Recently, engineering problems such as long-term settlement, differential settlement, and the resultant structural damage, have been frequently reported at construction sites. Use of Sand Compaction Piles(SCP) and Granular Compaction Piles(GCP) are good at remedying existing problems, improving bearing capacity and promoting consolidation. However, such compaction piles have the potential for clogging, which would limit their usability. Investigations into the potential for clogging in SCP, GCP, and GCP mixed with sand has not been thoroughly conducted and is the objective of this current study. Large scale direct shear tests were performed on sections of SCP, GCP, and sand mixed GCP to evaluate bearing capacity. Discrete Element Method analyses were conducted with PFC3D and Finite Element Analyses were conducted with MIDAS GTS to propose an algorithm to help reduce clogging in the granular compaction piles. Results from the large scale direct shear test and multiple simulations suggest a 70% gravel and 30% sand mixing ratio to be optimal for bearing capacity and reducing clogging.
To find out the most efficient arrangement of root piles reinforcing sandy soil under a strip footing, a series of model tests for the patten A of by R.H. Bassett and N.C. Last are carried out. In the model test, the variables adopted are a pile length, longitudinal spacing, and the number of rows of piles. According to the results, the most efficient longitudinal spacing of piles is six times of a pile diameter. When the pile length exceeds five times of footing width, no further increase of reinforcing effect is observed. In the pattern A, piles of second row exhibit the largest reinforcing effect and the fifth row show no significant reinforcing effect on the soil.
Proceedings of the Korean Geotechical Society Conference
/
2009.09a
/
pp.913-922
/
2009
Fourteen model pile load tests using a calibration chamber and instrumented model pile were preformed to investigate the variation of the behaviors of driven piles in sands with soil and lateral cyclic loading conditions. Results of the model tests showed that the first loading cycle generated more than 70% of the pile head rotation developed for 50 lateral loading cycles. Lateral cyclic loading also made an increase of the ultimate lateral load capacity of piles for $K_0$=0.4 and an decrease for $K_0$ higher than 0.4. Higher portion of the increase or decrease in the ultimate lateral load capacity by lateral cyclic loading was generated for the first loading cycle due to densification of loosening of the soil around the pile by lateral cyclic loading. It was also observed that a two-way cyclic loading caused higher ultimate lateral load capacity of driven piles than a one-way cyclic loading. When the pile was in the ultimate state, the maximum bending moment developed in the pile increased with increasing $K_0$ value of soil and was insensitive to the magnitude and number of lateral cyclic loading.
The failure of slope can cause remarkable damage to either human life or infrastructures. Stabilizing piles are widely utilized to reinforce slope as a slip-resistance structure. The workability of pile-stabilized slopes is affected by various parameters. In this study, the performance of earth slope reinforced with piles and the behavior of piles under static load, by shear reduction strength method using the finite difference software (FLAC3D) has been investigated. Parametric studies were conducted to investigate the role of pile length (L), different pile distances from each other (S/D), pile head conditions (free and fixed head condition), the effect of sand density (loose, medium, and high-density soil) on the pile behavior, and the performance of pile-stabilized slopes. The performance of the stabilized slopes was analyzed by evaluating the factor of safety, lateral displacement and bending moment of piles, and critical slip mechanism. The results depict that as L increased and S/D reduced, the performance of slopes stabilized with pile gets better by raising the soil density. The greater the amount of bending moment at the shallow depths of the pile in the fixed pile head indicates the effect of the inertial force due to the structure on the pile performance.
Presently, domestic SCP method with low replacement ratio is required as alternative in order to overcome the profitability of the sand resource because of the deficiency phenomenon of the sand resource by the actual condition design and construction is made by SCP method with low replacement ratio more than 70% for the port construction in the safe side. Sand compaction pile(SCP) method has been mainly used to improve the properties of soft clay or loose sandy ground. In design of SCP at soft clay ground, it is very important to determine the stress concentration ratio of composite ground relevant to the area replacement ratio. In this study, 2-dimensional FEM analyses were carried out to evaluate the stress concentration ratio of composite ground depending upon the area replacement ratio. When the interpretation result replacement ratio was 30%, the stress assigned rate showed and as the replacement ratio was high, the stress assigned rate according to the sinkage showed the low stress assigned rate.
This study describes a series of model tests on instrumented pile groups embedded in HAP-CHEN sand undergoing lateral movement. We tried to find the effect of group piles dependent on a number of factors, including the position of the pile in a group, the pile spacing, and the pile arrangement. The results of test are as follows. For the group piles, the bending moment profile for each pile is similar in shape to that of single pile, although the magnitude and the position of the maximum bending moment are different. $R_M$ (the ratio of maximum bending moment) and $R_F$ (the ratio of resistance to lateral soil movement) were found to increase with increasing pile spacing. When a pile is in a group under lateral soil movement, RM increased in the order of the middle row, front row, back row, according to the direction of lateral deformation, and the outer pile has a larger RM than the inner pile.
Kim, Hong-Taek;Hwang, Jung-Soon;Kim, Chan-Dong;Kang, Yun
Journal of the Korean GEO-environmental Society
/
v.5
no.1
/
pp.13-25
/
2004
Granular compaction piles increase the load bearing capacity of the soft ground and reduce the settlement of foundation built on the reinforced soil. The granular compaction group piles also accelerate the consolidation of the soft ground and prevent the liquefaction caused by earthquake using the granular materials such as sand, gravel, stone etc. However, this method is one of unuseful method in Korea. In the present study, the optimum locations of granular compaction group piles using genetic algorithm are proposed. The results were shown that the bearing capacity was increased in the case concentrated on the central part of the group piles. Also, the optimum design for total weight of granular compaction group piles was carried out in consideration of the economical efficiency and parametric studies were performed to examine the effects of parameters at the design of granular compaction group piles.
Fattah, Mohammed Y.;Yousif, Mustafa A.;Al-Tameemi, Sarmad M.K.
Structural Engineering and Mechanics
/
v.54
no.5
/
pp.829-853
/
2015
This is an experimental study to investigate the behaviour of piled raft system in different types of sandy soil. A small scale "prototype" model was tested in a sand box with load applied to the foundation through a compression jack and measured by means of load cell. The settlement was measured at the raft by means of dial gauges, three strain gauges were attached on piles to measure the strains and calculate the load carried by each pile in the group. Nine configurations of group ($1{\times}2$, $1{\times}3$, $1{\times}4$, $2{\times}2$, $2{\times}3$, $2{\times}4$, $3{\times}3$, $3{\times}4$ and $4{\times}4$) were tested in the laboratory as a free standing pile group (the raft not in contact with the soil) and as a piled raft (the raft in contact with the soil), in addition to tests for raft (unpiled) with different sizes. It is found that when the number of piles within the group is small (less than 4), there is no evident contribution of the raft to the load carrying capacity. The failure load for a piled raft consisting of 9 piles is approximately 100% greater than free standing pile group containing the same number of piles. This difference increases to about 4 times for 16 pile group. The piles work as settlement reducers effectively when the number of piles is greater than 6 than when the number of piles is less than 6. The settlement can be increased by about 8 times in ($1{\times}2$) free standing pile group compared to the piled raft of the same size. The effect of piled raft in reducing the settlement vanishes when the number of piles exceeds 6.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.11a
/
pp.9-10
/
2015
Waste Concrete Powder will be generated during the manufacture of construction waste as recycled aggregate Waste concrete. The main component of the waste concrete Powder is a silica-based composition 51% SiO2, waste concrete cement-based composition Al2O3 10%, CaO 26% component are contained. The material is silica sand of PHC piles should experiment by replacing the Waste Concrete Powder. The compressive strength results are as follows. 25% when the Silica was replaced 32.5Mpa, when 50% have replaced 43.4Mpa, when 75% have replaced 45.3Mpa was measured. Compared with the non-replaced test sample it appears that the strength increases. Therefore, it is determined that the practical use of the PHC piles by replacing silica via this experiment is possible.
This paper presents results km a series of model tests oil vertically loaded single piles to compare the behaviors of H and pipe piles under the same ground condition. The aims of this paper were to compare the bearing capacity of H-pile md pipe piles under in the same ground condition and to estimate the effect of gravity acceleration and relative soil density. Relative density of soil were made to be 40%, 80% and embedded length of pile on sand was increased by 10, 12, 14, 16 times of the diameter of pile, respectively. As a results of test series, allowable load of H-pile is from 6.4% to 18.2% larger than allowable load of pipe pile in relative density 80% and from 9.1% to 39.4% larger than allowable load of pipe pile in relative density 40%. As a results of numerical analysis, we were predicted behaviour of stress-displacement of pile with model test. In the case of relative density 80% and 40%, bearing capacity of H pile represent from 17.74% to 18.6% larger than allowable load of pipe pile.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.