• Title/Summary/Keyword: reinforcement countermeasure

Search Result 50, Processing Time 0.037 seconds

Model Test of Lining for Estimation of Tunnel Soundness (터널 건전도 평가를 위한 라이닝 모델실험)

  • Kim, Young Keun
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.59-71
    • /
    • 1999
  • Recently, many deformations in tunnel such as crack and leakage were occulted. Specially, the defects of tunnel lining have been a serious problem in safety and stability many repair works for maintenance in tunnel have been carried out. Therefore, it is necessary to estimate the structural cracking for countermeasure in deformed tunnel and to investigate on the characteristics of lining system and the soundness of tunnel. In this study model tests for tunnel lining were carried out using test apparatus and centrifuge, In the direct loading test, the prototype was Kyungbu high-speed railway tunnel and the scale is 1/10, and lining models were made of concrete. Test conditions included load conditions such as direction, shape and type, lining conditions such as single and double lining, thickness, and reinforcement. In centrifuge model test, the prototype was Seoul subway tunnel and the scale is 1/100, and lining models were made of aluminum and hydrostone. Test conditions included tunnel defects such as thickness shortage. behind cavity and longitudinal cracks, reinforcement methods such as epoxy, grouting and carbon sheet. From these model tests , the characteristics of deformation and failure for tunnel lining were estimated, and the structural behaviors of deformed lining and the effects of repair and reinforcement for tunnel lining were researched.

  • PDF

A Flood Damage Preventation and Permanent Restoration Method (수해 예방과 항구적인 복구 방안)

  • 구본충
    • Journal of the Korean Professional Engineers Association
    • /
    • v.32 no.6
    • /
    • pp.94-99
    • /
    • 1999
  • Recently, flood damage is rapidly increasing because of warming of globe, urbanization and industrialization. As a countermeasure to prevent these flood damages, it is quite required to extend the flood control ability by improving the objective rivers in the watershed and building more medium to large scale reserviors. Simultaneously repairing and rehabilitation of facilities through the safety diagnosis for reinforcement of the facilities should be continuously proceeded. Also extensive implementation of drainage improvement, establishment of prevention and refairing system against flood damage and raise of accuracy of weather forecasting should be proceeded.

  • PDF

A Case Study on Investigation Stability of Cut Slope in Road (국도와 인접한 절토부 사면안전성 대책에 관한 연구)

  • 이승호;임재승;정태영;신희순;이은동
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.45-52
    • /
    • 2003
  • Construction and extension of road by industrialization are increasing. According to this, construction of large cutting slope is increasing. Therefore, many methods for slope stability by this are applied. Failure happens according to dip and dip direction of slope. It is actuality that is connoting unstable element. This slope include coaly shale. Stability of slope failure this study takes place by road extension running examination for stability property calculate. Use this and examined stability about stereographic projection and wedge failure. Apply suitable reinforcement countermeasure about unstable cutting slope and analyzed stability. Wish to consider effective and robust processing plan of great principle earth and sand side securing stability. Hereafter with these data, is going to utilize in reinforcement and failure prevention.

  • PDF

A Case Study on the Slope Reinforcement Methods of Differential Weathering (심한 차별풍화의 사면 보강 시공 사례)

  • Jung, Jin-Gyo;Kim, Moon-Gyu;Oh, Myung-Ju;Oh, Myung-Soo;Ahn, Ji-Eun;Ku, Jun-Gee;Bae, Seung-Hyeon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1344-1350
    • /
    • 2008
  • The slope surface at a linking road construction from a geological stratum situation and a spot investigation weathering about the base rock. We became formation the slope to very disadvantageous base rock. A stability review result confirmed report of the slope were difficult and presented the stability countermeasure. We executed the slope to the purpose to augment safely.

  • PDF

Analysis of Patents regarding Stabilization Technology for Steep Slope Hazards (급경사지재해 안정화기술에 대한 특허분석)

  • Song, Young-Suk;Kim, Jae-Gon
    • The Journal of Engineering Geology
    • /
    • v.20 no.3
    • /
    • pp.257-269
    • /
    • 2010
  • We analyzed patent trends regarding stabilization technology for steep slope hazards, focusing on patents applied for and registered in Korea, the USA, Japan, and Europe. The technology was classified into four groups at the second classification step: prediction techniques, instrumentation techniques, countermeasure/reinforcement/mitigation techniques, and laboratory tests. A total of 2,134 patents were selected for the final effective analysis. As a result of portfolio analysis using the correlation between the number of patents and the applicant for each patent, the Korean and USA situations were classified as belonging to the developing period, and the Japanese and European situations were classified as belonging to the ebbing period. In particular, patent activity in Korea has been enlivened by government-led research. As a result of technology analysis at the second classification step, prediction techniques arising from Japan are evaluated as a competitive power technique, and laboratory tests arising from the USA are evaluated as a competitive power technique. However, prediction techniques and laboratory tests arising from Korea are evaluated as a blank technique. According to the prediction results regarding future research and developments, a new finite element analysis method and a numerical model should be established as part of prediction techniques, as well as sensors, and hazard prediction should be developed by integrating information and equipment using IT technology as part of instrumentation techniques. In addition, improvements to existing structures for erosion control and the development of new slope-reinforcement methods are required as part of countermeasure/reinforcement/mitigation techniques, and new laboratory apparatus and methods with an optimizing structure should be developed as part of laboratory tests.

A Study on a Countermeasure Program using the Martial Arts for a Security Guard Caused by an Accidental Situation (우발상황시 경호무도 대응방안)

  • Park, Jun-Seok;Kang, Young-Gil
    • Korean Security Journal
    • /
    • no.6
    • /
    • pp.327-340
    • /
    • 2003
  • As a countermeasure under accidental occurrence situation, First, as application form of martial arts, A security guard foster ability that can protect a target person of guard and own body under accidental occurrence situation through incessant martial arts practice. To achieve this purpose, incessant training mental power and physical strength reinforcement should be kept on to prevent, therefore make a safety control function for such as weapon, small arms, explosive, vehicles terror etc. happened under accidental occurrence situation. Second, according to the contents of training based on the classification category of martial arts for security guard under accidental situation, a security guard must keep safety distance necessarily lest a target person of gurad should be attacked by attacker, therefore, intercept an attack opportunity if a safety distance between a target person of guard and attacker is not kept. Third, It is to practice confrontation techniques based on the type of attack. A security guard must develp situation disposal ability that can cope properly with the attack using empty hands, murderous weapon, small arms, explosive by case or individual or mass of threat that impose danger and injury in a target person's body of guard.

  • PDF

Study on the Geological Characteristics and Slope Stability of Nammyeon reservoir in Bonghwa County, Kyungpook Province (경북 봉화군 남면저수지 일대의 지질특성 및 비탈면 안정성 검토)

  • Ihm, Myeong Hyeok;Park, Jin Young
    • Tunnel and Underground Space
    • /
    • v.27 no.2
    • /
    • pp.77-88
    • /
    • 2017
  • The geology of the study area is composed mainly of conglomerate, sandstone, and shale and basalt. It is a rock that has been observed to move relatively recently through various brittle deformation and various stress fields during the recent period. To form a gentle terrain with severe crushing. The slope is located at the intersection of the Taegok Fault in the north-northeast direction and the Bukok Fault in the western north-west direction, and many faults, fault zones and fracture zones of various sizes are developed in the rock bed. In this study, the geological characteristics of the slope are investigated and the countermeasure method is suggested. It is suggested that periodical measurement and analysis should be performed by installing a measuring instrument according to each structure for safety management of the surrounding roads and grounds during construction or reinforcement by the countermeasure method for the slope of the study area.

Earthquake Design and Reinforcement Countermeasure for Transmission Line and Substation (송변전설비의 내진설계 및 보강대책)

  • Min, Byeong-Wook;Kim, Kang-Kyu;Han, Byung-Jun;Park, In-Joung;Kim, Young-Dal
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.432-433
    • /
    • 2011
  • Even though Korea has very low possibility that a big earthquake occurs like in Japan, China, Taiwan and United States of America, because it is located on the interior of Eurasian Plate, the earthquake which was struck northeast Japan in March 11th, 2011 gave a big shock to Korean. And small-medium earthquakes have been observed 922 times in Korea since 1978 when an earthquake hit Hong-seong and a seismographic station started observation. Moreover, the number of quakes has been on the increase. In case a big earthquake occurs like in northeast Japan, it would be a terrible disaster for Korean power utilities and brings mega effects on Korean society and economy. So it is necessary to apply anti-earthquake design for new power facilities and to reinforce existing facilities. Therefore, this paper would present anti-earthquake design for transmission line and substation and reinforcement measures for existing facilities.

  • PDF

Behavior of Seepage and Seismic for the Deterioration Reservoir Using Numerical Analysis (수치해석에 의한 노후저수지의 침투 및 동적거동)

  • Park, Sung-Yong;Chang, Suk-Hyun;Lim, Hyun-Taek;Kim, Jung-Meyon;Kim, Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.3
    • /
    • pp.81-90
    • /
    • 2016
  • It is significant to redevelop the deterioration reservoir through raising for countermeasure to climate change and Earthquake improvement of reservoir. This study aims to investigate the behavior of deterioration reservoir with poor-fabricated core subjected to raising water level and earthquake using numerical analysis. From the analysis results, water level raising and earthquakes induce crack and subsidences at the crown and the front side of deterioration reservoir. For the reinforcement of the deterioration reservoir is required appropriate measures method and raised method suitable, drainage and slope protection method judged to be necessary.

A Comparative Study on the Repair Performance of Concrete Crack (콘크리트 균열 보수성능에 관한 비교 연구)

  • 박성우;윤성훈
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.817-822
    • /
    • 2002
  • The problem of the crack which occures from the reinforced concrete structure could be caused by the complexed factors. When the crack happen, it caused fatal blemish to manage and maintain the structure such as structural problem, licking, spalling, viewing Even though they study and work hard to solve this kind of problem in the world, there are no countermeasure for perfect prevention of crack. After the crack checked out, a method of repair-reinforcement has been studied and operated actively, Generally, occurance of the crack in the concrete structure could be taken as granted, no need to mention the damage from the crack, domestic construction try to hide it rather than repair basically, In many cases the construction amount for repairing the crack has to be made in the construction area and the amount is very expensive. To save the repaing fee, companys repair it under the meeting of their desire. it can be expected for the effection of the construction. For this reason, we compare a new injection method to solve the demerits of the present method, to save and use the merit of the present method.

  • PDF