicability of BOM in several fields.

PC 기반 제어용 I/O 시스템 구축에 관한 연구 (An implementation of PC based I/O system for control applications)

  • 변승현;장태인;곽귀일;조지용
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 1998년도 하계종합학술대회논문집
    • /
    • pp.491-494
    • /
    • 1998
  • Due to the improvement of PC performance and windows-based OS, PC-based control system is gradually taking over industrial control in the industry site, replacing the closed proprietary syste. PC-based system gives the avantages of ease-of-use, cost-effectiveness, simplicity of maintenace and the flexibility to design I/O system using standard technology. While there are many real time software soltions, most of hardware solutions are closed, vendor-depednent, proprietary systems for large scale plants. In this paper, we suggest the method to configure PC-based I/O system based on standard technology which gives the avantages to use off-the-shelf products for system integration.

  • PDF

보강토의 시공중 거동 평가 (Behavior of a Reinforced Retaining Wall During Construction)

  • 노한성;최영철;백종은;김영남
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 가을 학술발표회 논문집
    • /
    • pp.95-100
    • /
    • 2000
  • When compared with conventional retaining wall system, there are many advantages to reinforced soil such as cost effectiveness, flexibility and so on. The use of reinforced soil have been increased in the last 17 years in Korea. In this study, a full-scale reinforced soil with rigid facing were constructed to investigate the behavior of reinforcing system. The results of soil pressure and strain of reinforcement during construction are described. The influence of compaction on soil pressure and strain of reinforcement is addressed. The results show that lateral earth pressures on the wall are active state during backfill. It is obtained that the lateral soil pressure depends on the installation condition of pressure cell and construction condition. It is also observed that maximum tensile strains of reinforcement are located on 50cm to 150cm from the wall. Long-term measurement will be followed to verify the design assumptions with respect to the distribution of lateral stress in the reinforcement

  • PDF

A new approach for resource allocation in project scheduling with variable-duration activities

  • 김수영;제진권;이상우
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1994년도 춘계공동학술대회논문집; 창원대학교; 08월 09일 Apr. 1994
    • /
    • pp.410-420
    • /
    • 1994
  • In many project-oriented production systems, e.g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [131 and by Leachman, Dincerler, and Kim [7] in extended formulations of the resource-constrained project scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach: (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationships of the activities also are presented.

자율분산 역 제어시스템 단계적 구축에 따른 테스트 방법 (Test method for step-by-step construction of Autonomous station control system)

  • 김영훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1239-1243
    • /
    • 2007
  • Autonomous Station Control System is automatic route control system of large-scale station. The system has flexibility of system step-by-step construction and expandability. A method of step-by-step construction for Autonomous Station Control System has system expansion and subsystem software expansion. The system has autonomous controllability and autonomous coordinability for system step by step construction. With property for a basis, each of subsystem communicates data field. Also, Each subsystem has its own management system, Autonomous Data Manager to manage itself and coordinate with the others. This paper make clear test method for Autonomous Station Control System expansion and software expansion. The first test method of system increasing construction is single station construction test. The second of method is connecting test the neighbor's Autonomous Station Control System. The third of method is connecting test the Autonomous Line Management System. Also, the test method of software expansion take the case of route control subsystem.

  • PDF

모니터링 센터의 사무 환경 디자인에 관한 연구 (A Study on the Office Environmental Design of Monitoring Center)

  • 김형년
    • 한국실내디자인학회논문집
    • /
    • 제33호
    • /
    • pp.46-53
    • /
    • 2002
  • The development of data communication and network technology has brought a change to various communications through the internet. Regarding the stable internet service, corporations and Individuals came to require an internet data center in which there is computer equipment and network devices available 24 hours everyday. The internet data center is now on a large scale in its structure and facility, suitable for the internet environment that is under development in various dimensions, and effective for task support, stable facility, capable of space expansion and flexibility, and easiness in ease of maintenance and management, etc. The monitoring center of the data center which is one of the core facilities in the center, special space elements and functions as well as a function of task space are to be put into consideration additionally. This study was to present a proposal for the space elements and environmental design of a monitoring center, which could create an efficient and comfortable room.