• Title/Summary/Keyword: rock grouting

Search Result 157, Processing Time 0.028 seconds

Grout Injection Control using AI Methodology (인공지능기법을 활용한 그라우트의 주입제어)

  • Lee Chung-In;Jeong Yun-Young
    • Tunnel and Underground Space
    • /
    • v.14 no.6 s.53
    • /
    • pp.399-410
    • /
    • 2004
  • The utilization of AS(Artificial Intelligence) and Database could be considered as an useful access for the application of underground information from the point of a geotechnical methodology. Its detailed usage has been recently studied in many fields of geo-sciences. In this paper, the target of usage is on controlling the injection of grout which more scientific access is needed in the grouting that has been used a major method in many engineering application. As the proposals for this problem it is suggested the methodology consisting of a fuzzy-neural hybrid system and a database. The database was firstly constructed for parameters dynamically varied according to the conditions of rock mass during the injection of grout. And then the conceptional model for the fuzzy-neural hybrid system was investigated fer optimally finding the controlling range of the grout valve. The investigated model applied to four cases, and it is found that the controlling range of the grout valve was reasonably deduced corresponding to the mechanical phenomena occurred by the injection of grout. Consequently, the algorithm organizing the fuzzy-neural hybrid system and the database as a system can be considered as a tool for controlling the injection condition of grout.

Pullout Characteristics of End Fixed Nails (양단정착형 쏘일네일링의 인발특성)

  • Lee, Bongjik;Kim, Josoon;Lee, Jongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.4
    • /
    • pp.5-11
    • /
    • 2007
  • In this study, several pullout tests were carried out under various field conditions to evaluate the pullout force of the end fixed nails. Pullout resistance force, displacement and friction force between the grouting and nail were measured in end fixed nails installed in soft rock, weathered rock and weathered soil. Furthermore, the field test were also carried out under the same condition using the conventional type nails. Based on the test results, it is concluded that the end fixed nails showed larger ultimate resistance force compared with conventional types nails, approximately two times in weathered soil and 1.6 times of weathered rock, respectively. The skin friction is also increased in end fixed type about 1.8~3.0 times. Finally, it is concluded in the base of the force transfer properties that using the end fixed nails could decrease the displacement and show a uniform resistance in entire length of nails.

  • PDF

Case Study on the Tunnel Collapse at the Shallow Depth (NATM터널 저토피 구간에서의 막장붕락 사례연구)

  • Baek Ki-Hyun;Roh Jong-Ryun;Kim Yong-Il;Cho Sang-Kook;Hwang Nag-Youn
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.102-110
    • /
    • 2005
  • ○ ○ tunnel that is located at Iksan - Jangsu freeway ○ ○, has collapsed during construction at the valley with shallow depth. Although, the site investigations, such as TSP, drilling exploration and so of indicated the presence of discontinuities in this section. The RMR was upgraded and the construction were carried out because that not only actual rock qualities were relatively good during construction but also the tunnel foe was stabilized. However, the tunnel was collapsed at the same time blasting of full face, and surface and underground water was infiltrated due to the settlement of the upper part of the tunnel face. To restore the collapsed section, 3-d tunnel stability analysis was performed and suitable reinforcement methods were chosen. The cavity of the upper tunnel face was stabilized by means of UAM and ALC injection. And the settlement was restored using L.W grouting method.

Stability Analysis on the Substructure of Abutment in Limestone Basin (석회암층 교대 하부 구조물의 안정성 해석)

  • 최성웅;김기석
    • Tunnel and Underground Space
    • /
    • v.12 no.2
    • /
    • pp.120-129
    • /
    • 2002
  • Natural cavitied were found at shallow depth during construction of a huge bridge in Cambro-Ordovician Limestone Basin in the central part or Korea. The distribution patterns of cavities in this area were investigated carefully with a supplementary field job such as a structural geological survey, a geophysical survey, and a rock mechanical test in laboratory or field. A structural geological mapping produced a detail geological map focusing the route of the Proposed highway. It suggested that there were three faults in this wet and these faults had an influence on the mechanism of natural cavities. Among many kinds of geophysical surveys, an electrical resistivity prospecting was applied first on the specific area that was selected by results from the geological survey. Many evidences far cavities were disclosed from this geophysical data. Therefore, a seismic tomography was tested on the target wet which was focused by results from the electrical resistivity Prospecting and was believed to have several large cavities. A distinct element numerical simulation using the UDEC was followed on the target area after completing all of field surveys. Data from field tests were directly dumped or extrapolated to numerical simulations as input data. It was verified from numerical analysis that several natural cavities underneath the foundation of the bridge should be reinforced Based on the project result, finally, most of fecundations far the bridge were re-examined and the cement grouting reinforcement was constructed on several foundations among them.

Analysis of stability control and the adapted ways for building tunnel anchors and a down-passing tunnel

  • Xiaohan Zhou;Xinrong Liu;Yu Xiao;Ninghui Liang;Yangyang Yang;Yafeng Han;Zhongping Yang
    • Geomechanics and Engineering
    • /
    • v.35 no.4
    • /
    • pp.395-409
    • /
    • 2023
  • Long-span suspension bridges have tunnel anchor systems to maintain stable cables. More investigations are required to determine how closely tunnel excavation beneath the tunnel anchor impacts the stability of the tunnel anchor. In order to investigate the impact of the adjacent tunnel's excavation on the stability of the tunnel anchor, a large-span suspension bridge tunnel anchor is utilised as an example in a three-dimensional numerical simulation approach. In order to explore the deformation control mechanism, orthogonal tests are employed to pinpoint the major impacting elements. The construction of an advanced pipe shed, strengthening the primary support. Moreover, according to the findings the grouting reinforcement of the surrounding rock, have a significant control effect on the settlement of the tunnel vault and plug body. However, reducing the lag distance of the secondary lining does not have such big influence. The greatest way to control tunnel vault settling is to use the grout reinforcement, which increases the bearing capacity and strength of the surrounding rock. This greatly minimizes the size of the tunnel excavation disturbance area. Advanced pipe shed can not only increase the surrounding rock's bearing capacity at the pipe shed, but can also prevent the tunnel vault from connecting with the disturbance area at the bottom of the anchorage tunnel, reduce the range of shear failure area outside the anchorage tunnel, and have the best impact on the plug body's settlement control.

Evaluation for Bond between Rock and Grouting (암반과 그라우팅 접촉면의 부착력 평가를 위한 실내 실험)

  • Kim, Young-Uk;Park, Ji-Ho;Cho, Sung-Kuk;Hur, Kab-Soo;Lee, Choong-Ryul;Jeong, Kyeong-Han
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.12a
    • /
    • pp.868-870
    • /
    • 2009
  • 이 연구에서는 암반에 마이크로 파일을 그라우팅하여 시공할 경우에 암반과 그라우트 접촉면에 발생되는 부착력을 특수 제작된 부착력실험용 몰드와 만능시험기를 이용하여 측정하고 그라우팅 방법(압력식, 중력식)을 달리하여 비교 분석하였다. 실험결과 압력식의 부착력과 일축압축강도가 중력식보다 크게 나타났다.

  • PDF

Modes and Causes of Collapse of Subway Tunnels (도심지 지하철 터널의 붕괴유형과 원인)

  • 박광준;이인근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.41-48
    • /
    • 1993
  • The 2nd phase of Seoul Subway, Lines 5,6,7 and 8, is in progress. To reduce the surface traffic congestion during construction the greater part of the system has been engineered by bored tunnelling. The current tunnelling methodology is based on the New Austrian Tunnelling Method. Serveral collapses have been reported to date. Most of the collapses took place in the area forwed with soft ground. The modes and causes of the collapses were progressive failures in the unsupported surface and sliding failures due to the unfavourable joint direction. The major causes turned out to be the weakness of ground and the sudden influx of ground water from the surface. Some measures to prevent the failures are also presented. To ensure the safe tunnelling ghrough the soft ground the unsupported excavation area has to be minimized and closed as early as possible. Additional support measures such as supporting core, sealing shotcrete, forepoling, spread footing, face rock bolting and grouting should be employed as well depend on ground conditions.

  • PDF

PRCG Method to restore settled concrete track and structure (침하된 콘크리트궤도 및 구조물의 복원을 위한 PRCG공법)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Kang, Tae-Ho;Shin, Hak-Yong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.866-871
    • /
    • 2010
  • Various design factors should be considered in order to apply the concrete slab track system on the soil/rock roadbed. One of the important factors is the settlement of roadbed. This settlement of concrete track should be supervised under the allowable settlement limit. If the settlement of roadbed under the concrete track exceed the allowable limit, the train serviceability will considerably come down and furthermore the fatal disaster may happen. Therefore, in this paper we introduced a PRCG(pressurized rapid-hardening cement grouting) method as a settlement restoration method that can be suitably adopted to the concrete slab track.

  • PDF

A case study on the efficiency test of groundwater drainage system for Taejon LNG Pilot Cavern

  • Lee Dae-Hyuck;Lee Chul-Wook;Do Hyo-Lim;Kim Ho-Yeong;Bodin Jean-Luc;Amantini Eric
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.711-715
    • /
    • 2003
  • For Taejon LNG Pilot Cavern being constructed to verify the technical aspects for storing LNG in lined rock cavern, efficiency tests of groundwater drainage system composed of many pumps and boreholes were performed around the cavern before and after the construction of concrete lining. Through evaluation of water balance and monitoring of pressures and flowrates, even if the present drainage system is very good for reducing water entries into the cavern, non-negligible water is still flowing in the floor of the cavern concrete due to heavy rainfall. To improve the drainage efficiency, additional drainage holes and some grouting were planned.

  • PDF

Grouting Effect of Rock Joint (암반절리면에서의 그라우팅 효과)

  • 이영남;천병식;김대영
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2000.10a
    • /
    • pp.265-270
    • /
    • 2000
  • AESTRACI: The shmr behior of sawtoothed artrjicial joints grouted with cement milk rm investiguted in the lahotconstant normal stress conditions. Tests were amducted on joints with asperities h i n g inclinations cf 16.7" and 26.6" ,strengths h i n g 15MPa and 47MPa under a given nmge of n o d stresses wrying frcm 0.76 to 1.g MPa md at a freepitching, rolling and dihtmuy. Results show that the gect of asperities on shmr strength increme is signifamt up to as,to grout thidness (t/a) mtio 4 0.3-1.0. Increme of ahesim is the nmn muse cf shmr strength increme in cemmtoothed artificial iointsed artificial ioints

  • PDF