• Title/Summary/Keyword: reliability management plan

Search Result 262, Processing Time 0.031 seconds

Improvement Plan of Daily Work Accomplishment Index based Process Management based on Lean Construction Principles

  • Yoo, Dong Uk;Hong, Eun Hwa;Choi, Byung Sun;Chae, Myung Jin;Chun, Jae Youl
    • Architectural research
    • /
    • v.20 no.4
    • /
    • pp.147-152
    • /
    • 2018
  • As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.

Economic Reliability Group Acceptance Sampling Based on Truncated Life Tests Using Pareto Distribution of the Second Kind

  • Aslam, Muhammad;Mughal, Abdur Razzaque;Hanif, Muhammad;Ahmad, Munir
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.5
    • /
    • pp.725-731
    • /
    • 2010
  • Economic Reliability test plans(ERTP) are proposed considering that the life time of the submitted items follow the Pareto distribution of the second kind. For various specified acceptance number, sample size and producer's risk, a minimum test termination time is obtained. A comparison of proposed plan has been made with the existing plan developed by Aslam et al. (2010). The results are explained by tables and example.

Control strategies of energy storage limiting intermittent output of solar power generation: Planning and evaluation for participation in electricity market

  • Sewan Heo;Jinsoo Han;Wan-Ki Park
    • ETRI Journal
    • /
    • v.45 no.4
    • /
    • pp.636-649
    • /
    • 2023
  • Renewable energy generation cannot be consistently predicted or controlled. Therefore, it is currently not widely used in the electricity market, which requires dependable production. In this study, reliability- and variance-based controls of energy storage strategies are proposed to utilize renewable energy as a steady contributor to the electricity market. For reliability-based control, photovoltaic (PV) generation is assumed to be registered in the power generation plan. PV generation yields a reliable output using energy storage units to compensate for PV prediction errors. We also propose a runtime state-ofcharge management method for sustainable operations. With variance-based controls, changes in rapid power generation are limited through ramp rate control. This study introduces new reliability and variance indices as indicators for evaluating these strategies. The reliability index quantifies the degree to which the actual generation realizes the plan, and the variance index quantifies the degree of power change. The two strategies are verified based on simulations and experiments. The reliability index improved by 3.1 times on average over 21 days at a real power plant.

A Reliability Sampling Plan Based on Progressive Interval Censoring Under Pareto Distribution of Second Kind

  • Aslam, Muhammad;Huang, Syuan-Rong;Chi, Hyuck-Jun;Ahmad, Munir;Rasool, Mujahid
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.2
    • /
    • pp.154-160
    • /
    • 2011
  • In this paper, a reliability sampling plan under progressively type-1 interval censoring is proposed when the lifetime of products follows the Pareto distribution of second kind. We use the maximum likelihood estimator for the median life and its asymptotic distribution. The cost model is proposed and the design parameters are determined such that the given producer's and the consumer's risks are satisfied. Tables are given and the results are explained with examples.

Development of the Preventive Maintenance System for an Urban Transit (도시철도 차량을 위한 예방보전시스템 개발)

  • Ha, Seong-Hoon;Chang, Suk-Hwa;Yoo, Woo-Sik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.1
    • /
    • pp.1-7
    • /
    • 2007
  • This paper addresses a the maintenance system based on the concept of RAMS (Reliability, Availability, Maintenance, Safety) for the effective maintenance of the urban transit. A systematic approach for developing a cost-effective maintenance strategy based on the component reliability of the system in question is performed according to the following steps : definition of function, functional failures of the systems, construction of RBD (Reliability Block Diagram), and the calculation of reliability indices. The developed preventive maintenance system generates maintenance plan and repair request based on the analysed RAMS data of components and maintenance experience.

Certification and Assessment Plan of Dependability Management System IEC 60300 (신뢰성 경영시스템 IEC 60300의 인증 및 평가 방안)

  • 김종걸;김동철
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.103-114
    • /
    • 2004
  • IEC 60300 series, the international standards on reliability management system are newly developed and introduced rapidly worldwide. In order to meet this fast-changing situation, it is necessary to apply them to the Korean industries effectively. It includes the establishment of the infrastructure such as documentation of Korean Standards, introduction of test equipments and test manuals, accreditation of the certification bodies and training of the specialists etc. IEC 60300 is upgraded management system of the ISO 9000 and ISO 14000. In this regard, the Korean companies which were certified with the ISO 9000 or 14000 should endeavor to find new strategies and methods to be certified with IEC 60300. This paper introduces a Quantitative method of estimating the level of the reliability management system by applying the MIR(Maturity Index on Reliability) technique. This enables the estimation of the operation level of the system and can upgrade the maturity level of it.

A Time Truncated Two-Stage Group Sampling Plan for Weibull Distribution

  • Aslam, Muhammad;Jun, Chi-Hyuck;Rasool, Mujahid;Ahmad, Munir
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.1
    • /
    • pp.89-98
    • /
    • 2010
  • In this paper, a two-stage group sampling plan based on the time truncated life test is proposed for the Weibull distribution. The design parameters such as the number of groups and the acceptance number in each stage are determined by satisfying the producer's and consumer's risks simultaneously when the group size and the test duration are specified. The acceptable reliability level is expressed by the ratio of the true mean life to the specified life. It was demonstrated from the comparison with single-stage group sampling plans that the proposed plan can reduce the average sample number or improve the operating characteristics.

An Improved Group Sampling Plan Based on Time-Truncated Life Tests

  • Aslam, Muhammad;Pervaiz, Muhammad Khalid;Jun, Chi-Hyuck
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.3
    • /
    • pp.319-326
    • /
    • 2010
  • In this paper, a new group sampling plan for the lot acceptance is proposed for the time truncated life test, which can be utilized when multi-item testers are implemented. The design parameters are found using the two-point approach such that the producer's and consumer's risks are satisfied simultaneously at the acceptable reliability level and the lot tolerance reliability level, respectively. The case of Weibull distribution is described to illustrate the procedure that can be used when the quality level is expressed by a multiple of the specified life. The advantage of the proposed plan is demonstrated by comparing with the existing plan in terms of the sample size required. The tables are constructed and some examples are given to illustrate the procedure developed here.

Tightened-Normal-Tightened Group Acceptance Sampling Plan for Assuring Percentile Life

  • Aslam, Muhammad;Azam, Muhammad;Jun, Chi-Hyuck
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.4
    • /
    • pp.390-396
    • /
    • 2012
  • The present paper extends the idea of tightened-normal-tightened sampling scheme to group acceptance sampling plans under the time truncated life tests. We consider three famous distributions that are widely used in the area of reliability such as the generalized exponential distribution, the Weibull distribution, and the Birnbaum-Saunders distribution in the proposed sampling plan. The plan parameters are determined such that the producer's risk and the consumer's risk are satisfied at the specified median life. Extensive tables showing plan parameters are provided at various values of the experiment time and the consumer's risk for each of three distributions for the practical use. Some examples are given to illustrate the procedure of the proposed plan.

A Study on Actual Sanitary Management Conditions and Education Plan of School Foodservice Employees (학교 급식 조리 종사원의 위생 관리 실태와 위생 교육 방안에 관한 연구)

  • Um, Young-Ho
    • Culinary science and hospitality research
    • /
    • v.16 no.3
    • /
    • pp.237-249
    • /
    • 2010
  • The purpose of this study is to present an actual sanitary management conditions and an education plan for school foodservice employees. For assumption verification of this study, basis statistical analysis, factor analysis, and reliability analysis using SPSS V14.0KO were used. Also, regression analysis was conducted for it. The sanitary management actual conditions were shown that a foodservice practice level of middle and high schools was higher than elementary schools. In a scale way, sanitary management conditions of small group schools(500 students below) were lower than large group schools(500~1,000 students). Therefore, it was demanded especially for their employees to manage elementary schools and small group schools. It showed that sanitary consignment education was held irregularly at outside was more effective than the education was held regularly at inside. All the related workers at school foodservice should supply safe foods to schools through more effective sanitary education plan based on the results of effective actual sanitary management conditions.

  • PDF