Transactions of the Korean Society of Mechanical Engineers A
/
v.24
no.1
s.173
/
pp.134-143
/
2000
A train performance simulation (TPS) software is a computer program that simulates the operation of a train system over a specified railway route and it is widely used in railroad operation and research applications. Numerical and graphical results from the simulation software, which is developed in this study, provide information on such performance variables as travel time. running speed, energy consumption at a specific time interval and in overall service time as the train moves along the route. Three types of input data are required for a computer simulation: track information, train information, and running conditions. The simulation of train performance starts with several simple mathematical models including train configuration. traction efforts, running resistance. and braking requirements. Based on the basic specifications of Korean High Speed Railway, System. this study, puts a focus on the estimation and assessment of train performance comparing. the specific train configurations of KEST20/11. CPLE20/10. PROP20/10, which are proposed from the previous G7 projects.
Tiwari, Kunal;Hariharan, K.;Rameesha, T.V.;Krishnankutty, P.
Ocean Systems Engineering
/
v.10
no.3
/
pp.333-357
/
2020
International Maritime Organisation (IMO) regulations insist on reduced emission of CO2, noxious and other environmentally dangerous gases from ship, which are usually let out while burning fossil fuel for running its propulsive machinery. Contrallability of ship during sailing has a direct implication on its course keeping and changing ability, and tries to have an optimised routing. Bad coursekeeping ability of a ship may lead to frequent use of rudder and resulting changes in the ship's drift angle. Consequently, it increases vessels resistance and also may lead to longer path for its journey due to zigzag movements. These adverse effects on the ship journey obviously lead to the increase in fuel consumption and higher emission. Hence, IMO has made it mandatory to evaluate the manoeuvring qualities of a ship at the designed stage itself. In this paper a numerical horizontal planar motion mechanism is simulated in CFD environment and from the force history, the hydrodynamic derivatives appearing in the manoeuvring equation of motion of a ship are estimated. These derivatives along with propeller thrust and rudder effects are used to simulate different standard manoeuvres of the vessel and check its parameters against the IMO requirements. The present study also simulates these manoeuvres by using numerical free running model for the same ship. The results obtained from both these studies are presented and discussed here.
Journal of Advanced Marine Engineering and Technology
/
v.23
no.3
/
pp.346-351
/
1999
This paper is a research for removing the hunting which came about during the parallel running of the alternators which four-pole six-phase have the converter with twelve diodes to rectify all the waves. Druing the parallel running the hunting came about under the period of 0.2-0.3{sec} not when it's load was the resistance but the capacity at the rpm band 1575[rpm] 1690[rpm] This hunting in our judgement was not come about from the general hunting causes which have been already known to but the special example. And so we checked that the hunting came about or not as per the changes of the rpm exciting current load current and converter and converter output voltage and the following facts were revealed. -The hunting occured during the constant voltage charging where r. p. m band is from 1575[rpm] to 1690[rpm] - The hunting did not came about during the constant power charging in which there was the large difference between the converter output voltage and the battery voltage. -The hunting did not came about in the low rpm band. We could see from the above facts that the existence of the hunting inducing point at the con-stant voltage charging band was the direct cause of the hunting. After trying every possible means to remove the hunting inducing point we could know that the modification of the synchronous generator is suitable for he purpos in view of the small engine room.
The excessive axial load occurred in an immovable zone of continuous welded rail(CWR) tracks threatens the security of running trains due to the track buckling in extreme hot summer. The influence factors, such as rail temperature for compressive stress, ballast resistance for track stiffness and initial imperfection of track for tracks irregularity are uncertain track parameters that are randomly varied by climate conditions, operating conditions and maintenance of track etc. So, buckling of CWR tracks has very high uncertainties. Therefore, applying the probabilistic approach method is essential in order to rationally consider the uncertainty and randomness of the various parameters. In this study, buckling sensitivity analysis was carried out with respect to the characteristics of probability distribution of lateral ballast resistance using the buckling probability evaluation system of CWR tracks developed by our research team.
Jo, Ji-Min;Choi, Min-Seok;Han, Young-Gyu;Kim, Yeong-Kwan
Journal of Industrial Technology
/
v.36
/
pp.83-88
/
2016
In this study, a series of experiment was carried to improve dewaterability of the sludge produced in a treatment plant, located in Hongcheon, Gangwondo, which has been treating municipal wastewater and livestock wastewater. Optimum sludge mixing ratio and the amount of sludge conditioner were determined. As sludge conditioners, alum and ferric salt were selected and tested. For the measurement of sludge dewaterability, capillary suction time(CST) and the specific resistance were measured, The specific resistance was detemined by running a series of Buchner Funnel Test. Mixing the two sludges at a 50:50 ratio with the addition of 20 mL alum gave the best results in terms of dewaterability. The moisture content decreased by 2% at this condition.
We developed an embedded Object-Oriented Micromagnetic Frame (OOMMF) script schemes for more flexible simulations for complex and dynamic mircomagnetic behaviors. The OOMMF can be called from any kind of softwares by system calls, and we can interact with OOMMF by updating the input files for next step from the output files of the previous step of OOMMF. In our scheme, we set initial inputs for OOMMF simulation first, and run OOMMF for ${\Delta}t$ by system calls from any kind of control programs. After executing the OOMMF during ${\Delta}t$, we can obtain magnetization configuration file, and we adjust input parameters, and call OOMMF again for another ${\Delta}t$ running. We showed one example by using scripting embedded OOMMF scheme, tunneling magneto-resistance dependent switching time. We showed the simulation of tunneling magneto-resistance dependent switching process with non-uniform current density using the proposed framework as an example.
At the running speed higher than 250 km/h, several aerodynamic problems such as the increase of aerodynamic resistance, aerodynamic noise, pressure fluctuation at the tunnel entry, impulsive wave at the tunnel exit bring about the power consumption, deterioration of riding quality, and severe environmental noise. To solve these aerodynamic problems, the flow phenomena around the high speed train have to be analyzed in detail. In this study, the flow around the train is modelled as the 2-dimensional viscous compressible flow and the flow field is calculated numerically for the three different types of geometry and running speed. The aerodynamic drag coefficient and the pressure coefficient are evaluated each case.
This study presents the minimum spring stiffness of resilient track pad considering the safety of running train. A nonlinear static 3-D finite element is used for the modeling of railway superstructure, especially for the reflection of nonlinear resistance of rail fastening system. Moreover, ballast is considered as an elastic foundation. As the input load, eccentric wheel and lateral force are used and they are derived from ' Lateral-force/Wheel-load Estimation Equations '. Analysis results are compared with following two values : allowable lateral displacement of rail head (derived from the geometrical derailment evaluation of wheel/rail) and operation standard value (derived from the field test results of track).
In this paper, train running test and lateral resistant force test are conducted before and after sprinkling the ballast stabilizer in order to investigate the dynamic behaviors and parameters of the railroad track. The measured results are used to confirm the effect of the stabilizer and to validate the numerical results. From this paper, it is known that the stabilizer used in this study has excellent effect on increasing the vertical rigidity and the lateral resistance, and some correction factors should be considered on masses and rigidities of the track components in order to calculate the vibration magnitude reasonably due to running train.
A 18-year-old female underwent surgical correction of tricuspid atresia and complete transposition of great arteries combined with atrial 8 ventricular septal defect and pulmonary stenosis. After the transection of main pulmonary artery just above the pulmonic valve, proximal portion of main pulmonary artery was closed with running suture and distal portion of main pulmonary artery anastomosed with right atrial appendage without valve insertion. Atrial septal defect was closed with running suture. Postoperative course was uneventful and she discharged on 18th postoperative day. Her condition is in very good until present. Modified Fontan`s operation without valve placement [in the condition of low pulmonary vascular resistance and good left ventricular function] may has a good result.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.