• 제목/요약/키워드: rule-based scheduling

검색결과 70건 처리시간 0.022초

지능형 제어기법에 의한 생산 계획 설계 (Design of the intelligent control-based job scheduler)

  • 이창훈;서기성;정현호;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1989년도 한국자동제어학술회의논문집; Seoul, Korea; 27-28 Oct. 1989
    • /
    • pp.286-289
    • /
    • 1989
  • The purpose of this paper is to design a job scheduling algorithm utilizing intelligent control technique. Rulebase is built through the evaluation of rule-set scheduling. 24 scheduling rule-sets and meta-rules are employed. An appropriate scheduling rule-set is selected based on this rulebase and current manufacturing system status. Six criteria have been used to evaluate the performance of scheduling. The performance of sheduling is dependent on random breakdown of the major FMS components during simulation.

  • PDF

Discrete event systems modeling and scheduling of flexible manufacturing systems

  • Tamura, Hiroyuki;Hatono, Itsuo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1991년도 한국자동제어학술회의논문집(국제학술편); KOEX, Seoul; 22-24 Oct. 1991
    • /
    • pp.1564-1569
    • /
    • 1991
  • In this paper we describe Flexible Manufacturing Systems (FMS) using Petri nets, since Petri nets provide a powerful tool for modeling dynamical behavior of discrete concurrent processes. We deal with off-Line and on-Line rule-based scheduling of FMS. The role of the rule-base is to generate appropriate priority rule for resolving conflicts, that is, for selecting one of enabled transitions to be fired in a conflict set of the Petri nets. This corresponds to select a part type to be processed in the FMS. Towards developing more Intelligent Manufacturing Systems (IMS) we propose a conceptual framework of a futuristic intelligent scheduling system.

  • PDF

동적 Job Shop 일정계획을 위한 유전 알고리즘 (A Genetic Algorithm for Dynamic Job Shop Scheduling)

  • 박병주;최형림;김현수;이상완
    • 한국경영과학회지
    • /
    • 제27권2호
    • /
    • pp.97-109
    • /
    • 2002
  • Manufacturing environments in the real world are subject to many sources of change and uncertainty, such as new job releases, job cancellations, a chance in the processing time or start time of some operation. Thus, the realistic scheduling method should Properly reflect these dynamic environment. Based on the release times of jobs, JSSP (Job Shoe Scheduling Problem) can be classified as static and dynamic scheduling problem. In this research, we mainly consider the dynamic JSSP with continually arriving jobs. The goal of this research is to develop an efficient scheduling method based on GA (Genetic Algorithm) to address dynamic JSSP. we designed scheduling method based on SGA (Sing1e Genetic Algorithm) and PGA (Parallel Genetic Algorithm) The scheduling method based on GA is extended to address dynamic JSSP. Then, This algorithms are tested for scheduling and rescheduling in dynamic JSSP. The results is compared with dispatching rule. In comparison to dispatching rule, the GA approach produces better scheduling performance.

레이더의 부하 상태에 따른 빔 스케줄링 알고리즘의 선택적 적용 (Differential Choice of Radar Beam Scheduling Algorithm According to Radar Load Status)

  • 노지은;김동환;김선주
    • 한국군사과학기술학회지
    • /
    • 제15권3호
    • /
    • pp.322-333
    • /
    • 2012
  • AESA radar is able to instantaneously and adaptively position and control the beam, and such adaptive beam pointing of AESA radar enables to remarkably improve the multi-mission capability. For this reason, Radar Resource Management(RRM) becomes new challenging issue. RRM is a technique efficiently allocating finite resources, such as energy and time to each task in an optimal and intelligent way. Especially radar beam scheduling is the most critical component for the success of RRM. In this paper, we proposed a rule-based scheduling algorithm and Simulated Annealing(SA) based scheduling algorithm, which are alternatively selected and applied to beam scheduler according radar load status in real-time. The performance of the proposed algorithm was evaluated on the multi-function radar scenario. As a result, we showed that our proposed algorithm can process a lot of beams at the right time with real time capability, compared with applying only rule-based scheduling algorithm. Additionally, we showed that the proposed algorithm can save scheduling time remarkably, compared with applying only SA-based scheduling algorithm.

생산일정계획을 위한 지식 기반 모의실험 (Knowledge Based Simulation for Production Scheduling)

  • 나태영;김승권;김선욱
    • 대한산업공학회지
    • /
    • 제23권1호
    • /
    • pp.197-213
    • /
    • 1997
  • It is not easy to find a good production schedule which can be used in practice. Therefore, production scheduling simulation with a simple dispatching rule or a set of dispatching rules is used. However, a simple dispatching rule may not create a robust schedule, for the same rule is blindly applied to all internal production processes. The presumption is that there might be a specific combination of appropriate rules that can improve the efficiency of a total production system for a certain type of orders. In order to acquire a better set of dispatching rules, simulation is used to examine the performance of various combinations of dispatching rule sets. There are innumerable combination of rule sets. Hence it takes too much computer simulation time to find a robust set of dispatching rule for a specific production system. Therefore, we propose a concept of the knowledge based simulation to circumvent the problem. The knowledge based simulation consists of knowledge bases, an inference engine and a simulator. The knowledge base is made of rule sets that is extracted from both simulation and human intuition obtained by the simulation studies. For a certain type of orders, the proposed system provides several sets of dispatching rules that are expected to generate better results. Then the scheduler tries to find the best by simulating all proposed set of rules with the simulator. The knowledge-based simulator armed with the acquired knowledge has produced improved solutions in terms of time and scheduling performance.

  • PDF

A rule-based scheduling system for automated machining

  • Ahn, Jaekyoung
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1992년도 춘계공동학술대회 발표논문 및 초록집; 울산대학교, 울산; 01월 02일 May 1992
    • /
    • pp.249-257
    • /
    • 1992
  • An automated machining system involves concurrent use of manufacturing resources, alternative process plans, and flexible routings. High investment in the installation of automated facilities requires an efficient scheduling system that is able to allocate the resources specified for operations over a scheduling horizon. The primary emphasis of this paper is to generate schedules that accurately reflect details of the automated environment and the objectives stated for the system. In this paper, a scheduling algorithm for automated machining is presented. Using the previous simulation research for this topic, a rule-based scheduling system is constructed. An architecture for an intelligent scheduling system is proposed, and the system has a high potential to provide efficient schedules based on the task-specific knowledge for the dynamic scheduling environment

  • PDF

FMS 에서의 지능제어형 생산계획을 위한 전문가 시스템 (Expert System for Intelligent Control-Based Job Scheduling in FMS)

  • 정현호;이창훈;서기성;우광방
    • 대한전기학회논문지
    • /
    • 제39권5호
    • /
    • pp.527-537
    • /
    • 1990
  • This paper describes an intelligent control-based job scheduler, named ESIJOBS, for flexible manufacturing system. In order to construct rulebase of this system, traditional rules of job scheduling in FMS are examined and evaluated. This result and the repetitional simulations with graphic monitoring system are used to form the rulebase of ESIJOBS, which is composed of three parts:six part selection rules, four machine center selection rules, and twenty-one metarules. Appropriate scheduling rule sets are selected by this rulebase and manufacturing system status. The performances of all simulations are affected by random breakdowns of major FMS components during each simulation. Six criteria are used to evaluate the performance of each scheduling. The two modes of ESIJOBS are simulated and compared with combinational 24 rule-set simulations. In this comparison ESIJOBS dominated the other rule-set simulations and showed the most excellent performance particularly in three criteria.

전력계통의 단기 발전계획 기원용 전문가시스템 (An Expert System for Short-Term Generation Scheduling of Electric Power Systems)

  • Yu, In-Keun
    • 대한전기학회논문지
    • /
    • 제41권8호
    • /
    • pp.831-840
    • /
    • 1992
  • This paper presents an efficient short-term generation scheduling method using a rule-based expert/consulting system approach to assist electric energy system operators and planners. The expert system approach is applied to improve the Dynamic Programming(DP) based generation scheduling algorithm. In the selection procedure of the feasible combinations of generating units at each stage, automatic consulting on the manipulation of several constraints such as the minimum up time, the minimum down time and the maximum running time constraints of generating units will be performed by the expert/consulting system. In order to maximize the solution feasibility, the aforementioned constraints are controlled by a rule-based expert system, that is, instead of imposing penalty cost to those constraint violated combinations, which sometimes may become the very reason of no existing solution, several constraints will be manipulated within their flexibilities using the rules and facts that are established by domain experts. In this paper, for the purpose of implementing the consulting of several constraints during the dynamic process of generation scheduling, an expert system named STGSCS is developed. As a building tool of the expert system, C Language Integrated Production System(CLIPS) is used. The effectiveness of the proposed algorithm has been demonstrated by applying it to a model electric energy system.

  • PDF

시뮬레이션을 이용한 치과의원의 예약정책과 스케줄링 규칙 평가 (Evaluation of Appointment Policy and Scheduling Rule for a Dental Clinic Based on Computer Simulation)

  • 이종기;김명기;하병현
    • 한국병원경영학회지
    • /
    • 제16권4호
    • /
    • pp.161-182
    • /
    • 2011
  • In today's competitive dental markets, it is of paramount importance to improve service quality and at the same time to use scarce resource efficiently. In this study, we present appointment policies and scheduling rules for private dental clinics to reduce the waiting time of patients and to increase the revenue by utilizing resource more effectively. This study validates the proposed appointment policies and scheduling rules based on simulation models. We show that the bottleneck-based appointment policy is the most effective among appointment policies, followed by the multiple-block appointment one. The shortest processing time among scheduling rules contributes most to the performance of the appointment system.

  • PDF