• Title/Summary/Keyword: reliability methods

Search Result 4,812, Processing Time 0.032 seconds

Wafer Burn-in Method of SRAM for Multi Chip Package

  • Kim, Hoo-Sung;Kim, Je-Yoon;Sung, Man-Young
    • Transactions on Electrical and Electronic Materials
    • /
    • v.5 no.4
    • /
    • pp.138-142
    • /
    • 2004
  • This paper presents the improved bum-in method for the reliability of SRAM in Multi Chip Package (MCP). Semiconductor reliability is commonly improved through the bum-in process. Reliability problem is more significant in MCP that includes over two chips in a package, because the failure of one chip (SRAM) has a large influence on the yield and quality of the other chips - Flash Memory, DRAM, etc. Therefore, the quality of SRAM must be guaranteed. To improve the quality of SRAM, we applied the improved wafer level bum-in process using multi cells selection method in addition to the previously used methods. That method is effective in detecting special failure. Finally, with the composition of some kind of methods, we could achieve the high quality of SRAM in Multi Chip Package.

New Wafer Burn-in Method of SRAM in Multi Chip Package (MCP)

  • Kim, Hoo-Sung;Kim, Hwa-Young;Park, Sang-Won;Sung, Man-Young
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.53-56
    • /
    • 2004
  • This paper presents the improved burn-in method for the reliability of SRAM in MCP Semiconductor reliability is commonly improved through the burn-in process. Reliability problem is more significant in the Multi Chip Package, because of including over two devices in a package. In the SRAM-based Multi Chip Package, the failure of SRAM has a large effect on the yield and quality of the other chips - Flash Memory, DRAM, etc. So, the quality of SRAM must be guaranteed. To improve the quality of SRAM, we applied the improved wafer level burn-in process using multi cell selection method in addition to the current used methods. That method is effective in detecting special failure. Finally, with the composition of some kinds of methods, we could achieve the high qualify of SRAM in Multi Chip Package.

  • PDF

A Study on Reliability of Current Ultimate Strength Design for Reinforced Concrete (현행(現行) 철근(鐵筋)콘크리트 극한강(極限强) 설계법(設計法)의 신뢰성(信賴性)에 관(關)한 연구(硏究))

  • Lee, Bong Hak
    • Journal of Industrial Technology
    • /
    • v.2
    • /
    • pp.3-11
    • /
    • 1982
  • Reliability analysis methods have been employed in this study to determine the safety index ${\beta}$ for flexure associated with reinforced concrete designs that are in accordance with current USD code of Korea. In reliability analysis, the mean first-order second-moment methods are employed. The following specific conclusions can be drawn from this study; 1) Levels of safety for reinforced concrete design, measured by ${\beta}$, vary from 2.8 to 3.8 in flexure depending on the limit state, the ratio of live load to dead load and the uncertainties. 2) Target reliability ${\beta}$ associated with reinforced concrete beams in flexure is assumed to be 3.5~4.0 in Korea. 3) Load factors and resistance factors in flexure associated with the current provisions contained in USD code generally seem to be too high. The writer concluded the factors as following; ${\phi}=0.8,\;{\gamma}_D=1.1\;{\gamma}_L=1.75$.

  • PDF

A Case Study on Sensitivity Analysis of KHP Total Ownership Cost (KHP 총소유비용의 민감도 분석 사례 연구)

  • Byun, Hyung-Kyun;Lee, Sang-Woo;Kwon, Moon-Won;Kim, Joo-Kyun;Choi, Young-Hwan
    • Journal of Applied Reliability
    • /
    • v.11 no.2
    • /
    • pp.187-212
    • /
    • 2011
  • KHP project sets total ownership cost as the target cost by applying CAIV and administrates total ownership cost through compromise analysis, a periodical estimate and management of design alternatives for each development. Based on expected cost results, sensibility of total ownership cost is analyzed complying with the change of reliability, availability, maintainability and other related factors. By considering potential total ownership cost saving methods, first of all, this paper identifies total ownership cost changing effects for each related factor, secondly, suggests total ownership cost and maintenance and operating cost saving methods via finding components that affect total ownership cost and lastly, suggests total ownership cost saving directions that may be applied to other projects in the future.

Wafer Burn-in Method for SRAM in Multi Chip Package (Multi Chip Package의 SRAM을 위한 웨이퍼 Burn-in 방법)

  • Yoon, Jee-Young;Ryu, Jang-Woo;Kim, Hoo-Sung;Sung, Man-Young
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.18 no.6
    • /
    • pp.506-509
    • /
    • 2005
  • This paper presents the improved burn-in method for the reliability of SRAM in Multi Chip Package (MCP). Semiconductor reliability is commonly improved by the burn-in process. Reliability Problem is very significant in the MCP which includes over two chips in a package because the failure of one SRAM chip has a large influence on the yield and quality of the other chips such as Flash Memory, DRAM, etc. Therefore the quality of SRAM must be guaranteed. To improve the qualify of SRAM, we applied the improved wafer level burn-in process using multi cell selection method in addition to the previously used methods and it is found to be effective in detecting particular failures. Finally, with the composition of some kinds of methods, we achieved the high quality of SRAM in MCP.

Reliability Evaluation of Transmission Network of the KEPCO System(Kyongin and Yougdong Area) (KEPCO SYSTEM의 송전계통 신뢰도평가(경인,영동지역))

  • Moon, Seung-Pil;Kim, Hong-Sik;Wang, Jae-Myung;Lee, Chul-Hyu;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.34-37
    • /
    • 2001
  • This paper evaluate reliability indices of a part of transmission network of KEPCO system. Quantitative evaluation of transmission system reliability is very important because successful operation of an electric power system in the deregulated electricity market depends on transmission system reliability management. Monte Carlo methods are often preferable, when complex operating conditions are involved and/or the number of sever events is relatively large. Monte Carlo simulation methods and CMELDC(CoMposite power system Effective Load Duration Curve) were used in this paper.

  • PDF

Structural reliability estimation using Monte Carlo simulation and Pearson's curves

  • Krakovski, Mikhail B.
    • Structural Engineering and Mechanics
    • /
    • v.3 no.3
    • /
    • pp.201-213
    • /
    • 1995
  • At present Level 2 and importance sampling methods are the main tools used to estimate reliability of structural systems. But sometimes application of these techniques to realistic problems involves certain difficulties. In order to overcome the difficulties it is suggested to use Monte Carlo simulation in combination with two other techniques-extreme value and tail entropy approximations; an appropriate Pearson's curve is fit to represent simulation results. On the basis of this approach an algorithm and computer program for structural reliability estimation are developed. A number of specially chosen numerical examples are considered with the aim of checking the accuracy of the approach and comparing it with the Level 2 and importance sampling methods. The field of application of the approach is revealed.

Equitable Peer Assessment Method in Collaboration Project Using Statistical Technique (통계적 기법을 이용한 집단 협업 프로젝트에서의 공정한 동료 평가 방법론에 대한 연구)

  • Cho, Miyeon;Ko, Sung-Seok
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.1
    • /
    • pp.44-52
    • /
    • 2013
  • For evaluating participation in collaboration project, the peer assement method is mostly used and various scoring methods have been proposed. But, the reliability and validity of the peer assessment method are still doubted for all most method. In order to overcome these weaknesss, some guidelines and training methods have been recommended. In this article, however, statistical technique is proposed for measuring individual contributions to collaboration projects considering each assessor's reliability. The gist of our proposed algorithm is that an assessor's reliability depends on the evaluation policy, and this reliability is evaluated by an analysis of variance of the scores assigned by the assessor. We also show that the proposed method is very efficient by case study in university class.

Reliability Analysis of a System with Redundancy Management Based on Monte-Carlo Probability Model (다중구조관리자 특성이 반영된 확률모델 기반의 몬테카를로 신뢰도 해석 기법 연구)

  • Kim, Sung-Su;Park, Sang-Hyuk;Kim, Sung-Hwan;Choi, Kee-Young;Park, Choon-Bae;Ha, Cheol-Keun
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.17 no.11
    • /
    • pp.1132-1137
    • /
    • 2011
  • Critical systems with high reliability feature fault tolerant redundancy. Conventional analytical reliability analysis methods that use the Reliability Block Diagram do not adequately reflect characteristics of the redundancy management system and are not suitable for this applications. This paper uses Monte-Carlo method to calculate the reliability of complicated redundant systems. The method was first validated for cases with analytical solutions. Then, the tool was successfully applied to analyze reliability of the flight control systems with a voter as redundancy management system.

Bayesian Reliability Analysis Using Kriging Dimension Reduction Method (KDRM) (크리깅 기반 차원감소법을 이용한 베이지안 신뢰도 해석)

  • An, Da-Wn;Choi, Joo-Ho;Won, Jun-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.602-607
    • /
    • 2008
  • A technique for reliability-based design optimization(RBDO) is developed based on the Bayesian approach, which can deal with the epistemic uncertainty arising due to the limited number of data. Until recently, the conventional RBDO was implemented mostly by assuming the uncertainty as aleatory which means the statistical properties are completely known. In practice, however, this is not the case due to the insufficient data for estimating the statistical information, which makes the existing RBDO methods less useful. In this study, a Bayesian reliability is introduced to take account of the epistemic uncertainty, which is defined as the lower confidence bound of the probability distribution of the original reliability. In this case, the Bayesian reliability requires double loop of the conventional reliability analyses, which can be computationally expensive. Kriging based dimension reduction method(KDRM), which is a new efficient tool for the reliability analysis, is employed to this end. The proposed method is illustrated using a couple of numerical examples.

  • PDF