• Title/Summary/Keyword: railway platform

Search Result 201, Processing Time 0.028 seconds

Development and Performance Test Results of a Segmented Scissors Type Switch for the Urban Maglev (도시형 자기부상열차 시저스분기기 개발현황과 성능시험결과)

  • Lee, Jong-Min;Park, Doh-Young;Han, Hyung-Suk;Kim, Chang-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3180-3186
    • /
    • 2011
  • A segmented scissors type switch has been developed for the urban transit maglev demonstration line to be commercialized near Incheon International Airport in 2013. Based on the design of the previous segmented 3-way switch, the scissors switch is composed of four segmented 2-way switches up/down and left/right and a turn table in the mid point. The main function of the scissors switch is to change the running direction of the train at end terminals. The developed scissors switch is planned to be installed in front of the 102 station, which has a side platform, of the demonstration line. The total length of the switch is 65m and the distance between the up and down track centerlines is 6m. The 2-way switches and turn table are made of steel box type beams, and have their own driving unit, locking unit, control unit, levitation and propulsion rails, and so on. Installed in the factory, a 100,000-cycle continuous operation test was carried out after manual and automatic test operations. The applicapability of the developed switch was verified through the measurements of the linearity of the track after repetitive operations, the mechanical operation noise, the load of the main driving motor, the safety of the control panel, the natural frequency of the girder, the deformation of the girder, and so on.

  • PDF

Validation of Availability, Maintainability and Safety for Subway Elevating Equipment (도시철도 승강설비의 가용성, 유지보수성 및 안전성 입증)

  • Lee, Hwan-Deok;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.16 no.4
    • /
    • pp.272-279
    • /
    • 2016
  • Purpose: In order to fulfill the RAMS (Reliability Availability Maintainability and Safety) requirements in Korean railway systems, specific target metrics should be measured and met the requirements when ordering a new system. This paper presents a procedure to predict and demonstrate the availability, maintainability and safety of subway elevators, escalators and PSD (platform screen doors) systems. Methods: The system manufacturer predicts availability and maintainability with lab and field tested data. After installation, availability and maintainability are demonstrated based on the actual operational data. The data was collected from the FRACAS (Failure Report and Corrective Action System). Results: Methods and process of assessing and analyzing the availability, maintainability and safety are presented for elevating services and PSD systems. The data obtained through the actual operation of the equipment is analyzed and maintained to predict the RAMS based on the component and system level failure data acquired. Conclusion: This study presented an application using IEC 62278 and operational data which can be used in the design and development stage to achieve the RAMS target value of the subway elevators, escalators and PSD systems.

Railway Undercrossing Construction Method for the Shindorim Station Platform Extension (신도림 역사 확장을 위한 철도횡단 건설공법 검토)

  • Yoo, Je-Nam;Koo, Ja-Kap;Lee, Hee-Yung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.887-890
    • /
    • 2008
  • Shindorim Station is the most important transfer station which is crossed Seoul Metro Line-2 and national rail traffic Kyungbu, Honam and Kyungin Line etc.. There is the lagest transfer passengers and the greatest rail traffic. Therefore to solve the congeted station problem, Shindorim station extension project has been planned. This project has very difficult many problems. One of them is undercrossing the national rail traffic ground without open-cut excavation. There are many undercrossing construction methods in our country. But this project is required the best safety. So the best applicable methods are investigated, which are Front-Jacking, NTR and TRcM. In Design stage Front-Jacking with PRS method which is gound reinforcing is applied.

  • PDF

A Study on Improvement of PSD Interface Using 2.4GHz Wireless Communication, (2.4GHz 무선 통신을 이용한 PSD 인터페이스 개선에 관한 연구)

  • Kim, Jae-Pil;Hyun, Yong-Sub;Chang, Kyong-Song
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1408-1415
    • /
    • 2007
  • To operate Platform Screen Door (PSD) automatically, the operational data of PSD and the train must be interfaced properly. PSD and train are operated together by the signaling system in Automatic Train Operation (ATO) signaling system zone where interfaces are provided between PSD and train. However, the additional PSD interface system with train is required in train operating zone without the interface between PSD and train. For the PSD interface, the wireless communication system or the train status (train correct stop status / train door status) detection system has been used. Seoul Metro line No.2. has the PSD wireless communication system using 447MHz band RF. For the safety of PSD operation, it is required to prevent RF interference in the subway environment where many frequencies exist. In this paper, the PSD wireless communication system is developed using 2.4GHz band RF to prevent the interference of the wireless communication and increase the traffic of the PSD interface. Furthermore, the improved system can store, manage and display the PSD and train operational data using Human Machine Interface (HMI) in the train's driver cab.

  • PDF

Development of the Virtual Driving Environment for the AWS ECU Test Platform of the Bi-modal Tram (저상굴절 궤도차량의 AWS ECU 테스트 플랫폼을 위한 가상 주행환경 개발)

  • Choi, Seong-Hoon;Park, Tea-Won;Lee, Soo-Ho;Moon, Kyung-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.283-290
    • /
    • 2007
  • A bi-modal tram has been developed to offer an advanced transportation service compared with existing vehicles. The All-Wheel-Steering system is applied to the bi-modal tram to satisfy the required steering performance because the bi-modal tram has extended length and articulated mechanism. An ECU for the steering system is essential to steer wheels on 2nd and 3rd axles by the specific AWS algorithm with the prescribed driving condition. The Hardware-In-the-Loop Simulation(HILS) system is planned for the purpose of evaluating the steering system of the bi-modal tram. There are kinematic links with the hydraulic actuator to steer wheels on each 2nd and 3rd axles and also same steering mechanism as the actual vehicle is in the HILS system. Controlling the movement of hydraulic actuator which reflects the lateral steering reaction force on each wheel is the key to realize the HILS system, but the reaction force is continuously changed according to various driving conditions. Therefore, the simulation through the multi-body dynamics model is used to obtain the required forces.

  • PDF

Experimental Study of Vibration and Noise Reduction Effect of Railroad Vibration Isolator (철도레일 방진 체결장치의 진동 및 소음 저감 효과에 관한 실험적 연구)

  • Lee, Jang-Hyun;Kim, Tae-Eon;Lee, Seong-Choon;Chon, Ik-Pom
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.1373-1378
    • /
    • 2000
  • Vibration caused by railroad vehicle including subway train running raises a lot of problems to the neighboring buildings. Therefore lots of methods to isolate the railway vibration have been studied and practically applied to sites. As one of them, specially designed vibration isolation device was installed in the some section of Seoul subway. This device is installed between the rail and track slab. Because the process of installation is relatively simple, this method can be applied to the existing railways in servicing. We measured the vibration and noise to check the effectiveness of this device before and after the installation. The result showed that the vibration level of the slab and platform was reduced to 7 - 10 dB. Expecially high frequency component was reduced to a large amount. From this result, we can conclude that these kind of devices are useful to the reduction of the railroad vibration, expecially the high frequency vibration which can cause structure born noise.

  • PDF

Estimation of Crowd Density in Public Areas Based on Neural Network

  • Kim, Gyujin;An, Taeki;Kim, Moonhyun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.6 no.9
    • /
    • pp.2170-2190
    • /
    • 2012
  • There are nowadays strong demands for intelligent surveillance systems, which can infer or understand more complex behavior. The application of crowd density estimation methods could lead to a better understanding of crowd behavior, improved design of the built environment, and increased pedestrian safety. In this paper, we propose a new crowd density estimation method, which aims at estimating not only a moving crowd, but also a stationary crowd, using images captured from surveillance cameras situated in various public locations. The crowd density of the moving people is measured, based on the moving area during a specified time period. The moving area is defined as the area where the magnitude of the accumulated optical flow exceeds a predefined threshold. In contrast, the stationary crowd density is estimated from the coarseness of textures, under the assumption that each person can be regarded as a textural unit. A multilayer neural network is designed, to classify crowd density levels into 5 classes. Finally, the proposed method is experimented with PETS 2009 and the platform of Gangnam subway station image sequences.

PSD Door Response Time Improving Method in Train Manual Operation Mode (수동운전방식에서의 PSD 출입문 신호반응 시간 개선 방안 연구)

  • Lee, Moo-Ho;Kim, Chan-Cum;Lee, Suk-Jong;Lee, Soo-Young
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.559-571
    • /
    • 2008
  • Platform Screen Door(PSD) has been installed and operated at seoul subway line $1\sim4$ in the manual train operation mode(ATS/ATC) by SeoulMetro since 2005. SeoulMetro uses the wireless (RF) communication system and the train door detection system for the link between the train and PSD doors opening/closing motion in the manual train operation mode. For the convenience and safety of passengers, the train doors and the PSD doors opening/closing shall be synchronized as much as possible. In ATO(Automatic Train Operation) mode which provides the interface between train control system and PSD system, ATO signaling system makes the train doors and PSD doors open/close command signals systematically, so PSD doors can be opened/closed almost simultaneously with the train doors. But, in the manual train control(ATS/ATC) mode, PSD system needs to detect the train doors open/close operation and make PSD open/close command signals to actuate PSD doors. These PSD open/close commanding process cause time delay of PSD doors opening/closing motion in response to the train doors opening/closing motion. Sometimes the response delay time can be over 1 second, which is not proper to operate PSD, and need to be reduced This paper presents the reduction method of the PSD response delay time to improve the convenience and safety of passengers.

  • PDF

A Study on PSD System optimization from manual mode (수동 Mode에서 PSD System 최적화 연구)

  • Son Young-Jin;Min Kyung-Yun;Lee Kang-Won;Bang Yeun-Gun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.162-167
    • /
    • 2004
  • The ascent and descent market screen door (PSD-Platform Screen Door) between the electromotive car which is in the process of operating from the subway ascent and descent market and the passenger it is an immediacy and crisis as the system which it intercepts currently the inside and outside of the country of course signal system automatic operation signal system (ATO) establishment is operated from the segment. Manual operation signal system (the ATS and the ATC) almost it is a condition which is wholly lacking from the segment. This year from second half of the year 2 line manual operation signal system (ATS). It established the shutting tightly elder brother and the railing elder brother in PSD system in segment 12 reverses and the death accident due to the passenger hurt accident which occurs from the subway. It prevented an energy curtailment in the same time when it raises air cooling efficiency, It gathered it restricted the underground space which is comfortable in the use citizen and and and service it did interface the electromotive car and PSD entrance and exit literature course from the manual operation segment to sleep technically optimizationt. It researched a minute dust diffusion.

  • PDF

A Study on the Optimal Divergence Spacing of the Connecting Grounding Rod to the Dangerous Voltage in the Global Earthing Network of Urban Rail Transit (도시철도 통합접지망에서의 위험전압에 따른 연접접지봉의 최적 분기간격에 관한 연구)

  • Jung, Ho-Sung;Park, Young;Kim, Hyeng-Chul;Kim, Jin-Hee;Kim, Jae-Moon;Cho, Dae-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1374-1379
    • /
    • 2012
  • Urban rail transit tends to global grounding system in order to control ground potential rise and potential differences between electric equipments. In addition, global grounding system can discharge the large capacity surge current to the ground safely. Since some railway electric equipments are installed all section of line, the global grounding system connected with the connecting grounding wire is more effectively. However, if the fault occurred in the connecting grounding wire area, some dangerous voltage is generated. So, the installation of additional grounding rod will be required. In this study, the global grounding system is simulated using CDEGS program to analyze the divergence spacing of additional ground rod depending on dangerous electric potential characteristics. Grounding net of the each station is modelled in depending on the size of the platform, and the spacing of the connecting grounding rod are compared 50m, 100m, 250m and 400m. Simulation results considering of earth resistivity and underground condition of the connecting grounding wire, spacing of the connecting grounding rod is that less than 250m to spacing of the ground rod was appropriately confirmed.