• Title/Summary/Keyword: railroad construction project

Search Result 79, Processing Time 0.027 seconds

A Study on the Improvement of Project Management System for International Competitive Power and Global Business Strategy of Rail Project (철도사업의 종합사업관리 국제경쟁력 강화방안에 대한 연구)

  • Lee Young-Joo;Jang Seong- Yong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1595-1600
    • /
    • 2004
  • High speed railroad project management has been almost completed by starting operation of Seoul-Busan high speed railroad with the exception of a few constructing blocks currently in April, 2004. After Korea Rail Network Authority was established in 2004, it needs to develop new project management system for both conventional railroad construction and high speed railroad construction for domestic railroad projects, while it plans to invest in overseas railroad project for logistics innovation and improvement in passenger transport services on a large scale. Therefore this paper provides the method that we can adapt the project management system for high speed railroad containing experiences and know-how from construction of high speed railroad for both conventional railroad construction and high speed railroad construction or improve project management system for high speed railroad to use it as project management system for overseas railroad projects.

  • PDF

The Analysis of Railroad Operating Costs in Korean Railroad Projects

  • SungWook KANG;DongHee KIM;GyuBae KIM
    • East Asian Journal of Business Economics (EAJBE)
    • /
    • v.12 no.1
    • /
    • pp.35-42
    • /
    • 2024
  • Purpose: A railroad project is a complex system with large construction costs in the initial stage and ongoing operating costs over its lifecycle. Current railroad projects tend to be based on construction options, which leads to huge deficiencies in operating costs. This phenomenon results from a lack of appropriate tools to accurately estimate a railroad project's lifecycle costs. This study attempts to analyze the major components of railroad operating costs and to propose a decision-making system for analyzing the long-term lifecycle costs of railroad projects. Research design, data and methodology: We review the literature and analyze the current status of railroad operating costs in Korea and overseas. Based on previous projects, a framework for project options and operating costs is proposed. The framework is applied to actual railroad projects to demonstrate the validity of the model. Results: Case analysis shows that our framework is comprehensive in analyzing the primary aspects of railroad operating costs and plays an effective role in choosing various railroad project options. This study points out that the railway project operates inefficiently because estimating long-term costs without reflecting specific project options causes many errors. Conclusions: A major contribution of this study is the development of an improved framework for accurately estimating operating costs and providing policymakers and engineering firms with a holistic decision support system. Detailed components in estimating operating costs of the railroad business are discussed. And we present a decision-making tool that policymakers and private businesses can use in planning the railroad business.

A Study on the Accident Case and Analysis on the Actual Condition of Construction Machinery in Railroad Construction Sites (철도건설현장 건설기계 재해사례 및 실태분석에 관한 연구)

  • Son, Du-Hyun;Song, Do-Heom;Go, Seong-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.20-28
    • /
    • 2015
  • Recently, railroad's preference greatly increased as the environment-friendly means of transportation as the importance in the aspects of environment and energy efficiency. So the government established the Korea Rail Network Authority which takes full charge of railroad construction in 20047 for regular railroad construction to combine major key points in the whole country with each other to be one city region by connecting them to each other to be within the commute time range of a hour and thirty minutes. And it has arranged large-scale railroad construction by establishing plans to build the 1st and 2nd national railroad networks as the national project and investing about 100 trillion won in it from 2006 to 2020. As large-scale railroad construction is promoted as the national project like this, there has been a string of safety accidents in it due to the large and complex construction project. As the government strengthened the safety accident prevention plans, safety accidents have tended to decrease in 2011. However, accidents of construction machinery have found to increase. Therefore, this study tried to investigate accident cases of the Korea Rail Network Authority for the recent 5 years and analyze accidents of construction machinery to prevent them in railroad construction sites and suggest accident prevention plans due to it by conducting, investigating, and analyzing the survey of its operators and superintendents of the construction sites and drawing the problems.

Development of Planning Method for Double-Tracking of Single Track Railroad based on the Intelligent Rail Alignment Planning Program (ei-Rail) (지능형철도선형계획 프로그램(ei-Rail) 기반의 단선철도 복선화 계획 기술개발)

  • Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.837-842
    • /
    • 2022
  • The "Intelligent Railroad Alignment Design Program (ei-Rail) developed in 2013 has been adopted in the planning and the evaluation/validation of design results of oversea railroad construction projects. Target countries of Korean railroad industries requires the operating speed increase with alignment improvement and the double tracking of prevailing single track railroads as well as new railroad construction. This study is to develop an additional module for double tracking project of prevailing single track railroads in the ei-Rail. The developed method is based on the geometrics of prevailing railroad, and the definition of planned project determines the project cost based on the unit cost by work type, and provides the draft design of double track. The module was validated with a oversea case. It is then expected for oversea railroad double tracking project more efficiently in planning and the evaluation of design results.

Benefits of Early Stakeholder Involvement in Korean Railway Infrastructure Project

  • KANG, SungWook;KIM, DongHee;YU, JaeKyun;LEE, KyungChul;MOON, DaeSup
    • The Journal of Economics, Marketing and Management
    • /
    • v.9 no.5
    • /
    • pp.15-25
    • /
    • 2021
  • Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.

A Railway Construction Efficiency Plan by Using Project Management Information System (프로젝트정보관리시스템을 활용한 철도공사 효율화 방안)

  • Lee, Tai-Sik;Park, Jang-Hee;Kim, Young-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1532-1537
    • /
    • 2004
  • Downtown traffic culture of the car focus of our country have developed. But, it was been interested in railroad to saturation of situation, environmental problem. Also, it is getting interest which is international by departure point of network connecting from Europe to Northeast Asia. Private capital project of railroad is activated but Construction companies payability is real that is worsen day by day. Therefore, Construction companies is destroying element enterprise's inefficiency and the waste, be interested in Project Management Information System as part of information. I wish to approach in efficiency of railway construction by presenting professional construction company's Project Management Information System.

  • PDF

The DB structure for Standard Criteria of Urban Transit Facilities (도시철도시설 표준화기준을 위한 DB구축방안 연구)

  • Lee, Woo-Dong;Kim, Jin-Ho;Han, Seok-Youn;Sin, Won-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2008.10c
    • /
    • pp.213-214
    • /
    • 2008
  • Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.

  • PDF

Construction of verification process for the railway total safety technology development project (철도종합안전기술개발사업의 성과물 검증 프로세스 구축)

  • Yoon, Hyuk-Jin;Han, Soon-Woo;Kim, Sang-Ahm;Choi, Kyung-Jin;Cho, Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1187-1192
    • /
    • 2007
  • Recently, many organizations such as, including government, railroad operational, railroad facilities managemental and research authorities have made a lot of efforts to identify and prevent hazards from leading to accidents and solve them all over the railroad industry. Railroad total safety technology development project conducted as one of national R&D projects has established business formation structure based on system engineering as an effort to define and give a solution to facing problems in the field of railroad. This paper is building procedures to verify the outcomes derived from this project. The verification process is the one for verifying the outcome produced in the final stage of the project or during the project. It makes sure that the system is satisfying the system requirements through verification of the outcomes produced after conducting the project for verification. We've made verification plan for technically reasonable verification using verification process developed through this research, and established master verification plan in the level of 15 detailed projects for interim and final outcomes produced.

  • PDF

Automation technology for analyzing 3D point cloud data of construction sites

  • Park, Suyeul;Kim, Younggun;Choi, Yungjun;Kim, Seok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1100-1105
    • /
    • 2022
  • Denoising, registering, and detecting changes of 3D digital map are generally conducted by skilled technicians, which leads to inefficiency and the intervention of individual judgment. The manual post-processing for analyzing 3D point cloud data of construction sites requires a long time and sufficient resources. This study develops automation technology for analyzing 3D point cloud data for construction sites. Scanned data are automatically denoised, and the denoised data are stored in a specific storage. The stored data set is automatically registrated when the data set to be registrated is prepared. In addition, regions with non-homogeneous densities will be converted into homogeneous data. The change detection function is developed to automatically analyze the degree of terrain change occurred between time series data.

  • PDF

An Way of Training Railroad Civil Engineers in Relation to NURI Project (지방대학혁신역량 강화사업(NURI)과 연계한 철도시설 토목인력 양성 방안)

  • Hung Chan-Mook;Oa Sung-Wok
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1514-1518
    • /
    • 2004
  • Korea became the 5th country by opening the Kyungbu-Highspeed Railway in April of 2004, which has contributed to technical innovations and motivated to increase SOC investment for the Railroad facilities. This increase of Railroad facilities will need the many railroad civil engineers who are in charge of construction and maintenance. Moreover, we need more qualitative engineers to catch up with the speed of technical renovation and to play an important role in exporting our railroad technique to outside country such as China, and Russia. In this paper, a new alternative of training railroad civil engineers will be investigated in relation to NURI Project, which is sponsored by Ministy of Education.

  • PDF