A Case Study on the Slope Reinforcement Methods of Differential Weathering

심한 차별풍화의 사면 보강 시공 사례

  • Published : 2008.03.28

Abstract

The slope surface at a linking road construction from a geological stratum situation and a spot investigation weathering about the base rock. We became formation the slope to very disadvantageous base rock. A stability review result confirmed report of the slope were difficult and presented the stability countermeasure. We executed the slope to the purpose to augment safely.

Keywords