• Title/Summary/Keyword: safety stock

Search Result 330, Processing Time 0.02 seconds

A Study of Performance Target Setting of Regression point of view -Focusing on the Intellectual Right and a Paper for the Railway R&D (회귀적관점의 성과목표 설정에 관한 연구 -철도연구개발의 지식재산권 및 논문 성과를 중심으로-)

  • Park, Man-Soo;Kwon, Yong-Jang;Lee, Hi-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.321-326
    • /
    • 2010
  • Government evaluate annually a performance of government's R&D(Research & Development) and decide a budget and progress. So, a performance target setting of R&D is very important at the planning, The basic performance target setting of railroad R&D is clear. However, a scientific and technological performance target setting of railroad R&D is very difficult and a reasonable level of it can not be judged. Therefore, this study will suggest a solution for a scientific and technological performance target setting of railroad R&D through regression analysis of successfully finished railroad R&D, after judging a reasonability of a scientific and technological performance through comparing railroad R&D with the other R&D.

A Study on the Prevention Measures of Human Error with Railway Drivers (열차 운전 종사자를 대상으로 한 인적오류의 개선 방안 연구)

  • Kim, Dong Won;Song, Bo Young;Lee, Hi Sung
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.1
    • /
    • pp.76-81
    • /
    • 2019
  • In this study, the causes of human error were identified through the survey of the drivers of the three organizations: Seoul Metro, Seoul Metropolitan Rapid Transit Corporation, and Korail. It was started with the aim of finding and eliciting causes in various directions including human factors, job factors, and environmental factors. The Cronbach alpha value was 0.95 for the reliability significance of the stress-induced factors in the operational area. The significance probability for organisational factors was shown to be 0.82, and the significance of the sub-accident experience and the driving skill factors in operation was 0.81 In addition, the analysis results showed that stress-induced in the field of driving is higher than the human factors in the reliability analysis. The results of the analysis confirmed that the reliability of the organizational and operational stress-induced factors was higher than other causes. In order to reduce urban railroad accidents, this paper suggests a method for operating safe urban railroad through the minimization human errors.

A Study on the Life Cycle Establishment and Improvement of Main Parts for Electric Locomotive (전기기관차 주요부품의 수명주기 설정 및 개선방안에 관한 연구)

  • Lee, Doek Koo;Lee, Hi Sung
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.2
    • /
    • pp.1-9
    • /
    • 2021
  • The 8200-unit electric locomotive, which is a high-efficiency multipurpose electric locomotive, is a German model, namely BR152 series ES64F, and it is manufactured to suit the operating conditions in Korea. Since 2003, 83 locomotives have been introduced in Korea, and they have been operating in the general railway sector for both passenger and freight transport. Although more than 15 years have passed since their first introduction, owing to the characteristics of vehicles introduced overseas, responding promptly to failures has been difficult owing to problems related to factors such as transfer of technology and procurement of parts for maintenance. Furthermore, there have been difficulties in operating the locomotives on the basis of the manufacturer-recommended time-between-overhaul (TBO) cycle. Therefore, a new TBO should be determined. To support the development of a reliability-based maintenance system, this study conducted a reliability and TBO analysis by using failure data obtained from KOVIS, and future management measures are presented.

Conceptual Design on Doorstep Equipments Used for Low and High Level Railway Platforms (저상 및 고상 철도 승강장 겸용 승강문 스텝 개념설계)

  • Park, Min-Heung;Kim, Chul-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.9
    • /
    • pp.3882-3888
    • /
    • 2012
  • In order to operate trains both mainline railroad platform and metropolitan subway line platform, it is necessary to develop the doorstep equipment of the rolling stock regardless of low(500mm, mainline) and high level platforms(1,135mm, metropolitan subway line) because of the requisite door safety system. In this study, two different types of platforms were examined. On closer examination, it seems that the conceptual design is suitable for telescopic sliding type doorstep equipment to minimize damage to the carbody underframe of railway vehicles and can also minimize the variation of the distance between the railway platform. Furthermore, the operation process and control flowchart of doorstep equipments by stages are proposed by various performance requirements.

A Study on Demand Selection in Supply Chain Distribution Planning under Service Level Constraints (서비스 수준 제약하의 공급망 분배계획을 위한 수요선택 방안에 관한 연구)

  • Park, Gi-Tae;Kim, Sung-Shick;Kwon, Ick-Hyun
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.3
    • /
    • pp.39-47
    • /
    • 2006
  • In most of supply chain planning practices, the estimated demands, which are forecasted for each individual period in a forecasting window, are regarded as deterministic. But, in reality, the forecasted demands for the periods of a given horizon are stochastically distributed. Instead of using a safety stock, this study considers a direct control of service level by choosing the demand used in planning from the distributed forecasted demand values for the corresponding period. Using the demand quantile and echelon stock concept, we propose a simple but efficient heuristic algorithm for multi-echelon serial systems under service level constraints. Through a comprehensive simulation study, the proposed algorithm was shown to be very accurate compared with the optimal solutions.

  • PDF

Development of the technology to verify the systems interface for the High speed Electric Multiple Unit (차세대고속철도기술개발사업 시스템인터페이스 시험기술 개발)

  • Kang, B.M.;Jeong, S.G.;Ahn, H.K.;Choi, H.C.;Yu, S.W.
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.810-815
    • /
    • 2010
  • Since a long time ago, many railway engineers analyze and discuss the interface between the sub-system of railway, such as a wheel/rail interface, pantograph/catenary interface etc. The verifying of the system interface could help to achive the optimized performance and safety of the railway system considering that the railway system is constructed by various engineerings, such as civil, mechanical, electrical, etc. A rolling stock with distributed drive system, which will be developed by HEMU-400x project, is capable of running on high speed line and conventional line in Korea. To verify the performance of rolling stock, test run will be done with revenue service line. And the test items of the system interface have to be selected to verify a functional compatibility and physical force between rolling stock and infrastructure. In this paper, the authors will indicates the test items to verify system interface. To achive the conclusion, the authors analyze a specification of the development train and the design value of Seoul-Busan high speed line, which will be used for testing of the development train, and also, study the various case of high speed train commissioning.

  • PDF

A System Dynamics View of Safety Management in Small Construction Companies

  • Guo, Brian H.W.;Yiu, Tak Wing;Gonzalez, Vicente A.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.92-96
    • /
    • 2015
  • Due to unique characteristics of small construction companies, safety management is comprised of complex problems (e.g., resources constraints, a lack of formalized management structures, low level of management safety commitment etc.). In order to understand causal interdependencies between safety factors at different system levels (regulation, organization, technical and individual), this paper aims to develop a system dynamics (SD) model of safety management in small construction companies. The purpose of the SD model is to better understand why small construction companies have low level of safety performance. A causal loop diagram (CLD) was developed based on literature, with an attempt to map causal relationships between variables. The CLD was then converted into stock and flow diagram for simulation. Various tests were conducted to build confidence in the model's ability to represent the reality. A number of policies were analyzed by changing the value of parameters. The value of a system dynamics approach to safety management in small construction companies is its ability to address joint effects of multiple safety risk factors on safety performance with a systems thinking perspective. By taking into account feedback loops and non-linear relationships, such a system dynamics model provides insights into the complex causes of relatively poor safety performance of small construction companies and improvement strategies.

  • PDF

Analysis of Safety Stock and Service Level For an Distribution Center with Variable Demand Variable Lead Time Model (수요 및 조달기간의 변동을 고려한 물류 센터의 안전재고와 서비스수준 분석)

  • 박명규;조용욱
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.3
    • /
    • pp.65-75
    • /
    • 2001
  • This research fundamentally deals with an analysis of service level for a multi-level inventory distribution system which is consisted of a central distribution center and several branches being supplied stocks from the distribution center, Under continuous review policy, the distribution center places an order for planned order quantity to an outside supplier, and the order quantity is received after a certain lead time. Also, each branch places an order for particular quantity to its distribution center, and receives the order quantity after a lead time. In most practical distribution environment, demands and lead times are generally not fixed or constant, but variable. And these variabilities make the analysis more complicated. Thus, the main objective of this research is to suggest a method to compute the service level at each depot, that is, the distribution center and each branch with variable demands and variable lead times. Further, the model will give an idea to keep the proper level of safety stocks that can attain effective or expected service level for each depot.

  • PDF

On Study the Safety Diagnosis of Carbody Structure for Crashed Electric Multiple Units (사고전동차 구조체의 안전진단에 관한 고찰)

  • Bae Dae-Sung;Park Geun-Soo;Chung Jong-Duk
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.3
    • /
    • pp.253-259
    • /
    • 2005
  • This paper describes 3D Dimensional Measurement(EDM testing) and tensile testing results of carbody structure for crashed EMU(Electric Multiple Units). Tensile tests were performed on two different types of specimens in order to evaluate the strength changes before and after damages, obtained from plastic deformed area and nondeformed region of the crashed EMU. And Structural analysis of EMU was performed for the criteria of safety assessment. Structural analysis using commercial I-DEAS software provided important information on the stress distribution and load transfer mechanisms as well as the amount of damages during rolling stock crash. The testing results have been used to provide the critical information for the criteria of safety diagnosis.

A Railway Safety Proposal with Full System Commissioning (철도시스템의 종합시험운행을 통한 철도안전 확보방안)

  • Kim, Jeong-Joo;Lee, Hi-Sung;Moon, Dae-Seop
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.522-527
    • /
    • 2005
  • Rail network authority have to do the safety ensuring activities including the maintenance of railway facility, integrated performance verification between the facilities and related rolling stock and safety inspections, etc. When constructing the new lines or revising the conventional lines, full system commissioning should be done before the revenue service with railway operator. To develop the optimal full system commissioning model, the status of domestic and foreign railway facility and railway accidents are analysed and the problems of the safety management are derived. As one of countermeasures for the problems, the procedures and criteria for the full system commissioning are developed.

  • PDF