• Title/Summary/Keyword: rock face

Search Result 321, Processing Time 0.025 seconds

Prediction and Evaluation of Rock Mass Condition by Seismic Profiling Method in Tunnel (터널내 탄성파 탐사를 이용한 전방 지질 예측 및 평가)

  • Lee, Jong-Man;Kwak, Hyun-Joon;Kim, Young-Geun;Baek, Ki-Hyun;Cho, Chul-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.3
    • /
    • pp.45-56
    • /
    • 2001
  • It is very important to survey in construction for acquiring informations about geological structure which influence the tunnel construction. Usually, TSP(Tunnel Seismic Prediction) one of the seismic survey method in tunnels in Korea has been used for prediction of geological condition ahead of tunnel face, but in this study HSP(Horizontal Seismic Profiling) was used. As a result of field application, we predicted that there exist rock discontinuity such as fault, joints and bedding planes. In addition, RMR value from rock mass evaluation coincided with that from seismic survey for rock condition. We compared with rock classifications and evaluation results for proving.

  • PDF

Application of Rockmass Prediction System during tunnel excavation(Sol-An Tunnel) (터널 굴착시 암반예측시스템 적용사례 (솔안터널))

  • 김용일;조상국;양종화;김장수;이내용
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2003.03a
    • /
    • pp.13-30
    • /
    • 2003
  • In this paper, a new systematic method will be introduced, in which a Rock-mass Prediction System(RPS) predicts the geological conditions and rock mass movements before tunnel excavation and the appropriate counter-measures are taken in the expected weak zones during tunnel construction. The Rock-mass Prediction System(RPS) consists of the LIM, a horizontal core drilling and a seismic exploration method(TSP/HSP). In the Rock-mass Prediction System(RPS), the seismic exploration method (TSP/HSP) gives information on the locations of the weak zones such as major faults and voids in wide-range, and the horizontal core drillings are utilized to find exact location and widths of the faults or voids near the weak zones which was predicted by the seismic exploration method (TSP/HSP). The LIM is used to find the hardness of the rock mass and small weak zones near the excavation face. The Rock-mass Prediction System (RPS) was successfully applied to the Sol-An Tunnel and the effectiveness of the system was verified.

  • PDF

Theory and Analysis Method of Tunnel Convergence (터널 내공변위의 이론과 계측결과의 분석)

  • 김호영;박의섭
    • Tunnel and Underground Space
    • /
    • v.3 no.1
    • /
    • pp.80-95
    • /
    • 1993
  • Convergence measurements play very important role in the assessment of stability of a tunnel and of the economics of rock reinforcements. The characteristics of convergences are both due to the face advance effect and the time-dependent behaviour of rocks. As the convergence law can be modeled as a specific function of two variables of distance and time, we can determine the type of function and the related parameters from the field measurements. By using the regression method based on the Levengberg-Marquardt algorithm, an analysis of convergence of two different tunnels and one numerical example is described. It is shown that the convergence can be modeled as following function, C(x)=a{1-exp(-bx)} or C(t)=a{1-exp(-bt)} in case of a tunnel excavated in elastic rocks, in case of elasto-plastic or over stressed rocks.

  • PDF

Analysis of Energy and Ground Vibration of Plasma Blasting (플라즈마 발파의 폭력과 지반진동특성)

  • 이경운;박철환;신중호;류창하
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.267-273
    • /
    • 1997
  • Rock fragmentation with plasma blasting technique has advantageous properties in contrast to the conventional blasting method in controlling of flying rocks and ground vibrations, when residents are complaining or surrounding structures stay in protection from blasting operations. The experiences show in urban construction works that the plasma blasting is the most possible method to prevent damages and minimize adverse environmnetal impacts. The fragmentation energy level is evaluated by numerical simulation using PFC-2D for various drill hole pattern and tested accordingly to get the feasibility. The energy output of plasma blasting system has been improved to a level of 1 MJ, which can break a 2~3 ㎥ granite boulder or 1.5 m height bench face. Measurements are carried out to get the ground vibration level and propagation equation, so that the control of the blasting operations can be performed more precisely and safely.

  • PDF

Estimation of Preceding Displacement at Tunnel Excavation by NATM (NATM 시공에 의한 터널 굴착시 선행변위 추정에 관한 연구)

  • 신동오;임한욱;김치환
    • Tunnel and Underground Space
    • /
    • v.8 no.2
    • /
    • pp.87-95
    • /
    • 1998
  • Field instrumentation and numerical analysis by the finite difference method were applied to estimate the relaxed zone in a subway tunnel of shallow depth in soft rock, excavated by NATM. The convergence and ground displacement can be used to estimate the deformation behavior and the relaxed zone. Parameters for the several models previously suggested were measured using regression analysis techniques adopting a function of time and the face advance. The estimated relaxed zone by the MPBX and FDM analysis were 1.5~3.0 m and 1.5~2.0 m, respectively. It was concluded that the visco-elastic model and the time-dependent elasto-plastic model correlate very well ($r^2$>0.9) with results of the numerical analyses.

  • PDF

A Study of RMR in Tunnel with Risk Factor of Collapse (터널 붕괴 위험도에 따른 RMR 연구)

  • Jang, Hyong-Doo;Yang, Hyung-Sik
    • Tunnel and Underground Space
    • /
    • v.21 no.5
    • /
    • pp.333-340
    • /
    • 2011
  • RMR is most strongly adopted rock classification method to scheme support system in domestic tunnel. However the RMR, which is based on geological survey during design stage of tunnel, can't present the real ground accurately. In this study, authors suggested Weighted-RMR (W-RMR) which is considered weighted value of risk factors of collapse due to prevent collapse and roof falls during tunneling. According to the application of W-RMR to Bye-Gye tunnel, we could change support type flexibly by the risk factors on a face of tunnel.

A Study on the Ground Vibration of the Front and the Back Direction of the Free Face in the Bench Blasting (계단식 발파에 있어서 자유면 전.후방의 지반진동에 관한 연구)

  • 기경철;김일중
    • Explosives and Blasting
    • /
    • v.20 no.2
    • /
    • pp.21-31
    • /
    • 2002
  • We did bench blasting upon the natural rock which it's uniaxial compressive strength was about $1,420~1,476kgf/\textrm{cm}^2$. This is the results we inferred after measuring, analyzing the ground vibration velocity of the front and back direction from the free face of the bench blasting. We have to induce the square and cube root scaled equation and the general equation to guarantee confidence upon the data when analyzing the measurement data of the test blasting. The variable distance is in reverse proportion to the permitted ground vibration velocity. The shorter is the exploding point to a protection structure, the bigger is the reflection that the direction of the free face experts the ground vibration velocity, The ground vibration velocity front of the free face tends become reduced about 38~46% compare with back of the free face in the range that the permitted ground vibration velocity is 2.0~5.0mm/sec. In case of 2.0mm/sec, when a protection structure is within about 95m, the max. allowable charge weight per delay on positing front of the free face can be more used about 2.61 times than that on positing back of the free face, in case of 3.0mm/sec within about 78m more about 2.38 times, in case of 5.0mm/sec within 60m more about 2.10 times. In case of 2.0~5.0mm/sec when a protection structure is within about 200m front from the free face, the max. allowable charge weight per delay can become about 1.52 times than the case on back to the free face.

Probabilistic analysis for face stability of tunnels in Hoek-Brown media

  • Li, T.Z.;Yang, X.L.
    • Geomechanics and Engineering
    • /
    • v.18 no.6
    • /
    • pp.595-603
    • /
    • 2019
  • A modified model combining Kriging and Monte Carlo method (MC) is proposed for probabilistic estimation of tunnel face stability in this paper. In the model, a novel uniform design is adopted to train the Kriging, instead of the existing active learning function. It has advantage of avoiding addition of new training points iteratively, and greatly saves the computational time in model training. The kinematic approach of limit analysis is employed to define the deterministic computational model of face failure, in which the Hoek-Brown failure criterion is introduced to account for the nonlinear behaviors of rock mass. The trained Kriging is used as a surrogate model to perform MC with dramatic reduction of calls to actual limit state function. The parameters in Hoek-Brown failure criterion are considered as random variables in the analysis. The failure probability is estimated by direct MC to test the accuracy and efficiency of the proposed probabilistic model. The influences of uncertainty level, correlation relationship and distribution type of random variables are further discussed using the proposed approach. In summary, the probabilistic model is an accurate and economical alternative to perform probabilistic stability analysis of tunnel face excavated in spatially random Hoek- Brown media.

A Study on Setup for Preliminary Decision Criterion of Continuum Rock Mass Slope with Fair to Good Rating (양호한 연속체 암반사면의 예비 판정기준 설정 연구)

  • Kim, Hyung-Min;Lee, Su-gon;Lee, Byok-Kyu;Woo, Jae-Gyung
    • The Journal of Engineering Geology
    • /
    • v.29 no.2
    • /
    • pp.85-97
    • /
    • 2019
  • It can be observed that steep slopes ($65^{\circ}$ to $80^{\circ}$) consist of rock masses were kept stable for a long time. In rock-mass slopes with similar ground condition, steeper slopes than 1 : 0.5 ($63^{\circ}$) may be applied if the discontinuities of rock-mass slope are distributed in a direction favorable to the stability of the slope. In making a decision the angle of the slope, if the preliminary rock mass conditions applicable to steep slope are quantitatively setup, they may be used as guidance in design practice. In this study, the above rock mass was defined as a good continuum rock mass and the quantitative setup criterion range was proposed using RMR, SMR and GSI classifications for the purpose of providing engineering standard for good continuum rock mass conditions. The methods of study are as follows. The stable slope at steep slopes ($65^{\circ}$ to $80^{\circ}$) for each rock type was selected as the study area, and RMR, SMR and GSI were classified to reflect the face mapping results. The results were reviewed by applying the calculated shear strength to the stable analysis of the current state of rock mass slope using the Hoek-Brown failure criterion. It is intended to verify the validity of the preliminary criterion as a rock mass condition that remains stable on a steep slope. Based on the analysis and review by the above research method, it was analyzed that a good continuum rock mass slope can be set to Basic RMR ${\geq}50$ (45 in sedimentary rock), GSI and SMR ${\geq}45$. The safety factor of the LEM is between Fs = 14.08 and 67.50 (average 32.9), and the displacement of the FEM is 0.13 to 0.64 mm (average 0.27 mm). This can be seen as a result of quantitative representation and verification of the stability of a good continuum rock mass slope that has been maintained stable for a long period of time with steep slopes ($65^{\circ}$ to $80^{\circ}$). The setup guideline for a good continuum rock mass slope will be able to establish a more detailed setup standard when the data are accumulated, and it is also a further study project. If stable even on steep slopes of 1 : 0.1 to 0.3, the upper limit of steep slopes is 1 : 0.3 with reference to the overseas design standards and report, thus giving the benefit of ensuring economic and eco-friendlyness. Also, the development of excavation technology and plantation technology and various eco-friendly slope design techniques will help overcome psychological anxiety and rapid weathering and relaxation due to steep slope construction.

A Study on Determination of the Optimum Round Length for Weak Rock Tunnel (연암터널의 최적 굴진장 결정에 관한 연구)

  • Lee, Young-Zoo;Kim, Chang-Yong;Kim, Kwang-Yeom;Lee, Sung-Won;Schubert, Wulf
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.3
    • /
    • pp.219-225
    • /
    • 2006
  • Although the round length for tunnel excavation has a major technical and economical impact in conventional tunnelling, there is no coherent procedure available for its determination. In this study, the influence of round length on the behaviour modes of weak rock tunnel was investigated by numerical analyses. Quantitative estimation of the behaviour modes of the face and the unsupported span was established by use of the safety factor for the face stability and the conditional chart. In addition, the optimum round length in the tunnel design stage was investigated based on the detail construction information such as cycle time and material costs. Although this proposed method has some restrictions, it is expected to provide useful information for the optimization of the tunnel excavation, especially in design stage.