• Title/Summary/Keyword: river width

Search Result 288, Processing Time 0.029 seconds

Classification of Riparian Riffles and Their Physical and Hydraulic Characteristics (하천 여울의 분류 및 물리, 수리학적 특성 분석)

  • Kim, Seong Whan;Yang, Jeon Young;Kim, Jin Hong
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.2
    • /
    • pp.137-147
    • /
    • 2015
  • This study performed the systematic classification of the various types of riffles and analyzed their physical and hydraulic characteristics at the Hongcheon River and Seomjin River. The riffles are classified into the long type and the wide type by their ratio of length and width, and also classified into the convergent type and the divergent type by their width change along flow direction. They are also classified into the falling type, the running type, the undular wave and the undular jump by their surface profiles. The falling type and the running type usually occur near the cobbles with multiple diameters, whereas the undular wave and the undular jump occur near the small pebbles. They showed the upward convex type at the middle part, and the slope gets bigger at the downstream part.

The Annual and Seasonal Changes of Lorica Morphology in Keratella. (거북등윤충 (Keratella) 피갑 형태의 연도 및 계절별 변화)

  • La, Geung-Hwan;Choe, Ji-Min;Kim, Hyun-Woo
    • Korean Journal of Ecology and Environment
    • /
    • v.42 no.2
    • /
    • pp.253-259
    • /
    • 2009
  • We investigated annual and seasonal changes of Keratella spp. among rotifer community in the lower part of the Nakdong River (Mulgum) for four years (1995, 1997, 2005, 2007). As well, the annual and seasonal variations of lorica morphologies including sizes, posterior and anterior spines lengths in K. cochlearis were analyzed. The density of Keratella spp. showed distinct seasonality such as spring peak and winter scarcity. K. cochlearis was the most dominant species within Keratella spp. and the relative abundances of 2005 and 2007 were higher than 1995 and 1997. The lorica length and width of K. cochlearis did not show the annual changes between four years however, there was an obvious width decrease in summer and increase in winter. The proportion of individuals that has the posterior spine was relatively low throughout four years, especially at summer and autumn. K. cochlearis displayed short posterior spine in summer and long posterior spine in winter contrary to the anterior median and intermediate spines.

Analysis of the Changes of the Vegetated Area in an Unregulated River and Their Underlying Causes: A Case Study on the Naeseong Stream

  • Lee, Chanjoo;Kim, Donggu
    • Ecology and Resilient Infrastructure
    • /
    • v.5 no.4
    • /
    • pp.229-245
    • /
    • 2018
  • This study aims to investigate the changes in the riparian vegetated area in the Naeseong stream, an unregulated river, in order to analyze the main factors leading to these changes. For this purpose, the land surface cover in the channel area of the Naeseong stream was classified into 9 categories using past aerial photographs collected between 1970 and 2016, which recorded the long-term changes of the Naeseong stream. The increase or decrease in the vegetated area was calculated for each category using a pair of before and after images. The changes in the vegetated area were divided into 6 periods: the unvegetated channel period (1970 - 1980), the first rapid increase (1980 - 1986), the period of decrease due to flood (1986 - 1988), the period of repetitive man-induced disturbance and vegetation increase (1988 - 2008), the period of gradual vegetation increase (2008 - 2013), and the period of second rapid increase (2013 - 2016). Multiple regression analysis was performed using independent variables representing hydrology, climate, and geomorphology. The major variables found to be involved in the changes in the vegetated area of the Naeseong stream were the discharge during June - July, channel width, and temperature during April - June. Among the three variables, discharge and temperature were respectively the main independent variables in the downstream and the upstream reaches as per a single variable model. Channel width was the variable that distinguished the upstream and downstream reaches of the stream. The implication of the long-term increase in the vegetated area in the Naeseong stream was discussed based on the result of this study.

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Analysis for the Effect of Channel Contraction for Sedimentation Reduction on the Flood Level and Bed Changes in the Lower Nakdong River (낙동강 하류의 퇴사저감을 위한 하폭축소방법이 홍수위변화 및 하상변동에 미치는 영향 분석)

  • Jang, Eun-Kyung;Ji, Un
    • Journal of Environmental Science International
    • /
    • v.22 no.3
    • /
    • pp.291-301
    • /
    • 2013
  • Sediment from the upstream channel has been deposited near the Nakdong River Estuary Barrage (NREB) due to the mild slope and decreased velocity. The annual mechanical dredging to ensure the flood capacity has been performed to remove the deposited sediment. However, the dredging method is not considered as an effective countermeasure due to high cost and long time to operate. Therefore, many methods for sedimentation reduction have been proposed for NREB. Especially, the channel contraction method to mitigate sedimentation problem by changing the channel geometry from 2 km to 3 km upstream of NREB has been recently suggested as an effective countermeasure. However, there is the possibility that the channel contraction method induces flood level increase compared to original condition. Therefore, it is necessary to investigate quantitatively the flood level changes in the upstream and downstream section due to the channel contraction method for NREB. In this study, water level changes by 10% channel contraction of whole width has been evaluated using the HEC-RAS model and simulated with and without channel contraction for various flood discharge. As a result, water level in the section where the channel was contracted was decreased by 0.02 m and flood level at the upstream of channel contracted was increased up to 0.015 m for the 500-year flood.

Application of a One-Dimensional Upwind Model for Natural Rivers (일차원 상류이송형모형의 자연하도에 대한 적용)

  • Kim, Won;Han,, Kun-Yeun;Woo, Hyo-Seop
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.5 s.154
    • /
    • pp.333-343
    • /
    • 2005
  • The upwind model is well known to simulate shockwaves, but it is rarely applied to natural rivers because of problems caused by the source terms. Although several methods have been developed to deal with the source terms, none of them has been applied to natural rivers. This paper deals with application of the upwind model to the natural river. An implicit upwind model is applied to a hypothetical irregular channel and a natural river with highly irregular bed, width, and hydraulic structures. Different types of the flows including steady-state flow, flood wave, dam-break wave, and bore are simulated to test accuracy and applicability of the implicit upwind model. It is proved that the model can simulate various types of flows in natural rivers with high accuracy and robustness.

Assessment of Levee Slope Reinforced with Bio-polymer by Image Analysis (영상분석을 통한 바이오폴리머로 보강된 제방사면 안정성 해석)

  • Ko, Dongwoo;Kang, Joongu
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.4
    • /
    • pp.258-266
    • /
    • 2019
  • This study was conducted to apply natural river technologies to levees and examine the results. The new eco-friendly bio-polymer was applied, a combination of eco-friendly biopolymers and soil, to levee slope to enhance durability and eco-friendliness and to establish reinforcement measures against unstable levees due to overtopping. A semi-prototype levee of 1 m in height, 3 m in width, with a 1:2 slope and 5 m length, was constructed at the Andong River Experiment Center. The bio-soil mixed with the biopolymer and the soil at an appropriate ratio was treated with a 5 cm thickness on the surface of levee to perform the stability evaluation according to overtopping. Using the pixel-based analysis technique using the image analysis program, the breached area of levee slope was calculated over time. As a result, the time for complete decay occurs more than 12 times than that of ordinary soil levee. Therefore, when the new substance is applied to the surface of levee, the decay delay effect appears to be high.

Experimental Study on the Inflow and Outflow Structures of Hwasun Flood Control Reservoir (화순 홍수조절지의 유입유출 구조물에 대한 수리모형실험 연구)

  • Lee, Sang-Hwa;Jin, Kwang-Ho;Ryu, Jong-Hyun;Kim, Soo-Geun
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.7
    • /
    • pp.675-684
    • /
    • 2012
  • Recently, a heavy rainfall under climate change causes the flood exceeded river's conveyance. Flood control methods under the limited river width are the increase of embankment, the construction of storage pockets and diversion channel, the dredging of river bed. Hwasun flood control reservoir of washland is designed as the storage pockets and the regulating gate for the control of water level. In this study, the propriety of design was investigated through hydraulic experiments for the circumstances to exclude the constant flood discharge during operation period. In the results, the over flow rate of side weir exceeded the flow of design and indicated to be able to discharge the designed flow in the regulating gate opened 1.1 m. The high velocity 7.1 m/s behind the gate has investigated to reduce under 3.3 m/s by the baffle block.

Numerical Analysis for Integrity Evaluation of River Bank (하천제방의 건전도 평가를 위한 수치해석적 연구)

  • Jung, Hyuksang;Byun, Yoseph;Chun, Byungsik;Choi, Bonghyuck;Kim, Jinman
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.11
    • /
    • pp.19-26
    • /
    • 2010
  • An influence factors for soundness evaluation of river levee include consisting embankment in case piping, permeability coefficient of ground, height of embankment, the width of crest, material characteristics of embankment and foundation ground, shape of embankment slope, an influence for penetration of rainfall or river water in case slope stability. In this study, it was operated a feasibility investigation of existing design result, stability evaluation for permeability coefficient use and permeability coefficient change of foundation ground to investigate an influence in line with permeability coefficient change for result of river levee penetration analysis. The evaluation results of influence factors, the permeability coefficient was used in design and it was evaluated influence in safety factor of piping. After the evaluation of influence factors, the permeability coefficient used in the design appears with the fact that differs in a design report about same soil.

Channel Changes and Effect of Flow Pulses on Hydraulic Geometry Downstream of the Hapcheon Dam (합천댐 하류 하천지형 변화 예측 및 흐름파가 수리기하 변화에 미치는 영향)

  • Shin, Young-Ho;Julien, Pierre Y.
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.7
    • /
    • pp.579-589
    • /
    • 2009
  • Hwang River in South Korea, has experienced channel adjustments due to dam construction. Hapcheon main dam and re-regulation dam. The reach below the re-regulation dam (45 km long) changed in flow regime, channel width, bed material distribution, vegetation expansion, and island formation after dam construction. The re-regulation dam dramatically reduced annual peak flow from 654.7 $m^3$/s to 126.3 $m^3$/s and trapped the annual 591 thousand $m^3$ of sediment load formerly delivered from the upper watershed since the completion of the dam in 1989. An analysis of a time series of aerial photographs taken in 1982, 1993, and 2004 showed that non-vegetated active channel width narrowed an average of 152 m (47% of 1982) and non-vegetated active channel area decreased an average of 6.6 km2 (44% of 1982) between 1982 and 2004, with most narrowing and decreasing occurring after dam construction. The effects of daily pulses of water from peak hydropower generation and sudden sluice gate operations are investigated downstream of Hapcheon Dam in South Korea. The study reach is 45 km long from the Hapcheon re-regulation Dam to the confluence with the Nakdong River. An analysis of a time series of aerial photographs taken in 1982, 1993, and 2004 showed that the non-vegetated active channel width narrowed an average of 152 m (47% reduction since 1982). The non-vegetated active channel area also decreased an average of 6.6 $km^2$ (44% reduction since 1982) between 1982 and 2004, with most changes occurring after dam construction. The average median bed material size increased from 1.07 mm in 1983 to 5.72 mm in 2003, and the bed slope of the reach decreased from 0.000943 in 1983 to 0.000847 in 2003. The riverbed vertical degradation is approximately 2.6 m for a distance of 20 km below the re-regulation dam. It is expected from the result of the unsteady sediment transport numerical model (GSTAR-1D) steady simulations that the thalweg elevation will reach a stable condition around 2020. The model also confirms the theoretical prediction that sediment transport rates from daily pulses and flood peaks are 21 % and 15 % higher than their respective averages.