Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes (국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석)

  • Sohn, Kwon-Joong;Yoo, Wang-Jin;Lee, Cheol-Gyu
    • Journal of Technology Innovation
    • /
    • v.16 no.1
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

A Cost-Based Interior Information Management for an Apartment Housing Project (원가기반의 공동주택 마감재 정보관리 방안 연구)

  • Lee, Hoon-Ku;Lee, Yoon-Sun;Moon, Hyuk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.76-84
    • /
    • 2009
  • Korea's construction industry experienced no difficulty managing the costs of finishing work items in the apartment housing field thanks to the uniform specification and the standardized costs of finishing work items. Finishing work items have continuously become more high class and differentiated, which has caused the costs of finishing work items to rise. This study identified problems with the cost management when planning finishing work items and choosing their alternatives based on the current process applied to the planning stage of finishing work items. It also found problems with the information management of finishing work items including design, cost, and work information that took place in bulk. Based on the identified problems, the design, cost and work information of finishing work items was integrated so that they could management the costs and information when planning finishing work items and selecting their alternatives. Then a cost-based information management process was suggested for finishing work items by improving each of the project cost management elements. Finally, an information model for finishing work items was built by studying the ways to integrate the information hierarchy and library of finishing work items.

The Analysis of the Current Conditions of and Suggestions for Family Friendly Support Services (가족친화지원사업의 시행현황과 개선방안)

  • Jeong, Young-Keum;Cho, Seong-Eun;Ahn, Jae-Hee;Kim, Ji-Su
    • Journal of Families and Better Life
    • /
    • v.31 no.4
    • /
    • pp.83-96
    • /
    • 2013
  • This study aims to suggest the alternative policies and practices which policy makers can introduce and enlarge for work-family balance of employees. For purpose, this study analyzed the regulation of work time and parental leave benefits of employees. And the results of major projects in family friendly support services were examined. Based on these assessment, this study suggested various flexible work arrangements, papa's quota system in parental leaves, various family leaves for family care, establishment of FFSC in every metropolitan area, diversification of consulting project, and enlarging of certification project on family friendly workplace.

A Study on the Risk Evaluation of Apartment Development Project based on VE (VE기반 공동주택 개발사업 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Shin, Seog-Bae;Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.14-25
    • /
    • 2009
  • Development work of apartment houses is a complex medium-and long-term project requiring grand resources and work force. Since in combination inner and outer project variables relate to project output, uncertainties caused by not only a given site condition but also politic, economy and social sectors are generated during the project. These risks influence output of the project as important factors, and ultimately as management variables in priority giving an effect on earnings and the financial structure of enterprises they should be manageable with the risk reduction plan. In this point of view, this study focused on development work of apartment houses among construction project. Risky factors were deduced, analyzed and evaluated based on Value Engineering from planning to designing to executing to maintaining. Eventually, this study showed the foundation guaranteeing competitive power of public and private construction sectors.

Analysis of Success Factors of Rural Village Community Revitalization Project Based on Neo-Endogeneous Development Theory: Focusing on Seven Rural Villages in Cheonan, Chungnam province (신내생적 발전론에 입각한 농촌마을공동체 활성화 사업의 성공 요인 분석: 충남 천안지역 7개 농촌마을을 사례로)

  • Ko, Kyoung-Ho
    • Korean Journal of Organic Agriculture
    • /
    • v.30 no.1
    • /
    • pp.51-74
    • /
    • 2022
  • This study aimed to identify a difference in project implementation between villages that had executed rural village community activation support work successfully and those that had quit in the middle from the new endogenous development theory perspective. As a result, it was found that the main factors used for promoting to increase endogeneous development capabilities existed more in villages that executed project implementation support work successfully than in villages that had quit in the middle. Successful villages have a difference from the villages that had quit in the middle in that they have established a participatory decision making and cooperation system for stable operation even before their support work began, they have more assets for promoting community activity, residents' interaction and communal activity are becoming more active, and reciprocity-based mutual aid culture exists in many forms. In conclusion, seeing from the new endogenous development theory perspective, villages are developed under the interaction between internal and external factors, but the outcome of project implementation depends on whether village community holds its endogenous development capability to operate and develop such whole process of development. Therefore, village community activation policies need to be reinforced in the direction toward promoting to create the main factors for enhancing endogenous development capabilities.

Design and Implementation of a Project Work Unit-based Scheduling Application (프로젝트 작업 단위 기반 일정 관리 애플리케이션의 설계 및 구현)

  • Bomin Kim;Minyoung Kim
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.6
    • /
    • pp.1173-1178
    • /
    • 2023
  • In modern society, there is a tendency to emphasize efficiency and lead to detailed planning of team projects and individual tasks within organizations. In a 24-hour routine, the ability to use time effectively is considered an indicator of conscientiousness, and people try to imitate planned and organized people and utilize various systems to manage their daily lives. The reason why you want to perform a given task efficiently is because it affects the success or failure of the project by completing the task within a set period of time. Neglecting the project schedule is considered a major risk that threatens a successful outcome. This applies not only to large-scale organizational projects but also to individual life, and utilizes a variety of schedule management tools that emphasize time-based efficient management. In project management, it is necessary to carefully understand the detailed work progress rather than simply based on Today. In this paper, we propose an Android application that can manage schedules by accessing the user's project in units of tasks rather than dates, and introduce its implementation. The application we implemented in this paper can manage the project's goals and schedule by registering the project to which the user belongs. In addition, it provides the ability to approach work efficiently by visualizing the progress of the entire project or individual goals. As a result, users can use the application we propose in this paper to focus on their projects and manage schedules by task, thereby improving the overall efficiency of the project.

A study on the development on project scope management module using rule and case-based reasoning (규칙과 사례기반추론 기법을 이용한 프로젝트 범위관리 모듈 개발에 관한 연구)

  • Shin, Ho-Kun;Jeon, Sung-Ho;Kim, Chang-Ho
    • The Journal of Information Technology
    • /
    • v.7 no.3
    • /
    • pp.127-137
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.

  • PDF

A Study on the Application System of the Systems Engineering for the Railway Total Safety Project (철도종합안전프로젝트를 위한 시스템엔지니어링 적용 체계 연구)

  • Choi Yo-Chul;Cho Yun-Ok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.487-492
    • /
    • 2006
  • This paper presents the Case of Systems Engineering Application for the Railway Total-Safety Project. Key points to consider for project are: 1) Establish the SE Based-Project organization system, 2) Define the SE Activities, 3) Manage technically the SE Based-Project, etc. They were of much help that the Railway Total-Safety Project which were efficiently implemented and managed. As I take it, the Systems Engineering is very reasonable approach for the systematical and technical conduct of a project.

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.