• Title/Summary/Keyword: risk assessment method

Search Result 1,284, Processing Time 0.03 seconds

The Impact of BCMS Risk Assessment on Business Performance (BCMS의 위험평가가 경영성과에 미치는 영향)

  • Jang, Geun-Young;Kim, Deok-ho;Cheung, Chong-Soo
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.81-96
    • /
    • 2021
  • Purpose: Based on the preceding studies in supply chain management, factors were analyzed to verify the effect of risk assessment and risk management factors of the business continuity management system (BCMS) on management performance. The purpose of this study is to establish a systematic risk management plan by deriving the risk factors of BCMS and evaluating unpredictable risks, and at the same time, contributing to a company's competitive advantage without interruption of work. Method: The structural relationship between risk assessment, risk management and management performance of BCMS was derived. To this end, a questionnaire survey was conducted of 124 managers and managers in Korean companies. Frequency analysis, validity analysis, reliability analysis, correlation analysis, and simple regression analysis were performed. Result: First, risk assessment had a positive (+) effect on risk management. Second, risk management had a positive (+) effect on management performance. Finally, risk assessment had a positive (+) effect on management performance. Conclusion: BCMS's risk assessment and risk management capabilities should be managed through financial performance, and risk management activities should be managed through non-financial performance.

A Comparison of Excess Rates of Risk Factors among Ergonomic Assessment Tools for Automobile and Part Manufacturing Industry Workers (자동차 업종의 근골격계질환 발생 위험요인에 대한 인간공학적 평가도구간 초과율 비교)

  • Chung, Eun Kyo;Kim, Jung Man
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.19 no.2
    • /
    • pp.88-95
    • /
    • 2009
  • There are many assessment techniques used for occupational risk factors of MSDs in the workplaces. However, because all ergonomic assesment techniques or tools are based on theoretical background derived from workphysiology, biomechanics, psychophysics, industrial hygiene, work system, and etc, it is impossible to compare the assessment techniques. This study was conducted to compare the excess rates of risk factors among ergonomic assessment techniques and to make alternative methods. Site-visits to 6 automobile products and parts company provided data for process repeated work where the produced data was examined for evaluating the relationship between workplace lay-out and work posture by using ergonomic assessment techniques. We evaluated 157 jobs for simple repeated work and 37 jobs for manual materials handling (MMH). In simple repeated work, the exceeded rates of AC were 36.3% in OWAS method and 93.0% in RULA method. The exceeded rate for RULA method was significantly higher than those for OWAS method (p<0.05). In MMH, the exceeded rates of AC were 80.0% in NLE method and 76.5% in WAC method. Statistically significant differences were not identified in the exceeded rates for NLE and MAC methods (p<0.05). The analyzed results among ergonomic assessment techniques (OWAS, RULA, NLE/WAC) were applied to the same work places performing simple repeated work and manual materials handling simultaneously. The applied results showed statistically significant differences (p<0.05) among ergonomic assessment techniques (OWAS, RULA, NLE/WAC). Exceeded rates of four ergonomic assessment techniques in decreasing order was "RULA>NLE>WAC>OWAS". The RULA method was the strongest assessment technique for automobile products and parts company. We discovered that the results could easily be overestimated or underestimated when the ergonomic assessment techniques were not applied correctly during the evaluation process. Therefore, we recommend using at least 2 methods when evaluating and analysing the results.

Proposed Approach of Korean Ecological Risk Assessment for the Derivation of Soil Quality Criteria (토양준거치 도출을 위한 국내형 생태위해성평가기법 제안)

  • An, Youn-Joo;Lee, Woo-Mi;Nam, Sun-Hwa;Jeong, Seung-Woo
    • Journal of Soil and Groundwater Environment
    • /
    • v.15 no.3
    • /
    • pp.7-14
    • /
    • 2010
  • Ecological Risk Assessment (ERA) supports a decision-making process such as establishment of environmental quality criteria. Soil quality criteria (SQC) are essential to protect soil organisms from the exposure to various soil contaminants. In this study, ERA methodologies of advanced countries for soil pollution were extensively compared to propose the ERA approach suitable for soil ecosystem in Korea. The soil ERAs in European Chemical Bureau(ECB), The Netherlands, and Canada can be classified as deterministic ecological risk assessment (DERA), and probabilistic ecological risk assessment (PERA) based on species sensitivity distribution (SSD). We propose three ERA methods according to abundance and reliability of soil ecotoxicity data. The method considered land use such as residential/agricultural, and industrial/commercial uses. The taxonomic groups of soil organism were classified as 'Class' level including different trophic levels (Magnoliopsida or Liliopsida, Clitellata, and Insecta or Secernentea). This study can be used to estimate the soil quality criteria to protect soil biota.

Application of Probabilistic Risk Assessment to Space Launch Vehicle Propulsion System (우주 발사체 추진기관 시스템에 대한 확률적 위험 분석 적용)

  • Cho, Sang-Yeon;Shin, Myung-Ho;Kim, Yong-Wook;Oh, Seung-Hyub
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2006.11a
    • /
    • pp.71-74
    • /
    • 2006
  • This study shows the historical background, and work flow of PRA (Probabilistic Risk Assessment) method which devised by NASA during the space development. It also illustrates the possibility of adoption of the method to evaluation of reliability KSLV project.

  • PDF

Risk Assessment for Disaster Reduction in Small-Scale Construction Sites (소규모 건축현장 재해감소를 위한 위험성평가 방안)

  • Choi, Hyun-Jun
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.395-404
    • /
    • 2022
  • Purpose: Small-scale construction sites have insufficient systematic safety management activities, and due to the characteristics of the construction site, the production structure is complex due to external environmental factors, and the risk of construction equipment is very high. We would like to propose a checklist method among practical risk assessment techniques that can derive risk factors for disaster prevention at small construction sites and reduce disasters. Method: Risk factors were derived by analyzing literature research and disaster cases, and detailed work for a checklist of risk assessment suitable for small-scale construction sites was classified based on risk factor items. Result: Hazard factors were divided into 6 major categories, and 29 detailed types of work were classified based on actual work types, and 80 detailed works were classified accordingly. Conclusion: By arranging risk factors suitable for small-scale construction sites according to the classification system, the lack of expertise in the construction site can be supplemented, and risk factors can be derived more easily and disaster reduction can be expected through establishment of safety measures.

Evaluation of Risk Level for Damage of Marine Accidents in SRRs using Inner-Outer Dependence Method (내부-외부 종속법을 이용한 수색.구조 구역의 위험성 평가)

  • Jang, Woon-Jae;Keum, Jong-Soo
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2006.05a
    • /
    • pp.59-64
    • /
    • 2006
  • In this study, the risk of SRRs was assessed upon the scale of the damage of marine accidents. For the risk assessment, inner-outer dependence methods and special knowledge-based fuzzy logic were introduced. Also, in order to calculate the importance of assessment value in this study, a max min composition method was used for fuzzy logic based on the principle of fuzzy extension and the centroid of gravity method was used for non-fuzzy formation. In order to produce the importance of assessment items, the inner-outer dependence methods were used for assessment items, and markov analysis method was used for the importance of the final comprehensive assessment. As a result, the risk of SRR of Tongyoung and Yeosu was proven relatively higher, thus, it needs to have more rescue ships and rescue devices for relieving the risk in the future.

  • PDF

Evaluation of Risk Level for Damage of Marine Accidents in SRRs using Inner-Outer Dependence Method (내부-외부 종속법을 이용한 수색.구조 구역의 위험성 평가)

  • Jang Woon-Jae;Keum Jong-Soo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.12 no.3 s.26
    • /
    • pp.219-224
    • /
    • 2006
  • In this study, the risk of SRRs was assessed upon the scale of the damage of marine accidents. For the risk assessment, inner-outer dependence methods and special knowledge-based fuzzy logic were introduced. Also, in order to calculate the importance of assessment value in this study, a max-min composition method was used for fuzzy logic based on the principle of fuzzy extension and the centroid of gravity method was used for non-fuzzy formation. In order to produce the importance of assessment items, the inner-outer dependence methods were used for assessment items, and markov analysis method was used for the importance of the final comprehensive assessment. As a result, the risk of SRR of Tongyoung, Mokpo and Yeosu was proven relatively higher, thus, it needs to have more rescue ships and rescue devices for relieving the risk in the future.

  • PDF

The effect of the number of subintervals upon the quantification of the seismic probabilistic safety assessment of a nuclear power plant

  • Ji Suk Kim;Man Cheol Kim
    • Nuclear Engineering and Technology
    • /
    • v.55 no.4
    • /
    • pp.1420-1427
    • /
    • 2023
  • Seismic risk has received increased attention since the 2011 Fukushima accident in Japan. The seismic risk of a nuclear power plant is evaluated via seismic probabilistic safety assessment (PSA), for which several methods are available. Recently, the discrete approach has become widely used. This approximates the seismic risk by discretizing the ground motion level interval into a small number of subintervals with the expectation of providing a conservative result. The present study examines the effect of the number of subintervals upon the results of seismic risk quantification. It is demonstrated that a small number of subintervals may lead to either an underestimation or overestimation of the seismic risk depending on the ground motion level. The present paper also provides a method for finding the boundaries between overestimation and underestimation regions, and illustrates the effect of the number of subintervals upon the seismic risk evaluation with an example. By providing a method for determining the effect of a small number of subintervals upon the results of seismic risk quantification, the present study will assist seismic PSA analysts to determine the appropriate number of subintervals and to better understand seismic risk quantification.

Countermeasure of Voltage Sag in Radial Power Distribution System using Load Transfer Switching (부하 절환 스위칭을 이용한 방사상 배전계통에서의 순간전압강하 대책)

  • Yun, Sang-Yun;Oh, Jung-Hwan;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.11
    • /
    • pp.558-565
    • /
    • 2000
  • In this paper, we propose a method for mitigating for mitigating the effect of voltage of voltage sag in radial power distribution systems using load transfer switching (LTS). The term of LTS is defined that the weakness load points for voltage sag transfer to the alternative source during the fault clearing practices. The sequenced of proposed LTS method is divided into the search of weakness points for voltage sag using the risk assessment model and transfer behavior of weakness points. The search of weakness point is carried out using the risk assessment model of voltage sag and Monte Carlo simulation method and the historical reliability data in Korea Electric Power Corporation (KEPCO) are also used. Through the case studies, we verify the effectiveness of proposed LTS method and present the searching method of effective application points of LTS method using the risk assessment model.

  • PDF

Determination of the Construction Method for Young Dong Tunnel by Risk Assessment (위험도 분석기법에 의한 영동선 터널의 굴착공법 결정사례)

  • Kim, Yong-Il;Hencher, S.R.;Yoon, Young-Hoon;Cho, Sang-Kook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.13-25
    • /
    • 2002
  • The construction method for Young Dong Tunnel has been chosen following detailed risk assessment. In this paper, the specific risks to the project programme, associated with adopting either mechanical excavation in the form of a shielded TBM, or drill and blast excavation methods, are assessed. From the risk assessment results, and taking other important factors into account, such as project sensitivity and local experience, the recommendation is made that the relatively low risk drill-and-blast method is the most appropriate for construction of Young Dong Tunnel.

  • PDF