Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
International conference on construction engineering and project management
/
2013.01a
/
pp.403-411
/
2013
Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.
We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.
Korean Journal of Construction Engineering and Management
/
v.10
no.5
/
pp.76-84
/
2009
Korea's construction industry experienced no difficulty managing the costs of finishing work items in the apartment housing field thanks to the uniform specification and the standardized costs of finishing work items. Finishing work items have continuously become more high class and differentiated, which has caused the costs of finishing work items to rise. This study identified problems with the cost management when planning finishing work items and choosing their alternatives based on the current process applied to the planning stage of finishing work items. It also found problems with the information management of finishing work items including design, cost, and work information that took place in bulk. Based on the identified problems, the design, cost and work information of finishing work items was integrated so that they could management the costs and information when planning finishing work items and selecting their alternatives. Then a cost-based information management process was suggested for finishing work items by improving each of the project cost management elements. Finally, an information model for finishing work items was built by studying the ways to integrate the information hierarchy and library of finishing work items.
This study aims to suggest the alternative policies and practices which policy makers can introduce and enlarge for work-family balance of employees. For purpose, this study analyzed the regulation of work time and parental leave benefits of employees. And the results of major projects in family friendly support services were examined. Based on these assessment, this study suggested various flexible work arrangements, papa's quota system in parental leaves, various family leaves for family care, establishment of FFSC in every metropolitan area, diversification of consulting project, and enlarging of certification project on family friendly workplace.
Korean Journal of Construction Engineering and Management
/
v.10
no.4
/
pp.14-25
/
2009
Development work of apartment houses is a complex medium-and long-term project requiring grand resources and work force. Since in combination inner and outer project variables relate to project output, uncertainties caused by not only a given site condition but also politic, economy and social sectors are generated during the project. These risks influence output of the project as important factors, and ultimately as management variables in priority giving an effect on earnings and the financial structure of enterprises they should be manageable with the risk reduction plan. In this point of view, this study focused on development work of apartment houses among construction project. Risky factors were deduced, analyzed and evaluated based on Value Engineering from planning to designing to executing to maintaining. Eventually, this study showed the foundation guaranteeing competitive power of public and private construction sectors.
This study aimed to identify a difference in project implementation between villages that had executed rural village community activation support work successfully and those that had quit in the middle from the new endogenous development theory perspective. As a result, it was found that the main factors used for promoting to increase endogeneous development capabilities existed more in villages that executed project implementation support work successfully than in villages that had quit in the middle. Successful villages have a difference from the villages that had quit in the middle in that they have established a participatory decision making and cooperation system for stable operation even before their support work began, they have more assets for promoting community activity, residents' interaction and communal activity are becoming more active, and reciprocity-based mutual aid culture exists in many forms. In conclusion, seeing from the new endogenous development theory perspective, villages are developed under the interaction between internal and external factors, but the outcome of project implementation depends on whether village community holds its endogenous development capability to operate and develop such whole process of development. Therefore, village community activation policies need to be reinforced in the direction toward promoting to create the main factors for enhancing endogenous development capabilities.
The Journal of the Convergence on Culture Technology
/
v.9
no.6
/
pp.1173-1178
/
2023
In modern society, there is a tendency to emphasize efficiency and lead to detailed planning of team projects and individual tasks within organizations. In a 24-hour routine, the ability to use time effectively is considered an indicator of conscientiousness, and people try to imitate planned and organized people and utilize various systems to manage their daily lives. The reason why you want to perform a given task efficiently is because it affects the success or failure of the project by completing the task within a set period of time. Neglecting the project schedule is considered a major risk that threatens a successful outcome. This applies not only to large-scale organizational projects but also to individual life, and utilizes a variety of schedule management tools that emphasize time-based efficient management. In project management, it is necessary to carefully understand the detailed work progress rather than simply based on Today. In this paper, we propose an Android application that can manage schedules by accessing the user's project in units of tasks rather than dates, and introduce its implementation. The application we implemented in this paper can manage the project's goals and schedule by registering the project to which the user belongs. In addition, it provides the ability to approach work efficiently by visualizing the progress of the entire project or individual goals. As a result, users can use the application we propose in this paper to focus on their projects and manage schedules by task, thereby improving the overall efficiency of the project.
A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.
This paper presents the Case of Systems Engineering Application for the Railway Total-Safety Project. Key points to consider for project are: 1) Establish the SE Based-Project organization system, 2) Define the SE Activities, 3) Manage technically the SE Based-Project, etc. They were of much help that the Railway Total-Safety Project which were efficiently implemented and managed. As I take it, the Systems Engineering is very reasonable approach for the systematical and technical conduct of a project.
Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.