Assuming that the Capability Maturity Model Integration for Development v1.2 (CMMI) could be applied to an organization more effectively if the content similarities among practices were improved in terms of structure and composition, this paper presents the analysis of the correlations between the CMMI Specific Practices (SP) and Generic Practices (GP) for the Maturity Level 2 and 3 Process Areas using the Chi-square independence test. According to the analysis, a 22.2% correlation was observed. To minimize the problem of repeatedly applying similarities, 6 GPs that are highly correlated with the SPs were grouped together. Then, three different improvement plans: 1) development of a standard template-based project plan, 2) establishment of a configuration management system based on open source software to control work products and leverage experience, and 3) establishment of project assurance through an independent quality assurance-based organization and intensive review by higher-level management - were defined.
코로나19의 출현 이후 국내외 공연계는 온라인 플랫폼을 활용해 다양한 예술적 실험을 시도하고 있다. 이에 본 연구는 연극 공연을 위한 창작 도구로 활용된 줌(Zoom)의 기능적 특성에 주목하였다. 우선 줌을 활용한 국내외 연극 공연 사례와 그 특징들을 살펴본 후, 줌 연극 <프로젝트, 홍도 Project, Hong-Do>의 제작 단계를 리서치 중심의 프리-프로덕션(Pre-production)단계, 대본을 바탕으로 각 장면을 구성하는 장면 워크숍(Scene Workshop)단계, 장면별 실시간 녹화를 진행하는 레코딩(Recording) 단계와 공연을 상영하기 위한 스트리밍(Streaming) 단계로 구분하여 살펴봄으로써 줌을 통해 창작한 연극의 특성을 고찰할수 있었다. 또한 이러한 제작 과정에서 나타난 배우의 연기 접근 방법을 시선의 분리, 공간의 재인식, 표현적 제스처의 활용, 능동적 행동으로서의 리액션(Reaction)으로 상정하여 살펴보았다. 그 결과 줌을 활용한 연극 작업의 지속적인 발전 가능성과 이에 따른 배우의 연기 접근 방법을 제안할 수 있었다.
Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.1150-1153
/
2005
The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.
The 3th International Conference on Construction Engineering and Project Management
/
pp.732-737
/
2009
Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.
The 5th International Conference on Construction Engineering and Project Management
/
pp.338-343
/
2013
Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.
Existing improvement measures for resource management are merely concentrating on the document automation only. In addition, such improvements rarely benefit metal millwork management. Following the trend of constructing high rise and multi-complex buildings, the importance of resource management from the aspect of construction project management is being emphasized. Metal work resources are critical most of construction projects, it became a target for special management. Therefore, the study has determined work process of metal work resource management, for the metal millwork is one of the most important construction materials most of construction projects, and proposed a web based module for improving the management task.
A major goal of the Community Plant Food Project is to develop partnerships between the Cornell Community Nutrition Program and Community-based organizations, including Cooperative Extension. A core principle behind this work is integrating research and intervention. Based on our work in Rochester, New York, we have developed a process and principles for effective partnerships. This new paradigm what we call the University-Community Partnership Model is a team effort that builds on the experiential literature in the fields of communication, leadership, community and team development, sociology, and participatory research and action. We have applied this model both to increase our understanding of Family Food Decision-making and to develop programs for families. In this project, we have used a variety of qualitative methods to understand food decisions from the perspectives of families and community stakeholders, including a group method for analyzing our qualitative interview data. For our survey of families, we developed the Enhanced Response Method, an approach for improving the validity and reliability of community surveys with families and, at the same time, building relationships with families and other stakeholders in the community for integrated and sustainable interventions. Because the knowledge we develop through the partnership and the interventions we seek to implement are products of the process, we are constantly seeking to refine this knowledge and to adapt emerging interventions through an ongoing evaluation process we call the Continuous Improvement Method.
Simulation --- The ideal tool for BPR. Work now and CASE tools are static modeling tools. Based on our own customers surveys, we have discovered that the use of process modeling tools thus far has focused on modeling the current(What-Is) state of a business. We have found that 90 percent of reengineering projects, the modeling tools of choice have been flowcharting tools. Static models offer help in understanding the overall nature of an existing process. However, static models can not really help you see the step by step motions towards completion of your goals. In static modeling, you see two pictures in time, usually taken at the current state and final state models of your reengineering project. Static models are usually not object oriented, therefore can not show facility or office layout and movement of entities and objects throughout the facility. However, this does not mean that static modeling does not have its application nor add value to the user as in a few success stories. Simulation helps the team analyze the complex aspects of the project. Many times a plan that looks good on paper might turn out entirely different when put into action. Therefore, simulation helps you look at how situations might work before actual implementation. In particular, computer simulation models help you view a reengineered condition before they are rolled-out. Items such as a lead time and resource allocation.
캡스톤 설계 교과목은 학생들의 실무 프로젝트 향상을 위해서 대학교 학부과정에서 개설되어 있다. 본 논문은 캡스톤 설계 교과목을 효율적으로 운영하기 위한 방안을 제시한다. 제시하는 캡스톤 설계는 기업체의 외부 아웃소싱 연구소 형태로 운영되고 기업체가 주제를 제시하며 당해 연도 4학년 학생들이 프로젝트를 수행하고, 다음 해에는 3학년 학생들이 이어 받아 진행하게 함으로써 단발성이 아닌 지속적으로 유지되도록 운영한다. 이를 토대로 기업체는 원하는 프로젝트 결과물을 얻을 수 있고, 대학교는 학생들에게 실무중심의 팀프로젝트 경험을 쌓게 함으로서 기업체-대학교가 상호 이득을 얻을 수 있을 것이다. 제안하는 운영시스템을 실제로 컴퓨터공학 계열학과에 적용하고, 교과목 수강 학생과 참여 기업체의 멘토를 대상으로 설문조사를 수행하고, 제안시스템의 운영 결과를 분석한다.
정부 주도하에 정책적으로 이루어지는 국책 건설사업은 국가의 사회간접자본시설에 주로 집중되며 상당한 국가예산이 투입되고 관련 분야의 전문적 역량이 총체적으로 투입되는 장기적 사업이다. 일반적으로 사회기반시설은 반영구 혹은 영구적 국가 자산으로 유지하게 되며 그에 따른 기록물 또한 해당 시설물의 수명기간 동안 보존 활용되어야 한다. 또한 국책사업 특성상 다양한 이해관계자 간의 유기적 협의체계를 지원하고 오랜 기간 동안 일관된 문서 및 기록관리체계를 유지하기 위해서는 기관별 특성을 최대한 배제한 사업 역무 위주의 표준화된 분류체계의 수립이 필요하다. 따라서 국책사업 기록물의 분류체계는 사업 자체 업무 분석을 근거로 사업 업무분류체계(WBS : Work Breakdown Structure)를 기반으로 수립되어야 한다. WBS는 프로젝트 관리(PM) 분야에서 통상적인 사업관리 기법으로 업무구분을 위해 사업초기에 수립되며, 프로젝트 목표를 달성하고 필요한 인도물을 산출하기 위하여 프로젝트 팀이 실행할 작업을 인도물 중심으로 분할한 계층 구조체계이다. 따라서 본 연구는 WBS에 기반한 국책사업 기록물 분류체계 수립에 대한 구체적인 사례와 방안을 제시함으로써 현 관리, 행정기록물 중심의 기록물 분류 체계에 대한 새로운 시각을 제시하는 데 목적이 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.