• 제목/요약/키워드: risk process

검색결과 2,871건 처리시간 0.023초

의사결정기법을 통한 건축공법선정에 관한 연구 (A Study on the Selection of Construction Method by Decision Making Method)

  • 양극영;윤여완
    • 한국건축시공학회지
    • /
    • 제2권1호
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

리스크 분석을 통한 지하 구조체 공법 선정에 관한 연구 (A Study on the Selection of Underground Construction Method by Risk Analysis)

  • 윤여완;양극영;홍성휘
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.99-117
    • /
    • 2001
  • In the past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of Underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need rely careful process. The purpose of this study is to present the best suitable methodology fer selection of construction method by considering potential risk of construction method and variables together with external condition for Underground construction. The purpose of this study is to select the most suitable construction method by analysing potential conditions(Construction site situation and Client. Request in designing) To do this, We prepared arrangement rule to arrangement conditions for construction method. And then make Checklist the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy Process among Multiple-Criteria Decision Making, the professional opinions is to be adapted. By doing this, It can lead and select the most suitable considering method considering the data which get from risk density test.

  • PDF

지역단위 생태위해성평가 선진국사례 분석 (Comparative Study of Regional-scale Ecological Risk Assessment used in Developed Countries)

  • 신유진;이우미;안윤주
    • Environmental Analysis Health and Toxicology
    • /
    • 제25권2호
    • /
    • pp.169-177
    • /
    • 2010
  • Ecological risk assessment (ERA) has been used to establish environmental quality standards or evaluate ecological risk in site-specific areas. The scope of ERA was expanded based on regions, and the concept of regional-scale ecological risk assessment was recently introduced in developed countries. In the present study, regional ERA approaches of relative risk model (RRM), contaminants in aquatic and terrestrial ecosystems (CATS) model, and procedure for ecological tired assessment of risks (PETAR) in advanced countries were extensively investigated. Regional ERA was compared with traditional ERA process. Stressors, receptor and response in traditional ERA were replaced with sources of stressors, habitats, and ecological impacts, respectively in regional ERA. This study introduces the concept and assessment process of regional ERA, and provides a wide perspective how the relative ERA could be applied in Korean ecosystem.

저수지 안전관리를 위한 위험도 해석의 필요성과 도입방안 (Schematic Development of Risk Analysis for Dam Safety)

  • 허건
    • 한국농공학회논문집
    • /
    • 제58권2호
    • /
    • pp.11-20
    • /
    • 2016
  • Korea has 17,500 irrigation dams and facing variety of causes that jeopardize dam safety. With limited resources available to manage large inventory, a portfolio risk analysis application method for numerous irrigation dam safety is essential. The purpose of this study is to find an optimum way to adopt the risk analysis to the large number of irrigation dams in Korea and to propose the portfolio risk analysis process for irrigation dams. In this study, the necessity of the risk analysis for reservoirs safety has been suggested and a phased process using pre-screening and screening methodology has been proposed. This proposed procedure will help to effectively introduce the risk analysis for reservoirs safety in Korea.

Caries Management by Risk Assessment (CAMBRA) 모형에 따른 임상 예방치과 및 치위생 진료 (Clinical Preventive Dental and Dental Hygiene Practice by Caries Management by Risk Assessment (CAMBRA))

  • 조영식
    • 치위생과학회지
    • /
    • 제12권6호
    • /
    • pp.545-557
    • /
    • 2012
  • Dental caries is biofilm induced disease throughout life and is recognized significant oral health problem. This article reviewed new trends in dental caries management by risk assessment, including history, protocol/guideline, and collaborated model. Dental caries prevention and treatment according to caries management by risk assessment (CAMBRA) model is patient-centered, risk-based, evidence-based practice. Team approach is necessary and clinician need to integrate science, practice and product. Dental hygienist take a important role in implementing CAMBRA. CAMBRA model could be incorporated into clinical dental hygiene education based on dental hygiene process of care as standard of dental hygiene practice and education. Dentist and dental hygienist able to provide scientific and ethical care managing dental caries by risk assessment.

GIS를 이용한 정적 자연환경인자의 분석에 의한 산사태 취약성 평가 (An Estimation of Landslide's Vulnerability by Analysis of Static Natural Environmental Factors with GIS)

  • Yang, In-Tae
    • 한국지형공간정보학회:학술대회논문집
    • /
    • 한국지형공간정보학회 2005년도 아시아 태평양 국제 GSIS 학술발표회
    • /
    • pp.61-72
    • /
    • 2005
  • The landslide risk assessment process consists of hazard risk assessment and vulnerability analysis. landslide hazard risk is location dependent. Therefore, maps and spatial technologies such as GIS are very important components of the risk assessment process. This paper discusses the advantages of using GIS technology in the risk assessment process and illustrates the benefits through case studies of live projects undertaken. The goal of this study is to generate a map of landslide vulnerability map by analysis of static natural factors with GIS. A simple and efficient algorithm is proposed to generate a landslide potentialities map from DEM and existing maps. The categories of controlling factors for landslides, aspect of slope, soil, vegetation are defined. The weight values for landslide potentialities are calculated from AHP method. Slope and slope-direction are extracted from DEM, and soil informations are extracted from digital soil map. Also, vegetation informations are extracted from digital vegetation map. Finally, as overlaying, landslide potentialities map is made out, and it is verified with landslide place.

  • PDF

건설관리에서의 PROMETHEE기반 공정 리스크 분석 (Analysis of the Schedule Risk using PROMETHEE in Building Construction Management)

  • 이장영;윤유상;장명훈;서상욱
    • 한국건설관리학회논문집
    • /
    • 제11권2호
    • /
    • pp.25-34
    • /
    • 2010
  • 최근 건설 프로젝트는 규모의 대형화, 공정의 복잡함 등에 의한 리스크 인자의 발생이 증가하고 있다. 이로 인해 건설관리에서 리스크 관리의 중요성은 더욱 부각되고 있는 현실이다. 리스크 관리는 확인, 분석, 대응의 과정을 통해서 이루어지며, 분석과정에서 위험인자들의 중요도 및 우선순위를 객관적이고 정확하게 분석해내는 것이 리스크 관리의 성공여부를 좌우한다. 본 연구는 기존연구에서 건설 프로젝트의 공정 리스크 중요도 및 우선순위를 산출하는데 사용된 AHP 기법의 문제점을 보완하기 위하여 PROMETHEE를 활용한 정량적 분석 프로세스를 제시하였다. PROMETHEE를 사용함으로써 AHP 기법에서 분석대상 인자가 9개를 초과 할 때의 신뢰성 저하와 인자의 추가 또는 삭제 시 발생하는 복잡한 산출절차의 문제점을 보완할 수 있을 것으로 기대된다.

A MULTIVARIATE JUMP DIFFUSION PROCESS FOR COUNTERPARTY RISK IN CDS RATES

  • Ramli, Siti Norafidah Mohd;Jang, Jiwook
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • 제19권1호
    • /
    • pp.23-45
    • /
    • 2015
  • We consider counterparty risk in CDS rates. To do so, we use a multivariate jump diffusion process for obligors' default intensity, where jumps (i.e. magnitude of contribution of primary events to default intensities) occur simultaneously and their sizes are dependent. For these simultaneous jumps and their sizes, a homogeneous Poisson process. We apply copula-dependent default intensities of multivariate Cox process to derive the joint Laplace transform that provides us with joint survival/default probability and other relevant joint probabilities. For that purpose, the piecewise deterministic Markov process (PDMP) theory developed in [7] and the martingale methodology in [6] are used. We compute survival/default probability using three copulas, which are Farlie-Gumbel-Morgenstern (FGM), Gaussian and Student-t copulas, with exponential marginal distributions. We then apply the results to calculate CDS rates assuming deterministic rate of interest and recovery rate. We also conduct sensitivity analysis for the CDS rates by changing the relevant parameters and provide their figures.

역공학 및 재공학 시스템엔지니어링 프로세스 적용을 통한 무인열차자동제어시스템 개발 (Automatic Train Control (ATC) System Development through Application of Reverse and Re-Systems Engineering Process)

  • 이중윤;박영원
    • 제어로봇시스템학회논문지
    • /
    • 제9권10호
    • /
    • pp.836-843
    • /
    • 2003
  • The automatic train control (ATC) system development project for the Automated Guideway Transit (AGT) system has high technical risk because the system is unmanned train control system using wireless technology which was unprecedented in train control industry of Korea. To overcome the technical risk during concept design phase of the ATC system development project, the integrated product team(IPT) carried out a reverse and reengineering process using a systems engineering design model. The generic systems engineering process is incorporated in the both reverse and reengineering process. As a result of the systems engineering effort, the IPT has built top layer systems engineering design model of the ATC subsystem. The purpose of this paper is to deliver the reverse and reengineering process which was used to develop the systems engineering design model of ATC system using a computer aided systems engineering tool. This study also shows that the model based reverse and reengineering process can reduce the technical risk by identifying the differences of requirement, functional and physical architecture between a reference system and a target system.

이산화탄소 지중저장의 국내적용을 위한 위해성 평가 방안 (A risk assessment of $CO_2$ geological storage for domestic application)

  • 이강렬;이대수
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.220.1-220.1
    • /
    • 2011
  • In recent years, the importance of Carbon Capture and Storage (hereafter CCS) is growing bigger and bigger. The development and commercialization of CCS technology are concerned for reducing carbon dioxide($CO_2$) emissions. For the most studies, the technology of $CO_2$ storage is known as the geological storage, ocean sequestration, mineral carbonation, industrial utilization, and so on. The geological storage is adjudged the most reasonable technology from economic and environmental aspects. Generally, the $CO_2$ geological storage is comprised of compression - transportation - drilling/injection - storage/management process. The critical problem is a leakage of $CO_2$ in all process. For resolving a leakage problem, it is necessary to predict and build a monitoring system. Those systems are proved safety of a leakage and received positive social perceptions of $CO_2$ geological storage. For those reasons, a risk assessment of $CO_2$ geological storage is required. A risk assessment is an estimated process of the possible effects when spilling $CO_2$. Although numerous studies of risk assessment have studied, it is incomplete to evaluate a risk and disaster quantitatively. The risk assessment will be developed for domestic application and safe $CO_2$ geological storage considering characteristics of Korea.

  • PDF