Park, Beom-Suk;Jin, Run-Zhi;Han, Sangwon;Hyun, Chang-Taek
Proceedings of the Korean Institute of Building Construction Conference
/
2013.05a
/
pp.192-193
/
2013
In recent years, risks associated with mixed used development in urban regeneration projects which have actively been implemented have been on the rise due to uncertainties and complexities of those projects. Thus, risk management is needed to effectively manage those risks that may occur during the process of a project. Many studies have contributed to deal with risk management of those projects. These studies, however, have focused main on identification stage and deriving the main risk factors and have limitations on presenting the relationship among those risk factors. Since many risks are interdependent and have multiple effects, the purpose of this study is to present a way(ISM method) to provide a hierarchical structural framework of risks in Urban Regeneration. The structural of risks can helps decision makers to trace the actual source of these risks.
The marine cargo insurance compensates the cargo losses that happened during navigation . at the early days of the marine insurance, the insurer inclusively covered all risks that happended during navigation. But since the feature of the risks have been changed due to the development of the shipbuilding technique and commerce, the insurer could not bear all of the perils inclusively. So, the insurer have taken the limitation of the risks insured and the losses paid by exclusion clauses. Therefore, the purpose ;of this paper is to compare the exclusion clauses in the new Institute Cargo Clause (hereafter I.C.C.) with those in the former I.C.C.(all risks, F.P.A) and to make clear the scope of insurer's liability through the theoretical interpretation, clarification of various excluded risks in laws and clauses relating to marine cargo insurance. From what 1 mentioned above, 1 conclude that through continued study on the exclusion sin the new I.C.C., we should organize and establish a system which will satisfy both underwriters and the assured in making the application and the effectiveness equal for each party.
Journal of the Korea Society of Computer and Information
/
v.24
no.3
/
pp.1-9
/
2019
This paper presents three potential risks in an environment that simultaneously performs the garbage collection and wear leveling in NAND flash memory. These risks may not only disturb the lifespan improvement of NAND flash memory, but also impose an additional overhead of page migrations. In this paper, we analyze the interference of garbage collection and wear leveling and we also provide two theoretical considerations for lifespan prolongation of NAND flash memory. To prove two solutions of three risks, we construct a simulation, based on DiskSim 4.0 and confirm realistic impacts of three risks in NAND flash memory. In experimental results, we found negative impacts of three risks and confirmed the necessity for a coordinator module between garbage collection and wear leveling for reducing the overhead and prolonging the lifespan of NAND flash memory.
In general, companies operate systematically in response to financial risks such as exchange rates and liquidity, while they are vulnerable to risks in the manufacturing and sales processes. In particular, logistics refers to the activities for planning, managing and implementing efficient flows from the starting point of goods and products to the point of consumption, The purpose of this study was to develop key risks and key risk management indicators (KRIs) for risks that undermine logistics efficiency so that logistics risks can be effectively prevented and managed. As a result, 40 risk management indicators (KRIs) were developed in a total of six categories in the logistics sector, and the definition, calculation method and early warning grade of each KRI were presented so that companies could prevent risks in advance in logistics activities and contribute to enhancing efficiency of their work.
According to the commercial law in Korea, a marine cargo insurance contractor (policyholder, insured person, agent) has the duty to disclose risks before establishing an insurance contract and the obligation to notify changes in risks after before establishing the contract. Marine cargo insurance policy clauses include one about the obligation to notify changes in risks. This clause assumes that an insurance contract should be implemented according to what has been answered to the important questions asked by the insurer in connection with the insurant's duty to disclose before establishing an insurance contract, and it stipulates that, if any change in what has been disclosed should be notified to the insurer since it is regarded as a change in risks. Neglecting the obligation to notify may lead to the termination of the appropriate insurance contract by the insurer. The problems here concern the clauses about changes in risks and about the obligation to notify. The problems are like these. Can it be that the circumstances which might be seen in the past as changes in risks according to the territorial sea laws and institute cargo clauses stipulated long ago are considered as such still today? And a marine cargo insurance policy till valid when changes in risks have not been properly notified by the original discloser of risks to the insured who currently holds the marine cargo insurance policy, which, unlike other insurance policies, is a marketable security? In Korea, the commercial law has a clause the obligation to notify changes in risks established based on the territorial sea laws and institute cargo clauses. In this regard, this study aims to consider if the clause still valid today or not and, if not, to propose alternatives to the clauses.
International Journal of Computer Science & Network Security
/
v.22
no.1
/
pp.69-76
/
2022
At the current stage of globalization and European integration of Ukraine, the aspects related to the effective fight against corruption in the system of economic security of our country are receiving more and more attention, as they become a prerequisite for continuing reforms based on international funding. In order to consider this issue and solve this problem, the necessary step is to develop and implement real mechanisms of the system for detecting and preventing corrupt behavior, which are based on international anti-corruption standards. The leading component of this system is the management of corruption risks in the system of economic security in order to identify them and implement measures to reduce them. This study analyzes the corruption perception index in Ukraine in recent years, which showed a positive, albeit somewhat slow dynamics of its growth, indicating a gradual increase in overcoming corruption through the introduction of a number of anti-corruption measures and changes. It is proved that the current stage of socio-economic development of the country contributes to strengthening the processes of combating corruption and preventing corruption risks, creating an effective and efficient anti-corruption system of the state. The concept of "corruption" was studied, it was found that in the field of public administration it is considered from different positions and is closely related to the concept of "corruption risks". The essence and features of corruption risks are studied, the preconditions of their occurrence are formulated, the relationship between the causes of corruption risks and economic security in the field of public authority has been established. The system of corruption risk management is considered and its components are characterized. It is proposed to increase the effectiveness of anticorruption policy through the implementation of measures aimed at investigating the causes of corruption risks, as well as developed effective and effective means of reducing corruption risks within the system of economic security
Journal of Construction Engineering and Project Management
/
v.4
no.1
/
pp.29-36
/
2014
Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.
Proceedings of the Korea Society for Industrial Systems Conference
/
2008.10b
/
pp.365-384
/
2008
Many studies on ASP outsourcing area have focused on the Critical Success Factors(CSFs) of ASP outsourcing projects or on the service quality of ASP Service. But these studies have limitations to explain how to succeed in doing ASP outsourcing project. The objective of this research is to overcome this limitation by using the concept of "IT Risk" in Outsourcing. The effective control of the risks-caused during the IS outsourcing process-gives (ASP service using) users a powerful tool to minimize the risks and thus maximizes the possibility of ASP outsourcing project success. In order to perform this objective, this research set up the research model which is composed of three concepts. The three concepts are 1. Undesirable Outcomes(:UO) as IT outsourcing Risks, 2. The Source of Risks(:SOR) influencing the UO, and 3. the intention to get/execute Real Option Portfolio to control the risk level of SORs and UOs. This research has some important and interesting implications on the ASP outsourcing area. First, this research classifies the risk factors as three concepts and finds the interactions among them. Second, Using Real Option portfolio can control the risks effectively occurred during outsourcing projects. Third, Vendors(ASP service providers) can offer users IN TIME the options which can minimize the occurrence of risks.
Purpose: The purpose of this study is to point out that the Kaplan-Meier method is not valid to calculate the survival probability or failure probability (risk) in the presence of competing risks and to introduce more valid method of cumulative incidence function. Methods: Survival analysis methods have been widely used in biostatistics division. However the same methods have not been utilized in reliability division. Especially competing risks cases, where several causes of failure occur and the occurrence of one event precludes the occurrence of the other events, are scattered in reliability field. But they are not noticed in the realm of reliability expertism or they are analysed in the wrong way. Specifically Kaplan-Meier method which assumes that the censoring times and failure times are independent is used to calculate the probability of failure in the presence of competing risks, thereby overestimating the real probability of failure. Hence, cumulative incidence function is introduced and sample competing risks data are analysed using cumulative incidence function and some graphs. Finally comparison of cumulative incidence functions and regression type analysis are mentioned briefly. Results: Cumulative incidence function is used to calculate the survival probability or failure probability (risk) in the presence of competing risks and some useful graphs depicting the failure trend over the lifetime are introduced. Conclusion: This paper shows that Kaplan-Meier method is not appropriate for the evaluation of survival or failure over the course of lifetime. In stead, cumulative incidence function is shown to be useful. Some graphs using the cumulative incidence functions are also shown to be informative.
The Journal of Asian Finance, Economics and Business
/
v.9
no.1
/
pp.373-385
/
2022
Due to the lack of information, medical tourists are regarded to be at high risk. Prior medical tourism research has found that various types of perceived risks have a significant impact on medical tourists' purchase behavior. Even though medical tourism is predicted to increase, there is a lack of behavioral research to explain how perceived risks affect medical tourists' purchase behavior. In the context of Korean medical tourism, this study attempts to evaluate the effects of multi-level (macro, organizational, and personal) factors on medical tourists' perceived risks and purchase intentions. A conceptual model and hypotheses were built and empirically validated to investigate links between multi-level characteristics, perceived risks, and purchasing intentions. The data for this study was collected from Chinese tourists using a questionnaire. The impact of cognitive country image, affective country image, and medical service quality on fundamental risk is confirmed by statistical testing. Surprisingly, expectancy discrepancy risk is influenced only by cognitive country image and information search capabilities. Both fundamental and expectation discrepancy risks lower medical tourists' purchase intentions. The findings of this study show that a multi-level strategy is required to investigate the links between perceived risks and medical tourism purchasing intentions based on macro, organizational, and personal factors.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.