• Title/Summary/Keyword: risk assessment method

Search Result 1,296, Processing Time 0.025 seconds

Development of Standard Risk Indicators for the Prevention of Serious Accidents in Mobile Crane Operations (Focused on Construction Industry) (이동식크레인 작업의 중대재해예방을 위한 표준 리스크 평가 지수 개발 (건설업을 중심으로))

  • Jonggook Choi;Jongwoo Lee
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.719-728
    • /
    • 2023
  • Purpose: Mobile cranes are machines that contribute to high mortality, and the High Risk Factor (SIF) information, which analyzed 2,574 accidental deaths in the construction industry in the past 6 years (2016~2021), resulted in a total of 61 mobile crane accidents. Despite safety measures in the field, it is not used properly. In this study, we present standard risk assessment indicators that contribute to accident prevention. Method: Through expert interviews, fatal accident case analysis, field analysis, and literature research, we present the standard risk assessment index method of the 4M risk assessment method. Result: As a result of analyzing the risk assessment of eight sites, it was concluded that it cannot make a significant contribution to disaster prevention and should be applied as an improvement measure of the Standard Risk Assessment Index Law. Conclusion: Switching to the standard risk assessment index method at construction sites has been proposed to make it easier for health and safety personnel and workers to use, contributing to the reduction of accidents.

Development of Integrated Method and Tool for Railway Risk Assessment (철도 위험도 통합 평가 방법 및 도구 개발)

  • Han, Sang-Hoon;Ahn, Kwang-Il;Wang, Jong-Bae;Lee, Ho-Joong
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1132-1139
    • /
    • 2006
  • Railway risk is evaluated by a method of linking event trees and fault trees as the general PSA(Probabilistic Safety Assessment) model for the risk assessment of complex systems. Accident scenarios causing undesirable events are modeled by event trees comprised of several accident sequences. Each branch located in the accident progression of the event tree is modeled by an fault tree or can be represented by some value too simply. We usually evaluate the frequency of the whole sequence by adding them after calculating the frequency of each sequence at a time. However, since there are quite a number of event trees and fault trees in the railway risk assessment model, the number of sequence to evaluate increases and preparation for the risk assessment costs much time all the more. Also, it may induce errors when analysts perform the work of quantification. Therefore, the systematic maintenance and control of event trees and fault trees will be essential for the railway risk assessment. In this paper we introduce an integrated assessment method using one-top model and develop a risk assessment tool for the maintenance and control of the railway risk model.

  • PDF

Case Studies of Risk Assessment in Analyzing Risks Associated with MSDS

  • Kim, Woo Jin;Jeong, Byung Yong
    • Journal of the Ergonomics Society of Korea
    • /
    • v.32 no.1
    • /
    • pp.153-158
    • /
    • 2013
  • Objective: This study aims to suggest different approaches in analyzing risks associated with musculoskeletal disorders (MSDS) for risk assessment. Background: Upon concluding that the changes in the industrial environments have made it hard to regulate diverse risk factors, the government has implemented a policy for risk assessment. Method: This study has proposed a method, creating programs using Excel that perform qualitative or quantitative analysis, for evaluating risk factors in risk assessments and has applied this in manufacture and service industries. Results: To verify the validity of the developed program, risk assessment has been performed on restaurant chefs as an example. For quantitative evaluation, the study has suggested approaches using the results for REBA evaluation and the analysis report on the work scenes of a fitting-shop in a shipbuilding industry. Application: Constructing and adapting a system using Excel in evaluating risk factors for risk assessments as this study suggests, is expected to contribute to revitalizing risk assessments.

A study on the quantitative risk grade assessment of initial mass production for weapon systems (초도양산 군수품에 대한 정량적 위험등급평가 방안 연구)

  • Jung, Yeongtak;Ham, Younghoon;Roh, Taegoo;Ahn, Manki;Ko, Kyungwa
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.3
    • /
    • pp.441-452
    • /
    • 2018
  • Purpose: The purpose of this paper is to study quantitative risk grade assessment for objective government quality assurance activities based on risk management in initial mass production for weapon systems. Methods: The Defense quality management regulations and foreign risk assessment documents are referred to analyze problems performing quality assurance actives. The failure rate data, maintainability and cost of products have been studied to quantify the risk Likelihood and impact. The analyzed data were classified as risk grade assessment through K-means Cluster Analysis method. Results: Results show that a proposed method can objectively evaluate risk grade. The analyzed results are clustered into three levels such as high, middle and low. Two products are allocated high, eleven low and seven middle. Conclusion: In this paper, quantitative risk grade assessment methods were presented by analyzing risk ratings based on objective data. The findings showed that the methods would be effective for initial mass production for weapon systems.

A Study on the Perception Level of Health and Safety among the Participants for Optimization of Risk Assessment in Construction Industry (건설업 위험성 평가 최적화를 위한 운영 주체간 안전보건 인식도 조사 연구)

  • Paek, Chung-Hyeun;Cho, Ur-Ryong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.23-32
    • /
    • 2015
  • Recently, the Ministry of Labour, published clause 2 of Article 41 (Risk Assessment) of the Act "Industrial Safety and Health" dated 12 June 2013 in connection with continuous increase of accidents at construction sites in order to prevent accidents in industrial safety and health in new construction in accordance with the risk assessment on construction projects are realized after March 13, 2014. In this paper, positive method of calculating risk discussed by performing research the awareness of general contractors and sub-contractors with presenting risky situation is considered. The purpose will be a positive method of calculating risk and would be a sufficient base and give a positive direction in the development of new systems currently working in the construction and risk assessment which consider the characteristics of sufficient risk assessment system for future research.

Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants (화력발전설비 위험도 평가를 통한 기기별 정비주기 예측)

  • Song, Gee Wook;Kim, Bum Shin;Choi, Woo Song;Park, Myung Soo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.10
    • /
    • pp.1291-1296
    • /
    • 2013
  • Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (POF) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RBI is to identify important failure modes and causes in the equipment. Once these are defined, the POF and COF can be assessed for each failure. During POF and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the POF is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided.

Comparative Analysis of Risk Assessment Tools for Infectious Diseases (국외 감염병 위험도 평가체계의 비교분석)

  • Choi, Eunmi;Woo, Darae;Choe, YoungJune;Yeh, Jungyong;Park, Sangshin
    • Health Policy and Management
    • /
    • v.32 no.4
    • /
    • pp.380-388
    • /
    • 2022
  • Background: Emerging infectious diseases, such as Middle East respiratory syndrome or coronavirus disease 2019, pose a continuous threat to public health, making a risk assessment necessary for infectious disease control and prevention. Therefore, we aimed to investigate the risk assessment methods for infectious diseases used by major foreign countries and organizations. Methods: We conducted an investigation and comparative analysis of risk assessment and risk determination methods for infectious diseases. The risk assessment tools included the strategic toolkit for assessing risks, influenza risk assessment tool, pandemic severity assessment framework, and rapid risk assessment methodology. Results: The most frequently reported risk elements were disease severity, antiviral treatment, attack rate, population immunity, and basic productive ratio. The risk evaluation method was evaluated quantitatively and qualitatively by the stakeholders at each institution. Additionally, the final risk level was visualized in a matrix, framework, and x and y-axis. Conclusion: Considering the risk assessment tools, the risk element was classified based on the duplicate of each indicator, and risk evaluation and level of risk assessment were analyzed.

A Method to Improve the Risk Assessment in the Defense Quality Assurance Using AHP (AHP를 활용한 국방 품질보증 위험도 평가 개선 방안)

  • Lee, Nack-Hyung;Lee, Sang-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.33 no.1
    • /
    • pp.31-42
    • /
    • 2007
  • While Defense Agency fur Technology and Quality(DTaQ) has been utilized a risk assessment method as a quality assurance activity for defense goods since 1999, a risk assessment method is known to be ineffective to identify defective items. The objective of this study is to propose the new evaluation method, that adjusts a relative priority of evaluation elements using AHP(Analytic Hierarchy Process). Newly evaluated scores have been applied to the risk assessment result of 2005 defective items to test a validity of the new evaluation model. The new model is capable to identify more high and medium risk-level items than the current method. The company risk-level gets more scores than the item risk-level in the new model.

An Objective method of risk assessment based on RAM analysis for warship (함정 분야의 RAM분석 기반 위험평가 방안)

  • Beak, Yong-Kawn;Kang, Byoung-Soo;Jo, Kwan-Jun
    • Journal of Korean Society for Quality Management
    • /
    • v.43 no.4
    • /
    • pp.511-520
    • /
    • 2015
  • Purpose: This study suggests a method of risk assessment based on RAM analysis in order to reduce the subjectivity. Methods: RAM analysis is used to assessment risk consequence(RC) and risk likelihood(RL). Result: The calculated result of the product, which has higher risk assessment, shows lower MTBF system. Conclusion: Risk assessment based on objective database will provide objectivity and effective quality control.

On a Risk Assessment Methodology based on the Technology Readiness Levels, Degrees of Difficulty, and Technology Need Values in the Development of Naval Surface Ships (수상함 개발에서 기술성숙도, 난이도 및 중요도 기반의 위험도 평가 방안)

  • Kim, Kyong-Hwan;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.151-158
    • /
    • 2012
  • The objective of this paper is to propose a method of how to perform risk assessment in the early stage of defense research and development for the acquisition of weapon systems. An advanced method for risk assessment and its associated objective functions are developed first based on the concept of systems engineering. The developed method is then applied to carry out the analysis of alternatives in the trade-off environments. As a case study, the multi-purpose training ship is considered, where it is performed using the notions of technology readiness levels, degrees of difficulty, and technology need values to facilitate design space visualization and decision maker interaction. It is noted that decision makers can benefit from our approach as an improved risk assessment method in the context of multi-criteria decision making.