• 제목/요약/키워드: road construction

검색결과 2,071건 처리시간 0.029초

도로품질 향상을 위한 야간 도로공사 시간확대의 영향분석 (Effects of Extending Duration of Nighttime Road Construction)

  • 이동민;최준성;박제진;박용진
    • 한국도로학회논문집
    • /
    • 제19권5호
    • /
    • pp.153-162
    • /
    • 2017
  • PURPOSES : This study was conducted to analyze the effects arising from extending the duration of nighttime road construction on improving road quality and durability. METHODS : Most previous studies estimating the social cost of various construction conditions did not consider road pavement cooling time as a factor in improving road pavement quality. This study investigated the feasibility of achieving higher road quality and durability by extending the duration of nighttime road construction time extension. For this investigation, the effects of such an extension on traffic conditions were analyzed based on micro-simulation studies and scenario-based cost-benefit analyses, using factors including traffic volume, delay, construction cost, and road pavement cooling time. RESULTS : The results of the traffic simulation studies and cost-benefit analyses indicate that the current road construction method that emphasizes completing nighttime road construction by 6 a.m. reduces pavement life while causing relatively little traffic delay. If the night construction time is instead extended to 2 p.m., road pavement lifetime is increased, reducing road re-construction cost. These savings are greater than the cost of congestion arising from extending the duration of nighttime construction. CONCLUSIONS : The current nighttime construction durations need to be extended in order to efficiently manage roads and reduce road management costs.

공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구 (A Study on Development of Remote Site Monitoring System in Public Road Construction Projects)

  • 옥현
    • 한국도로학회논문집
    • /
    • 제14권6호
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

A Study on the Variation of Ground Safety Factor by Earthworks

  • Kim, Jinhwan;Kwon, O-Il;Baek, Yong;Kim, Chang-Yong
    • 지질공학
    • /
    • 제24권3호
    • /
    • pp.333-341
    • /
    • 2014
  • The construction of roads, tunnels, and bridges results in changes to the local terrain that may influence the ground safety factor, which represents the stability of geotechnical structures. In this study, we assessed construction sites that had collapsed as a result of terrain change, and then simulated variation in the ground safety factor with respect to terrain change caused by road construction. We assumed steep slopes to simulate changes in terrain in a mountainous area and assumed that earthworks took place for road construction by cutting a platform into the slope and altering the slope angle of the terrain both above and below the road. We calculated values of the ground safety factor through a stability analysis of the slope both above and below the road, and examined the variation in the safety factor of the above- and below-road slopes with respect to changes in road width. We found that if the slope angle was the same above and below the road, then the change in the ground safety factor during/after road construction occurred in the slope below the road, and if the slope angle above the road differed from that below, then the change occurred in both the above- and below-road slopes. Furthermore, the ground safety factor was essentially constant for road widths exceeding 2-6 m, depending on both above- and below-road slope angle. The findings of this study can be used to guide the management of construction sites and to assess changes in ground stability during road construction work, particularly in the early stages of earthworks, when the road width is narrow.

도로건설 현장에서의 드론 운용방안 (Drone Operation Plan at Road Construction Site)

  • 성상민;윤부열;송미화;조준상
    • 한국산업융합학회 논문집
    • /
    • 제23권5호
    • /
    • pp.709-716
    • /
    • 2020
  • Recently, the drone's equipment development and software technology have dramatically improved. With such developments, the applicability is increasing in various fields that require rapid geospatial information, and in practice, regulations and systems have been established, and the fields in use are increasing. Also, in Korea, corporations and public institutions are actually using and researching drones in fields such as aircraft development, communication technology development, construction site use, and surveying. However, there are no fields where drones are actually used in road construction sites. Therefore, in this study, to utilize drones that have been actively used in the civil engineering and construction fields for road construction, we investigated the current status of the Korea Highway Corporation's field drone use research and classified the possibility of drone introduction by road construction. Finally, a method of using drones at road construction sites was proposed to prepare a method for using drones at road construction sites.

Construction Workers' Sensation-Seeking and Inattentiveness to Warning Alarms from Construction Vehicles

  • Kim, Namgyun;Gregoire, Laurent;Anderson, Brian A.;Ahn, Changbum R.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.261-268
    • /
    • 2022
  • In road work zones, pedestrian workers' habituated inattention to warning alarms from construction vehicles can lead to fatal accidents. Previous studies have theorized that human factors such as personality traits may affect workers' inattentiveness to workplace hazards. However, there has been no study that directly examined how road construction workers' personality traits affect their attention to warning alarms within a work zone and the likelihood of engagement in a struck-by accident. This study examines how workers' sensation-seeking (especially boredom susceptibility) is related to inattention to warning alarms while performing a task in road work zones. An experiment with actual road construction workers was conducted using a virtual road construction environment. Workers' attention to repeatedly presented warning alarms was measured using eye-tracking sensors. In response to workers' frequent inattentive behaviors, a virtual accident was simulated. Results revealed a significant association between boredom susceptibility and workers' engagement in the virtual accident, a consequence of inattentiveness to warning alarms. The findings suggest that workers' personality traits predispose them to tune out warning alarms and become vulnerable to accidents in road work zones. The findings of this study can be used to develop targeted interventions aimed at preventing workers' inattention to repeatedly exposed workplace hazards, thereby contributing to reducing fatal accidents in road work zones.

  • PDF

한국의 도로분야 기술수준 분석에 관한 연구 (A Study on the Technology Level Assessment of Road Construction in Korea)

  • 김경훈;이두헌
    • 한국건설관리학회논문집
    • /
    • 제16권4호
    • /
    • pp.129-138
    • /
    • 2015
  • 본 연구에서는 건설산업에 있어서 파급효과가 높은 도로시설물을 선정하여, 세부적인 기술수준 분석을 실시하고, 향후 해외 진출을 위한 중점추진분야를 도출하였다. 분석결과, 한국의 도로시설물에 대한 기술수준은 도로 운영 및 관리기술 부문에 대한 기술수준이 높은 반면, 도로포장기술 부문은 상대적으로 낮은 기술수준을 보유한 것으로 나타났다. 그리고 본 연구에서는 경제적, 사회적, 기술적 중요도를 분석하여 투자효율이 높을 것으로 판단되는 중점 추진 분야를 도출하였으며, 도출된 항목으로는 "무보수 모듈러 도로포장 기술"과 "도시 온도저감형 도로 기술"로 나타났다.

FACTORS AFFECTING THE SUCCESS/FAILURE OF ROAD INFRASTRUCTURE PROJECTS UNDER PPP IN INDIA

  • Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권4호
    • /
    • pp.1-12
    • /
    • 2017
  • India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.

캄보디아 시엠립 우회도로건설 사업 소개 (Introduction on the by-pass road construction for Siem Reap, Cambodia)

  • 노한성;김효배
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.614-625
    • /
    • 2008
  • The project of Construction of Siem Reap bypass road in Cambodia consists of alignment improvement of existing route, extension of width of road and laterite paving. This project is carried out by fast-track method on the design and construction for bypass road of 15.2 km length and 8m width for five months. Though some difficulties for the construction works such as the location of borrow pit and rock source, rainy seasons etc, the construction could be completed successfully owing to the cooperation of related authorities, company and residents. This 2 way Angkor detouring road will function as industrial roads in Siemreap region. These new two roads will not only bring better logistics requirements and safety, but also impact to poverty alleviation and preservation the beauty of the ecological environment of Angkor region. The basic information related to geotechnical engineering of this project is introduced.

  • PDF

측량 분야의 리스크 식별을 위한 리스크 체크리스트 개발 -도로 공사를 중심으로- (A Study on the Development of Risk Check List and Identification of Risk Factors for Survey in Road Construction)

  • 곽준환;박형근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.901-904
    • /
    • 2008
  • 측량은 건설 공사 전반에 수행되고 있기 때문에 측량이 건설 공사에 미치는 영향은 매우 크다고 할 수 있다. 그러나 측량의 리스크 식별 및 관리에 관한 연구는 다른 분야에 비해 미비하다. 따라서 본 연구에서는 건설 공사의 시공 시 수행되는 측량에 관한 효율적인 리스크 관리를 목적으로 건설 공사 중 도로 공사에 수행되는 측량을 대상으로 리스크 관리에 관한 연구를 수행하였다. 일반적으로 리스크 관리는 리스크 식별, 분석, 대응의 3단계로 수행되지만, 본 연구에서는 리스크 식별 및 분석 단계에 초점을 맞추어 도로 공사의 측량 리스크 체크리스트 작성을 위한 연구를 수행하였다. 리스크 인자의 식별에는 도로 공사 시방서, 측량법, 도로 공사 체크리스트를 사용하였으며, 식별된 리스크를 바탕으로 도로 공사의 측량 관련 체크리스트를 작성하였다. 작성될 체크리스트는 측량 관련 전문가 집단의 면담 조사를 통하여 중요도를 분석하여 측량 리스크 체크리스트를 작성하였다.

  • PDF

IMPROVEMENT OF CONSTRUCTION CIVIL AFFAIRS ADMINISTRATION SYSTEM(CCAS) : FOCUSING ON ADMINISTRATION FOR ROAD OCCUPATION PERMIT

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1177-1180
    • /
    • 2005
  • The Ministry of Construction & Transportation(MOCT) in Korea handles electronically 38 kinds of approval and permit operations under the Construction Civil Affairs Administration System(CCAS) so that applicants may apply for construction permits with ease and concerned public offices may process effectively civil applications. In particular, road occupation permit operations have several problems to be improved. This study is aimed to improve the CCAS in terms of simplification of application receipt, issuance of online permit, auto calculation of road occupation fee, and auto issuance of payment notice.

  • PDF