• Title/Summary/Keyword: reliability requirements

Search Result 810, Processing Time 0.026 seconds

Study on Reliability Assessment for the Medical Device Software from the Viewpoint of Functional Safety (기능 안전 관점에서의 의료기기 소프트웨어 신뢰성 평가 방법에 관한 연구)

  • Kim, Sung Min;Ko, Byeonggak;Do, Gyeong-Hun;Kim, Hye Jin;Ham, Jung-Keol
    • Journal of Applied Reliability
    • /
    • v.16 no.3
    • /
    • pp.216-223
    • /
    • 2016
  • Purpose: This paper suggests the procedure to enhance the reliability of the software of the medical device that is to cure, treat, diagnose, and prevent a disease or an abnormal health conditions. Methods: After test requirements are classified by the software requirements specification for safety and backgrounds, reliability assessment methods are suggested. Results: Verification and validation for function and safety can be performed whether the medical device software are implemented as intended. Conclusion: Procedure on the static analysis, unit test, integration test, and system test are provided for the medical device software.

A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method (최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구)

  • Choe, Gyu-Sik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

Reliability Analysis of the 300 W GaInP/GaAs/Ge Solar Cell Array Using PCM

  • Shin, Goo-Hwan;Kwon, Se-Jin;Lee, Hu-Seung
    • Journal of Astronomy and Space Sciences
    • /
    • v.36 no.2
    • /
    • pp.69-74
    • /
    • 2019
  • Spacecraft requires sufficient power in orbit to perform its mission. So as to comply with system requirements, the sufficient power should be made by a solar cell array by photovoltaic power conversion. A life time of space program depends on its mission considering parts reliability and parts grade. Based on the mission life time, power equipment might be designed to meet specifications. In outer space, solar cell array might generate the dc power by photovoltaic conversion effects and GaInP/GaAs/Ge solar cells are used in this study. Space programs that require more than five years should select parts for high reliability applications. Therefore, reliability analysis for high reliability applications should be performed to check its fulfilment of the requirements. This program should also require more five years for its mission and we performed its analysis using parts count method (PCM) for its reliability. Finally, we performed reliability analysis and obtained quantitative figures found out 99.9%. In this study, we presented the reliability analysis of the 300 W GaInP/GaAs/Ge solar cell array.

The Study on Setting up KTX-II's RAM Goals for Requirement Train-set (고속차량(KTX-II) RAM 목표값 설정을 통한 소요량 연구)

  • Cha, Jae-Hwan;Chung, In-Soo;Kim, Jong-Woon;Yu, Yang-Ha
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.191-198
    • /
    • 2009
  • There are almost no studies on verification of requirements for high speed rolling stocks by means of RAM goals and on setting RAM goals by means of verification on practical reliability, availability and maintainability for high speed rolling stocks though they are covered in specification of an order that RAM goals asked of rolling stocks are shown for gaining high quality of them and availability when they are in operation. This study is for estimating number of high speed train-sets that would be supplementarily placed an order through verification of RAM goals of a project for the introduction of KTX-II 100 cars. It verify that optimized requirements for high speed rolling stocks by relatively comparison with between requirements for train-sets through setting RAM goals and requirements for train-sets through analysis of prospects for management balance with high speed rolling stocks.

  • PDF

CE Certification for Machinery Safety in Automated LCD Monitor Process (LCD 모니터 공정자동화 장비의 안전성에 대한 CE 인증)

  • Lee, Hwan-Deok;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.419-432
    • /
    • 2011
  • In order to distribute machinery to European Union, it is mandatory to get CE marking to ensure the machinery is safe and reliable. The EHSR(Essential Health and Safety Requirements) of the EC Machinery Directive requires the machinery to be designed and manufactured to prevent from any dangerous situation. This study presents a case of CE Certification in Back Cover Nut Insert Machine and introduces an improvement method of product safety and reliability. This study also presents how to eliminate the deficiencies in design and manufacturing, and the process of applying EHSR for CE Marking.

A Study on the application of RAM Case for Railway System (철도시스템에 대한 RAM Case 적용에 관한 연구)

  • Baek, Young-Gu;Song, Kee-Tae;Kim, Min-Ho;Lee, Key-Seo;Shin, Keon-Young;Lee, Duck-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.683-688
    • /
    • 2007
  • The importance of reliability and safety, recently, shows a tendency to increases in railway system constructions and projects. At the point of view of safety, especially, the railway authority proposes an establishment of the safety case that is the documented demonstration that products comply with the specific safety requirements in railway industry. In case of reliability activities, there is no systematic documented demonstration in the railway industry. At this circumstance, this study presents the establishment of Reliability, Availability and Maintainability Case for railway system based on the MoD(Ministry of Defence) 00-42. This RAM Case will support that systems and products produced from suppliers or manufacturers meet the specific RAM requirements during the system life cycle(i.e, from design to operation & maintenance) through systematic process and evidences. Also, it is expected that railway system operations will be managed and supported from reliability activities in accordance with RAM Case.

  • PDF

A Study on Reliability Centered Maintenance (통합신뢰성 경영에서 보전에 중점을 둔 신뢰성에 관한 연구)

  • Kim, Hwan-Joong
    • Journal of Applied Reliability
    • /
    • v.3 no.1
    • /
    • pp.73-82
    • /
    • 2003
  • Reliability Centered Maintenance(RCM) was initially developed for the commercial aviation industry in the late 1960s and now is equally applicable to a variety of equipment other than aircraft. RCM is a method for establishing a preventive maintenance program which will efficiently and effectively allow the achivement of the the required safety and availability levels of equipment and structures. RCM provides for the use of a decision logic tree to identify applicable and effective preventive maintenance requirements for equipment and structures according to the safety, maintenance requirements for equipment and structures according to the safety, operational and economic consequences of identifiable failures, and the degradation mechanism, reponsible for the those failures. The end result of working through the decision logic is a judgement as to the necessity of performing a maintenance task. In this paper, we provide guiding principles based on IEC 60300-3-11 for RCM analysis methods and operational method of structure and equipment.

  • PDF

A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTAMethod (FTA기법에 의한 원전기동전원의 이용율 예측에 관한 연구)

  • Che, Gyu-Shik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.5
    • /
    • pp.517-523
    • /
    • 1999
  • The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.

  • PDF

Specification of Dependability Requirements (통합신뢰성 VOC 분석)

  • 김종걸;이낙영;권영일;홍연웅;전영록;나명환
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.267-268
    • /
    • 2001
  • We consider some guidance on specifying required dependability characteristics in product and equipment specifications, together with specifications of procedures and criteria for verification.

  • PDF

Design for Flight Control System Focused on Reliability (신뢰성 목표를 위한 비행제어 시스템 설계)

  • Kim, Sung-Su;Park, Choon-Bae
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.33 no.11
    • /
    • pp.33-40
    • /
    • 2005
  • The reliability of flight control system(FCS) for Unmanned Air Vehicle(UAV) is underestimated because of the design restrictions such as small size, low cost and light weight. However because the failure of FCS may cause the loss of aircraft, the reliability of FCS must be analysed and validated whether it meet the reliability requirements in design phase.In this paper the failure rate of subsystems was divided with its function based on the design experience of FCS. The redundancy models which satisfy the system reliability requirements were suggested. These results may be utilized in the hardware design of FCS.