• Title/Summary/Keyword: qualification and acceptance test

Search Result 26, Processing Time 0.022 seconds

Analysis of revised regulatory guidance on electromagnetic interference qualification for nuclear safety

  • In Beom Ahn;Jaeyul Choo ;Jae Yoon Park ;Hyunchul Ku ;Kyeong-Sik Min
    • Nuclear Engineering and Technology
    • /
    • v.55 no.3
    • /
    • pp.870-875
    • /
    • 2023
  • In this paper, we analyzed the revised guidance on electromagnetic (EM) interference qualification of Regulatory Guide 1.180 (Revision 2), which is published by the U.S. Nuclear Regulatory Commission for electromagnetic compatibility qualification for nuclear safety, by comparing it with that of the previous version. We confirmed that the test methods and the acceptance criteria of both CE101 and CE102 tests for conductive emission and RE102 test for radiating emission are changed in the recently revised Regulatory Guide 1.180 (Revision 2). Furthermore, we found that the revised Regulatory Guide 1.180 provides flexibility in the use of alternative methods for EM interference (EMI) qualification, in that a mix of the various base-standards is technically allowed. In addition, the primary revision of the updated Regulatory. Guide 1.180 is that MIL-STD-461G is to be adopted as the latest base-standard, instead of MIL-STD-461E. To evaluate the influence on EMI qualification for nuclear safety due to the endorsement of MIL-STD-461G, we thoroughly analyzed the modifications in the acceptance criteria and test methods for EMI qualification, and then validated the analyzed effect on the EMI qualification, which is caused by the revision of MIL-STD-461, by performing electromagnetic simulation for equipment under RE102 test.

The Effect of Shape Parameters in Designing Reliability Qualification Test for Weibull lifetime distribution (와이불수명분포를 갖는 제품의 신뢰성인증시험에서 형상모수의 영향분석)

  • Kwon, Young-Il
    • Journal of Applied Reliability
    • /
    • v.11 no.3
    • /
    • pp.225-234
    • /
    • 2011
  • In the fields of reliability application, the most commonly used test methods for reliability qualification are zero-failure acceptance tests since they require fewer test samples and less test time compared to other test methods that guarantee the same reliability with a given confidence level. Usually values of shape parameters are assumed to be known in designing reliability qualification tests for Weibull lifetime distribution. It is important to select correct values of shape parameters to guarantee the specified reliability with given confidence level exactly. The effect of using wrong values of shape parameters in designing reliability qualification test for products with Weibull lifetime distribution is examined and selecting proper values of shape parameters for conservative reliability qualification is discussed.

Study of the Qualification Test Procedure for the General Avionic Computer for Aircraft (항공기용 임무 통제 컴퓨터(General Avionic Computer)의 품질인증시험절차 수립에 관한 연구)

  • Jo, Jang-Hyen
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.4 no.2
    • /
    • pp.119-125
    • /
    • 2001
  • This paper discuss the Qualification Test Procedure which is composed of main functional and environmental tests for the localizing avionics and subsystems, especially the detail test approaches of General Avionics Computed(GAC) through the analysis of related technical data packages for the purpose of performance proof of final products. Quality assurance procedures are properly established with the several kinds of inspections and functional test items. They are called as process inspections, functional test, acceptance test procedure and qualification test procedure. The Qualification test procedure are composed of the analysis of original engineering design concept and shall be performed for the acquisition of the certification of the GAC's quality as well as the aquisition of the related techniques and engineering know-how items.

  • PDF

Integration, Verification, Qualification Activities for KASS System (KASS 시스템 통합 및 검증 활동)

  • Hwanho Jeong;Minhyuk Son;ByungSeok Lee
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.6
    • /
    • pp.782-787
    • /
    • 2023
  • Korea augmentation satellite system (KASS) integration, verification, qualification (IVQ) activity is verification of requirements for KASS system and its sub-system that were performed based on the inspection, analysis, review of design, test (IART) method from factory acceptance test (FAT) to test readiness review (TRR) after critical design review (CDR) was closed. In the FAT phase, developed equipment was installed on the test platform and we were verified interfaces between sub-systems and coupling test with the kass control station (KCS). In the site aceeptance test (SAT) phase, on-site verification was conducted by installing equipment verified by FAT such as kass reference station (KRS), kass processing station (KPS), kass uplink station (KUS), KCS. However, considering the developed plan and status, SAT was divided into 3 phases and coupling test was performed. In the TRR phase, the KASS system verification was performed through FAT's test list and additional test list using the satellite based augmentation system (SBAS) broadcast signal from geostationary earth orbit (GEO) 1.

Analysis of the Actual Condition of the Tree Doctor Qualification Test and Improvement of the System - Focus on the First Test - (나무의사 자격시험의 실태분석과 제도개선 방안 - 제1차 시험을 중심으로 -)

  • Yong Jo Jung;Hak Cheol Kim
    • Journal of Environmental Science International
    • /
    • v.32 no.1
    • /
    • pp.11-24
    • /
    • 2023
  • This study aimed to provide preliminary data for the improvement of the tree doctor qualification test (first written test), which was newly created by enforcing the Forest Protection Act on June 28, 2018., The high demand for system improvement accelerated this study. The results were analyzeds through literature and questionnaire surveys. Writing test questions and the license of the tree doctor qualification exam are currently managed by the Korea Forestry Research Institute, and it is deemed that the test should be entrusted to Human Resources Development Service of Korea for fair and transparent management. Additionally, the plan for the improvement of the subject-wise scope of examination questions writing, difficulty of test questions, and acceptance rate of the first test should be prepared after public hearings or seminars related to the examination questions.

Economic Design of Zero-Failure Reliability Qualification Test (경제적인 무고장 신뢰성 인증시험 설계)

  • Kwon, Young-Il
    • Journal of Korean Society for Quality Management
    • /
    • v.39 no.1
    • /
    • pp.71-77
    • /
    • 2011
  • In the fields of reliability application, the most commonly used test methods for reliability qualification are zero failure tests since they require fewer test samples and less test time compared to other test methods that guarantee the same reliability with a given confidence level. An economic zero failure test plan is developed that minimizes the total cost related to perform a life test to guarantee a specified reliability of a product with a given confidence level and a numerical example is provided to illustrate the use of the proposed test method.

Study of the Functional Test and Quality Assurance Procedure of High Performance Aircraft Control Surfaces Integrate Servo Actuator (고성능 통합 비행 조정면 구동 장치의 성능 시험 및 품질보증 절차 수립에 관한 연구)

  • Jo, Jang-Hyen
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.3 no.3
    • /
    • pp.251-256
    • /
    • 2000
  • This report analyzes the Source Qualification Test which is composed of main functional and environmental tests for the localizing avionics(electronic subsystem for aircrafts and spacecraft) and high performance mechanical subsystem. Especially the detail test approaches of integrated servo actuators which is the main part to supply the power to the main and other flying control panel. Nowadays this subsystem works with mechanical and electrical engineering technique. In detail, electrical signal is used as input and transferring tool and mechanical part is the output as a power and manufacture the physical dimensions and functions. Finally in this review, the new test procedure to prove the function by the new manufacturer is established.

  • PDF

Analysis of Regulatory Guidance on Electromagnetic Interference of Equipment for Safety of Nuclear Power Plants (원자력발전소 안전을 위한 전자파장해 검증 규제지침 분석)

  • Park, Jae Yoon;Ah, In Beom;Kim, Jaehyun;Choo, Jaeyul
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.5
    • /
    • pp.74-79
    • /
    • 2022
  • This study analyzes the contents of the second revised Regulatory Guide 1.180 (Revision 2) for electromagnetic compatibility qualification published by the U. S. Nuclear Regulatory Commission by comparing them with those of the previous version. The methods and acceptance criteria of both CE101 and CE102 tests pertaining to conductive emission and RE102 test for radiation emission are observed to have been modified in Revision 2. Furthermore, the revised guide is found to afford flexibility in using alternative methods for electromagnetic interference qualification by allowing the combination of different technical base standards.

Space Qualification of MMICs for COMS Communications Transponder (통신해양기상위성 통신 중계기용 MMIC의 우주인증)

  • Jang, Dong-Pil;Yeom, In-Bok;O, Seung-Yeop
    • Journal of Satellite, Information and Communications
    • /
    • v.1 no.2
    • /
    • pp.56-62
    • /
    • 2006
  • This paper describes the MMIC product qualification of the Ka band satellite transponder for the COMS(Communication, Ocean and Meteorological Satellite). Ka-band active equipment for the COMS communications transponder are being developed by using 12 kinds of MMICs which include low noise amplifiers, medium power amplifiers, frequency mixers, frequency multipliers, RF switch, and HEMT attenuator MMIC, Those MMICs had been fabricated at the MMIC production foundry of northrop Grumman Space Technology (Velocium) which is qualified for space application, and experienced in various space programs during past decades. For the MMIC product qualification, Visual inspection and SEM inspection had been performed, and burn-in test for 240 hours and accelerated life-test for 1000 hours had been done on test fixtures of individual MMIC products at $125^{\circ}C$. Additionally, infrared temperature scanning and finite element simulation were performed to analyze and confirm the channel temperature of semiconductor devices on several representatives of those MMIC products that os one of the most important factors in performance degradation and life reduction.

  • PDF

Research on Development and Performance Evaluation for Thruster of Reaction Control System for KSLV-I (KSLV-I RCS 추력기 개발 및 수행 평가에 대한 연구)

  • Jeon, Sang-Woon;Jung, Seul
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.47 no.3
    • /
    • pp.19-27
    • /
    • 2010
  • KSLV(Korea Space Launch Vehicle)-I is designed as a launch vehicle to enter a 100 kg-class satellite to the LEO(Low-Earth Orbit). Attitude angles of the upper-stage, including roll, pitch and yaw are controlled by cold gas thruster system using nitrogen gas. The thruster for the KSLV-I is the main pneumatic valve in the RCS(Reaction Control System). In this paper, the design, function tests, and environment tests of the thruster for KSLV-I are described. The developed thrusters are experimentally evaluated and successfully passed the required qualification and acceptance tests.