• 제목/요약/키워드: resource scheduling

검색결과 609건 처리시간 0.036초

조선 선행탑재 및 탑재 일정계획에서의 부하평준화를 위한 발견적 기법 (Heuristic Algorithms for Resource Leveling in Pre-Erection Scheduling and Erection Scheduling of Shipbuilding)

  • 우상복;류형곤;한형상
    • 산업공학
    • /
    • 제16권3호
    • /
    • pp.332-343
    • /
    • 2003
  • This paper deals with pre-erection scheduling and erection scheduling in shipbuilding. Among shipbuilding scheduling, the ship erection scheduling in a dock is one of the most important since the dock is the most critical resource in a shipyard. However, it is more reasonable to consider pre-erection scheduling and erection scheduling as unified because they compete with the common constrained resources such as labor, crane, space, and so on. It is very hard to consider two scheduling problems simultaneously, and hence, we approach them sequentially. At first, we propose space resource leveling heuristics in pre-erection scheduling given erection date. And then, considering the manpower resource determined by pre-erection scheduling, we also propose manpower resource leveling heuristics in erection scheduling. Various experimental results with real world data show that the proposed heuristics have good performance in terms of scheduling quality and time.

A Resource Scheduling for Supply Chain Model

  • 양병화
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2004년도 추계학술대회 및 정기총회
    • /
    • pp.527-530
    • /
    • 2004
  • This paper presents an optimization formulation for resource scheduling in Critical Resource Diagramming (CRD) of production scheduling networks. A CRD network schedules units of resources against points of needs in a production network rather than the conventional approach of scheduling tasks against resource availability. This resource scheduling approach provides more effective tracking of utilization of production resources as they are assigned or 'moved' from one point of need to another. Using CRD, criticality indices can be developed for resource types in a way similar to the criticality of activities in Critical Path Method (CPM). In our supply chain model, upstreams may choose either normal operation or expedited operation in resource scheduling. Their decisions affect downstream's resource scheduling. The suggested optimization formulation models resources as CRD elements in a production two-stage supply to minimize the total operation cost

  • PDF

An Efficient Scheduling Method for Grid Systems Based on a Hierarchical Stochastic Petri Net

  • Shojafar, Mohammad;Pooranian, Zahra;Abawajy, Jemal H.;Meybodi, Mohammad Reza
    • Journal of Computing Science and Engineering
    • /
    • 제7권1호
    • /
    • pp.44-52
    • /
    • 2013
  • This paper addresses the problem of resource scheduling in a grid computing environment. One of the main goals of grid computing is to share system resources among geographically dispersed users, and schedule resource requests in an efficient manner. Grid computing resources are distributed, heterogeneous, dynamic, and autonomous, which makes resource scheduling a complex problem. This paper proposes a new approach to resource scheduling in grid computing environments, the hierarchical stochastic Petri net (HSPN). The HSPN optimizes grid resource sharing, by categorizing resource requests in three layers, where each layer has special functions for receiving subtasks from, and delivering data to, the layer above or below. We compare the HSPN performance with the Min-min and Max-min resource scheduling algorithms. Our results show that the HSPN performs better than Max-min, but slightly underperforms Min-min.

자원 신뢰성 측정을 통한 효율적인 그리드 자원 스케줄링 모델 (Efficient Grid Resource Scheduling Model with Resource Reliability Measurement)

  • 박다혜;이종식
    • 한국시뮬레이션학회논문지
    • /
    • 제15권4호
    • /
    • pp.129-136
    • /
    • 2006
  • 그리드 컴퓨팅은 단일 컴퓨터로는 해결할 수 없는 대용량의 작업을 처리하기 위해 제안되었다. 그리드 컴퓨팅은 지리적으로 분산된 이기종 자원들을 상호 연결하여 대용량의 작업들을 처리하는 새로운 차세대 컴퓨팅이다. 그런데, 분산된 이기종의 자원들을 모을 때에 많은 어려운 문제들이 발생한다. 특히, 자원들의 신뢰성을 보장하는 것은 가장 심각한 문제 중에 하나이다. 그래서 우리는 그리드 자원의 신뢰성을 측정하여 자원을 할당하는 그리드 자원 신뢰성 측정 스케줄링 모델을 제안한다. 우리는 자원의 상태 정보를 기반으로 하여 자원 신뢰성을 측정하고, DEVSJAVA 모델링과 시뮬레이션 환경에서 그리드 시뮬레이션 모델에 그리드 자원 신뢰성 측정 방법을 적용하였다. 그리고, 이 논문은 스케줄링 모델들의 Utilization, Job loss, Throughput 그리고 Average Turn-around Time 같은 파라미터들을 측정하였고, 자원 신뢰성 측정을 이용한 그리드 자원 신뢰성 측정 스케줄링 모델의 실험 결과들을 기존의 스케줄링 모델들(랜덤 스케줄링 모델, 라운드 로빈 스케줄링 모델)과 비교하였다. 이 실험 결과들은 자원 신뢰성 측정 스케줄링 모델이 랜덤 스케줄링 모델과 라운드 로빈 스케줄링 모델에 비해 효율적인 자원 할당과 안정적인 작업 처리를 제공한다는 것을 보여준다.

  • PDF

시간-자원 트레이드오프 프로젝트 스케줄링 문제 해결을 위한 시뮬레이티드 어닐링 기반 휴리스틱 알고리즘 개발 (Development of a Heuristic Algorithm Based on Simulated Annealing for Time-Resource Tradeoffs in Project Scheduling Problems)

  • 김건아;서윤호
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제28권4호
    • /
    • pp.175-197
    • /
    • 2019
  • Purpose This study develops a heuristic algorithm to solve the time-resource tradeoffs in project scheduling problems with a real basis. Design/methodology/approach Resource constrained project scheduling problem with time-resource tradeoff is well-known as one of the NP-hard problems. Previous researchers have proposed heuristic that minimize Makespan of project scheduling by deriving optimal combinations from finite combinations of time and resource. We studied to solve project scheduling problems by deriving optimal values from infinite combinations. Findings We developed heuristic algorithm named Push Algorithm that derives optimal combinations from infinite combinations of time and resources. Developed heuristic algorithm based on simulated annealing shows better improved results than genetic algorithm and further research suggestion was discussed as a project scheduling problem with multiple resources of real numbers.

자원인자 기반 스케줄링 프레임워크 (Resource Scheduling Framework based on Resource Parameter Graph)

  • 배재환;권성호;김덕수;이강우
    • 한국산업정보학회논문지
    • /
    • 제8권3호
    • /
    • pp.19-31
    • /
    • 2003
  • 대규모 환경의 고성능 그리드 구현을 위해서는 기존 그리드 자원 스케줄링 파라다임이 갖 성능 확장성 측면의 제한성을 극복할 수 있는 새로운 자원 스케줄링 프레임워크가 요구된다. 본 연구에서는 자원 스케줄링 성능 최적화를 목표로 자원인자 그래프(Resource Parameter Graph), 자원인자 인덱스 트리(Resource Parameter Index Tree), 그리고 정적 자원 정보 리포지터리로 구성되는 자원인자 스케줄링 프레임워크를 제안한다. 자원인자 그래프는 자원간의 관계 및 자원의 계층적 구성을 나타낼 수 있는 자원표현기법이며 이러한 표현을 기술하기 위한 XML 기반 자원정보 및 자원요청 기술 스키마를 설계하였다. 또한 자원인자 인덱스 트리는 자원 스케줄링의 자원탐색 및 자원할당, 상태정보 공지 등의 알고리즘의 효율적인 지원을 위한 메모리 기반 인덱스의 데이터 구조이다. 본 논문에서는 이러한 자원인자 스케줄링 프레임워크의 구성 내용에 대하여 기술한다.

  • PDF

자원제약하에서의 지연 스케쥴링 (Delayed Scheduling under Resource Constrains)

  • 신인수;이근만
    • 한국정보처리학회논문지
    • /
    • 제4권10호
    • /
    • pp.2571-2580
    • /
    • 1997
  • 본 연구에서는 자원의 수가 한정된 상태에서 동작 알고리즘의 수행을 마치기 위한 자원제약 스케쥴링 방법을 다루었다. 특히, 제한된 자원제약하에서 연산이 할당되는 제어스텝의 최하한값을 구하기 위한 지연 스케쥴링 방법을 제안하였다. 스케쥴링 문제에 대하여 연산의 멀티싸이클과 기능적 파이프라이닝을 고려하였으며 스케쥴링 문제에 대한 최적의 결과를 얻기 위해 선형정수계획법을 이용하였다. 5차 디지털 웨이브 필터 DFG를 실험 대상으로 하여 본 연구의 효용성을 입증하였다.

  • PDF

Mobile Resource Reliability-based Job Scheduling for Mobile Grid

  • Jang, Sung-Ho;Lee, Jong-Sik
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제5권1호
    • /
    • pp.83-104
    • /
    • 2011
  • Mobile grid is a combination of grid computing and mobile computing to build grid systems in a wireless mobile environment. The development of network technology is assisting in realizing mobile grid. Mobile grid based on established grid infrastructures needs effective resource management and reliable job scheduling because mobile grid utilizes not only static grid resources but also dynamic grid resources with mobility. However, mobile devices are considered as unavailable resources in traditional grids. Mobile resources should be integrated into existing grid sites. Therefore, this paper presents a mobile grid middleware interconnecting existing grid infrastructures with mobile resources and a mobile service agent installed on the mobile resources. This paper also proposes a mobile resource reliability-based job scheduling model in order to overcome the unreliability of wireless mobile devices and guarantee stable and reliable job processing. In the proposed job scheduling model, the mobile service agent calculates the mobile resource reliability of each resource by using diverse reliability metrics and predicts it. The mobile grid middleware allocated jobs to mobile resources by predicted mobile resource reliability. We implemented a simulation model that simplifies various functions of the proposed job scheduling model by using the DEVS (Discrete Event System Specification) which is the formalism for modeling and analyzing a general system. We also conducted diverse experiments for performance evaluation. Experimental results demonstrate that the proposed model can assist in improving the performance of mobile grid in comparison with existing job scheduling models.

An algorithm for resolution of resource conflicts in scheduling

  • ;한재민
    • 경영과학
    • /
    • 제9권1호
    • /
    • pp.119-137
    • /
    • 1992
  • A two phase heuristic algorithm has been developed for the resolution of resource conflicts in a single project scheduling problem. Phase 1 of the algorithm generates a feasible schedule by repairing resource conflicts. Phase 2 finds local improvements in the schedule found in phase 1. Then, the algorithm has been applied to multi project and job shop scheduling. Computational results are compared with those of dispatching procedures. Index Terms-disjunctive constraints, heuristic algorithm, project scheduling, job-shop scheduling.

  • PDF

Term-Based Approach를 기초로한 자원제한프로젝트스케줄링 문제의 해결 (Solution of the Resource Constrained Project Scheduling Problem on the Foundation of a Term-Based Approach)

  • 김복선
    • 한국지능시스템학회논문지
    • /
    • 제24권2호
    • /
    • pp.218-224
    • /
    • 2014
  • The logic-based scheduling language RCPSV may be used to model resource-constrained project scheduling problems with variants for minimizing the project completion time. A diagram-based, nonredundant enumeration algorithm for the RCPSV-problem is proposed and the correctness of the algorithm is proved.