Byeong Cheol Lho;Jeong Hoon Kim;Ok Youn Yu;Julian Kang
International conference on construction engineering and project management
/
2005.10a
/
pp.592-595
/
2005
Concrete slab bridge is one of most common structures employed for local road constructions because of its simplicity in design and construction. Computer applications were developed to automate the repetitive computation for these simple structures. However, in most cases, managing the electronic documents produced by these applications has not been incorporated with design automation application yet. Resultant documents are often managed by individuals and disappear as time goes by due to lack of systemic management. This paper introduces a Web-based application developed to not only speed up the design process but also enhance the collection and manipulation of resultant electronic documents.
International conference on construction engineering and project management
/
2005.10a
/
pp.986-991
/
2005
Intense competition existing in construction market creates an industry that is dominated by the client groups. Numerous studies dealing with private clients' needs and expectations from contractor firms exist in the literature. However in the unique construction industry, in addition to clients, consultants as representatives of clients will almost always have very important roles to play as well. By presenting survey findings of 50 consultant firms, this study provides insights into consultants' general needs and expectations from contracting organizations on behalf of their clients by using the data from Northern Cyprus private building construction market.
International conference on construction engineering and project management
/
2020.12a
/
pp.243-248
/
2020
In addition to a range of H&S documentation, a range of actions, beliefs, interventions, practices, and states are important in terms of achieving optimum construction H&S. Conclusions include that H&S documentation facilitates and assists planning, organising, leading, controlling, and coordinating H&S. Furthermore, current H&S documentation: is inappropriate in that it can be complex, generic, lengthy, onerous, repetitive (duplicative), and vague; engenders dubious practices; generally, 'does not add the potential value'; shifts the focus from the physical process, and could be improved. Recommendations include: industry associations should review their 'audit system' to interrogate the allocation of points; H&S documents must reflect the intention of the requirement; the synergy between H&S documentation, and actions, interventions, and practices should be investigated, digested, and focused upon, and 'audits', or rather inspections, should focus more on the physical process, actions, interventions, and practices, than documentation.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.3
/
pp.715-723
/
2015
Earthwork in a large construction project such as a land development generally costs 20-30% of the total cost. The earthmoving process, comprising of four repetitive tasks: loading, hauling, unloading, returning, is quite simple and it does not need delicate or advanced techniques. Therefore, earthmoving earthwork planning can heavily affect the cost and time., and Even a slight deviation from the plan can increase or decrease the cost and time. This study presents a planning model that minimizes average haul distance in a large complex construction project. Based on earthwork planning, practitioners' heuristics, a districting algorithm and Simulated Annealing algorithm were employed to build the model. Districting algorithm plays a role that divides in dividing an earthmoving area into several sections. Simulated annealing provides a function that decides whether a new generated solution is confident. Finally, the proposed model was applied to a real earthmoving project of a large land development. It was found that the model showed approximately 14% improvement in average hauling distance compared to the actual design plan.
Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
Korean Journal of Construction Engineering and Management
/
v.15
no.2
/
pp.3-11
/
2014
As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.
Korean Journal of Construction Engineering and Management
/
v.1
no.3
s.3
/
pp.75-80
/
2000
In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.
The JTEL's success case of implementing ERP through ASP is studied in this paper. This paper especially presents the detail processes of implementing ERP through ASP and the advantages of that. Critical success factors in this case study are that pre-prepared ERP template and repetitive prototyping methodology was successfully utilized and that end users involved positively and accepted the standard best-practice processes of the ERP template in this project. These factors reduced ERP training periods and also the whole implementation periods, which made the project time quite short and TCO less. Considering these success factors, ASP method provides the advantages of global e-business IT environment, continuous new IT technologies and flexible response to the business changes to the small and medium firms. Finally, the paper suggests the new direction and possibility for small and medium firms focusing on the core competency and utilizing new system infrastructure through ASP method compared with in-house implementation.
Kim, Cheol-Hong;Gwon, Yeong-Jun;Baek, Seung-Ryeol;Son, Gyeong-Il
Journal of the Ergonomics Society of Korea
/
v.23
no.3
/
pp.121-134
/
2004
A research project was conducted to study work-related musculoskeletal disorders (MSDs) at subway train repair plant in Korea. The project was consisted of 4 main parts; education on the topics of MSDs for all workers, symptom survey, medical check-up, investigation of MSD risk factors. The result of symptom survey showed that 95.2% of the respondents complained pains on at least one part of the body. After cross-sectional analysis of various information and risk factors, 86.8% of respondents were considered as active health surveillance level 1 that require continuous monitoring on their symptoms and working conditions. And 57.1% of the respondents were considered as active health surveillance level 2 that needed medical check-ups for proper medical treatment. The analysis of occupational risk factors revealed that handling of heavy object (46.15%) and repeated awkward postures (46.15%) were two most contributing risk factors for the on-set of MSD at this work site followed by static strain (7.7%), and vibration and impact (3.8%). Medical examination was performed by an industrial medicine MD on 156 workers those considered as active health surveillance level 2. The result showed that 35 workers (20.7%) were considered as MSD patient group at severe level, and 68.6 workers (68.6%) were considered as moderate group and 18 workers (10.6%) were considered minor or normal group those have no symptom.
Kim, Junyoung;Yoon, Inseok;Jung, Minhyuk;Joo, Seonu;Park, Seungeun;Hong, Yeungmin;Cho, Jongwoo;Park, Moonseo
Korean Journal of Construction Engineering and Management
/
v.23
no.3
/
pp.3-12
/
2022
In general construction project planning ratio of manpower and quantity of outputs produced, such as the construction estimate standard, is used as the criterion for labor productivity. This method is highly effective in construction projects with repetitive work, however, there is a limit to apply in large-scale projects with high complexity. This is because the influence of non-work time caused by various work interruption factors that act complexly on the productivity of the project is greater than the average labor productivity derived from the performance data of the project. Therefore, this study proposes a productivity measurement method that can evaluate the characteristics of construction works and the cause of non-working time. To this end, first, detailed work processes and their non-work factors for each work type are defined, and the Adv-FMR technique is developed for quantitatively measuring them. Next, based on the concept of obtainable productivity, methods for comparative productivity analysis by work type, evaluating non-work factors, and deriving productivity improvement methods are proposed. Finally, a case study is conducted to validate that the analysis results based on Adv-FMR data can support the decision-making of construction managers on productivity management.
Kim, Myoung-Keun;Koh, In-Lyong;Min, Young-Gi;Chung, Tae-Seung
Journal of The Korean Digital Architecture Interior Association
/
v.13
no.3
/
pp.51-58
/
2013
The projects are becoming more complicated and amplified as the design and development technology is advancing. Thus, existing architectural processes and methods are revealing limitations. The technology of BIM is an IT applied to construction, that provides the state-of-the-art tools to overcome these limitations to improve on architectural designing, technology, cost, etc. Therefore, it it necessary to converge the advises and collaboration from the various experts at the initial step in a common processing platform. In this research project with Korean Education Development Institute, configuration and utilization of EDU BIM template is studied because setting an anchor point from the initial phase is necessary for such processes at the perspective of the operator. The purpose of this study is to prevent time consumptions at the initial phase of BIM foundation, to ensure accurate information inputs within the repetitive tasks, and for effective information management that will produce consistent results through utilization of BIM technology.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.