DOI QR코드

DOI QR Code

A Study on the Accident Case and Analysis on the Actual Condition of Construction Machinery in Railroad Construction Sites

철도건설현장 건설기계 재해사례 및 실태분석에 관한 연구

  • Son, Du-Hyun (Department of Architectural Engineering, Graduate School, Chonnam National University) ;
  • Song, Do-Heom (Deparment of Architecture, Chosun College of Science & Technology) ;
  • Go, Seong-Seok (Department of Architectural Engineering, Graduate School, Chonnam National University)
  • 손두현 (전남대학교 대학원 건축공학과) ;
  • 송도흠 (조선이공대학교 건축과) ;
  • 고성석 (전남대학교 대학원 건축공학과)
  • Received : 2015.04.07
  • Accepted : 2015.07.09
  • Published : 2015.10.31

Abstract

Recently, railroad's preference greatly increased as the environment-friendly means of transportation as the importance in the aspects of environment and energy efficiency. So the government established the Korea Rail Network Authority which takes full charge of railroad construction in 20047 for regular railroad construction to combine major key points in the whole country with each other to be one city region by connecting them to each other to be within the commute time range of a hour and thirty minutes. And it has arranged large-scale railroad construction by establishing plans to build the 1st and 2nd national railroad networks as the national project and investing about 100 trillion won in it from 2006 to 2020. As large-scale railroad construction is promoted as the national project like this, there has been a string of safety accidents in it due to the large and complex construction project. As the government strengthened the safety accident prevention plans, safety accidents have tended to decrease in 2011. However, accidents of construction machinery have found to increase. Therefore, this study tried to investigate accident cases of the Korea Rail Network Authority for the recent 5 years and analyze accidents of construction machinery to prevent them in railroad construction sites and suggest accident prevention plans due to it by conducting, investigating, and analyzing the survey of its operators and superintendents of the construction sites and drawing the problems.

Keywords

References

  1. Ministry of Land, Infrastructure and Transport, "Second Nati-onal Railway Construction Plan (2011-2020year)", pp.12-38, 2011.
  2. K. C. Shin, "A Study on Improving Safety Management of the Heavy Equipment Operations in Construction", The Graduate School of Construction Chung - Ang University, pp.25-67, 2002.
  3. J. S. Kim, "Research on Causes of Accidents, Their Effects, and Preventive Measures in Railroad Industry in Korea", The Business School in Hannam University, pp.46-76, 2009.
  4. K. G. Lee, "A Study on the Improvement of Railway Construction Site Safety Management System", Department of Industrial Safety Engineering, Graduate School of Chosun University, pp.38-59, 2012.
  5. Y. M. Kim, "A Study on the Methods of Reducinging the Safety Accident Based on the Case of Railway Accidents", The Graduate School of Railroad Transportation Woo - Song University, pp.22-43, 2013.
  6. Korea Rail Network Authority, "Railway Construction Site Accident Casebook (2002-2013 year)", pp.20-56, 2014.
  7. Ministry of Employment and Labor, "Analysis of Industrial Accidents in 2012 " pp.24-40, 2013.
  8. KOSHA, "2012 Industrial Accident Cause Investigation (Work - Related Accidents)", pp.8-23, 2013.
  9. Korea Rail Network Authority, "Construction Machinery Safety Management Manual", pp.14-21, 2012.
  10. KOSHA,"Construction Machinery Safety Standard Work Instructions", pp.20-50, 2005.
  11. Korea Rail Network Authority, "Railway Safety Management Regulations", pp.31-43, 2012.