• Title/Summary/Keyword: scaffolding system

Search Result 76, Processing Time 0.03 seconds

A Study on Mathematics Teaching and Learning Program based on Zone of Proximal Development of Vygotsky (비고츠키의 근접발달영역을 고려한 수학과 교수·학습 프로그램연구)

  • Kang, Jung Mi;Choi, Chang Woo
    • East Asian mathematical journal
    • /
    • v.34 no.4
    • /
    • pp.339-358
    • /
    • 2018
  • There has been researches for effective education. Among them, many researchers are striving to apply Zone of Proximal Development of Vygotsky which is emphasizing the social interaction in the field of teaching and learning. Researchers usually research based on individual or small group of students. However the math class in school relies on system that one teacher teach many students in reality. So this research will look for the effect that the teaching and learning program based on Zone of Proximal Development of Vygotsky by designing the teaching and learning program which is based on scaffolding structuring to overcome the zone of proximal development in many-students class. The results of this research are as follows: First, the studying program considered the theory of Vygotsky has a positive effect on improving the mathematical achievement of elementary student. Second, the studying program considered the theory of Vygotsky has a positive effect on improving the student's studying attitude upon mathematics.

Innovative Technologies and Their Application on the Construction of a 100-Plus-Story Skyscraper

  • Haowen, Ye
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.3
    • /
    • pp.161-169
    • /
    • 2015
  • Experience on the construction of several 100-plus-story skyscrapers including Guangzhou West Tower, Guangzhou East Tower, and Shenzhen's KK100 is described considering the increasingly strong development trend of 100-plus-story skyscrapers in China. Difficulties in the construction of 100-plus-story skyscrapers are investigated. Four innovative construction technologies receive detailed descriptions: intelligently and entirely-jacked work platforms, formwork and suspension scaffolding systems ("jacking and formwork systems"), multi-function low-carbon concrete, 5D-BIM ("five-dimensional building information modeling"), and safe and rapid vertical transport, as they have found successful applications in actual projects. Popularized systematically as technical achievements, these technologies will significantly influence the construction of similar projects in the future, and produce more social and economic benefits.

A Study on Rationalization of Policy, Education, and Equipment Use to Improve the Safety at Height Work Using Rope (로프를 이용한 고소작업의 안전성 향상을 위한 정책, 교육 및 장비활용의 합리화에 대한 고찰)

  • Lim, Kwang sub;Hong, Sungchul
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.3
    • /
    • pp.79-85
    • /
    • 2022
  • The annual statistics on fall fatality consistently show the dangers of working at height. The "Occupational Safety and Health Act" specifies legal restrictions on work at height using a scaffold. However, there are different classes of work at height, and some rely only on ropes. This study proposes education, training, and institutionalization of the "rope access work system." In brief, it was concluded that accurate instruction on the knot method and the setting of some standards were important. For this, the use of an integrated work chair harness equipment was suggested.

Proposing a Pre-service Teacher Training Program for the Gifted Education

  • Shin Myeong-Kyeong;Park Jong-Wook;Chung Byung-Hoon
    • Journal of the Korean earth science society
    • /
    • v.26 no.4
    • /
    • pp.347-357
    • /
    • 2005
  • Since 1998, an elementary teacher education institute in Korea has hosted the center for the gifted education. The institute hired undergraduate students to escort and liaison each class of the gifted student participants with assisting classroom activities. These liaison teachers observed the gifted classroom activities and evaluated them by using a given checklist and filling out pre-made evaluation forms. Currently this system is being transferred from part-time jobs for students to earn allowance into well organized pre-service teacher program focusing on the gifted education. In other words, the purpose of system is being shifted from how liaison teachers facilitate the gifted program to how the system helps the liaison teachers to be quality teachers for the gifted who can understand what the gifted are and how to facilitate them. Analyzed were the self reports of the liaison teachers regarding their perceptions and beliefs of the gifted and their education program. It was found participant liaison teachers purposed to have more live experiences with getting along with students as well. Liaison teachers’ perceptions on establishing a gifted teacher professional education sequence were reported in this study. The potential scaffolding of the pre-service teacher education program model of the gifted education was provided as a consequence of this study.

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

Design of Building Excavation Plane in Innovative Prestressed Scaffolding(IPS) System (혁신적 프리스트레스트 가시설 구조시스템(IPS)을 적용한 굴착면의 해석 및 설계)

  • Kim, Sung-Bo;Han, Man-Yop;Kim, Moon-Young;Jung, Kyoung-Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.163-171
    • /
    • 2006
  • The behaviors and design procedures of building excavation plane in innovative prestressed support (IPS) system are presented in this paper. Determination procedure for initial pretension in IPS wale subjected to design earth pressure is derived. The computer analysis model under uniform and non-uniform earth pressure is constructed using beam element for the IPS wale, tension-only element for cable, and compression-only element for soil. Axial forces and bending moments of IPS wale under initial pretension and design earth pressure are calculated. The combined stresses due to these axial force and bending moment are calculated and safety condition of building excavation plane is investigated.

Risk Assessment for Hazardous Construction Work Recognized by Workers (건설위험직종 작업자의 위험체감도 평가)

  • Son, Ki-Sang;Lee, Shin-Jae
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.3 s.75
    • /
    • pp.67-72
    • /
    • 2006
  • This study is to investigate the related materials such as domestic law regulation, research paper, research report, and the other material, and to suggest suitable counter measures, to find out hazard degree for its works of workers and work place through direct survey, in order to determine risk score of each hazardous work which is designated by the Government, without consideration of labour's consciousness against risk level at a site. Therefore, a new questionnaire survey related to the decision of risk level are made and distributed to find out what risk level each worker recognizes. Also, the authors tried to approach reasonable conclusions after discussing reasonability of qualification standard and improving ideas of worker at hazardous work places with worker, faculty member, H&S manager, labour union. And the results show hazard degrees by each work kind of the above: 3.75 for working with machinery, 3.7 for steel structure, 3.5 for operation of tower crane, 3.51 for retaining wall, 3.85 for form work, 3.46 for scaffolding are obtained. This quantified risk can be applied to establishing a reasonable system to keep safe against hazardous works.

Bacterial Overexpression and Denaturing Purification of VPS34-Binding Domain of Beclin 1

  • Baek, Jong-Hyuk;Jung, Juneyoung;Seo, Jeongbin;Kim, Jeong Hee;Kim, Joungmok
    • Journal of Microbiology and Biotechnology
    • /
    • v.26 no.10
    • /
    • pp.1808-1816
    • /
    • 2016
  • As a scaffolding subunit of the PIK3C3/VPS34 complex, Beclin 1 recruits a variety of proteins to class III phosphatidylinositol-3-kinase (VPS34), resulting in the formation of a distinct PIK3C3/VPS34 complex with a specific function. Therefore, the investigation of a number of Beclin 1 domains required for the protein-protein interactions will provide important clues to understand the PIK3C3/VPS34 complex, of which Beclin1-VPS34 interaction is the core unit. In the present study, we have designed a bacterial overexpression system for the Beclin 1 domain corresponding to VPS34 binding (Vps34-BD) and set up the denaturing purification protocol due to the massive aggregation of Vps34-BD in Escherichia coli. The expression and purification conditions determined in this study successfully provided soluble and functional Vps34-BD.

Distribution of Time-dependent Strains In the Top Slab of PSC Box Girder Bridge (PSC박스거더교 상부슬래브에서의 시간의존적 변형률 분포)

  • Kim, Young-Jin;Kim, Byung-Suk;Kawrk, Jong-Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.538-541
    • /
    • 2006
  • PSC(Prestressed Concrete) box girder bridges have been widely applied in Korea. A number of these bridges have been built by the segmental construction method in the longitudinal direction and(or) vertically along the cross-sectional depth with MSS(Moving Scaffolding System). An actual 2-span continuous PSC box girder bridge of Kyeongbu high speed railway was selected and instrumented with 96 vibrating wire embedded type strain gauges and 2 thermocouples. The long-term behavior of the bridge was monitored through two major points located at mid-span of the first span and at the internal support. Data collection started just after the casting of the first segment (U section). Concrete strain and temperature data were gathered regularly by a data logger (CR10) during 600 days under and after construction. According to this measurement, the parabolic longitudinal strain distribution in the top slab at mid-span is shown. And also, the same distribution at the interior support is shown. The compressive strains at the cantilever region are larger than at the web position and the internal part in the top slab. Strain difference largely happened during the early construction period.

  • PDF