• 제목/요약/키워드: project evaluation

검색결과 2,386건 처리시간 0.03초

사용자 만족도 관점에서의 정보화 시범사업평가 (An Evaluation on Pilot Informatization Projects : A View of User Satisfaction)

  • 양경식;김현수
    • Journal of Information Technology Applications and Management
    • /
    • 제9권3호
    • /
    • pp.31-46
    • /
    • 2002
  • The objective of this paper is to develop an evaluation model for pilot informatization projects. There are relatively many researches on evaluation models for information systems. These previous researches, however, lack of comprehensive view of informatization Projects and pilot systems. We apply and test a hybrid evaluation model for to measure the success of pilot informatization projects. A user satisfaction model has been used and hypotheses are developed to find relationships of evaluation factors. The hypotheses have been tested with 51 user surveys. The result of this research can give an insight for the evaluation of pilot informatization projects.

  • PDF

GIS구축 계획에 대한 경영학적 접근 - 포항시 사례를 중심으로-

  • 조대연;권오병
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1998년도 추계학술대회 논문집
    • /
    • pp.350-353
    • /
    • 1998
  • Recently, local governments have started projects of implementing Geographic Information Systems (GIS) as an infrastructure for the collection, storage, and analysis of the spatial information. So far, these projects have been approached from the areas such as the civil engineering and the computer science perspectives. Nonetheless, in order for a GIS project to be successful, it should be approached from the management perspectives as well. In this paper, the authors discusses about the management issues such as the determination of priority of the sub-projects, the organizational structure that takes charge of the project and the evaluation of the performance of the project.

  • PDF

Hermeticity and Reliability Issues in Microsystems Packaging

  • 함석진
    • 한국마이크로전자및패키징학회:학술대회논문집
    • /
    • 한국마이크로전자및패키징학회 2007년도 SMT/PCB 기술세미나
    • /
    • pp.129-146
    • /
    • 2007
  • [ ${\square}$ ] A mathematical model has been developed and used to analyze the limits of He fine leak test. ${\square}$ Uncertainties inherent in using the MIL-STD-883 guidelines for hermeticity evaluation of small packages have been demonstrated. ${\square}$ A new methodology to quantitatively characterize hermeticity has been developed.

  • PDF

Evaluating Construction Market of ASEAN Nations

  • Kim, Hwarang;Lim, Jangsik;Ock, Jongho;Jang, Hyounseung
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.216-222
    • /
    • 2020
  • This research evaluated the construction market and project environment of nine nations within the ASEAN members. Quantitative data from global consulting firms and international organizations were identified and normalized for evaluation. The result of the analysis was that Indonesia was ranked highest for construction market growth while Singapore was ranked highest for stability of project environment. The research results can be utilized by construction companies that are planning on entering the construction market within the ASEAN members.

  • PDF

개발효용성에 근거한 기술대체모듈의 선정모형 (A Selecting Model for the Technology Modular Alternatives Based on Development Effectiveness)

  • 김기찬;안기현;강일중;권철신
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2007년도 추계학술대회 및 정기총회
    • /
    • pp.152-155
    • /
    • 2007
  • The object of this research is to evaluate the priority of R&B project alternatives which were already screened by both feasibility and suitability of technological performance. This research is a selection model for R&D project alternatives after setting phase. And it is designed by CHP model which include individual and mutual weights. This model have 5 steps. (1) Setting Technology-Modules derived on the setting phase (2) Presenting the evaluation standards divided with 'M-Field' and 'T-Field' (3) Assessing the evaluation standard and technology modules (4) Obtaining and integrating the individually and mutually effective weights (5) Selecting the technology modules based on the priority of order by CHP. Through these steps, this model can suggest the evaluation way from specific technology levels to project level. And it can be guaranteed to perform the selected module set.

  • PDF

A Study on the Efficiency Evaluation of the old Town Commercial Area Regeneration Project: Focusing on University and Tradition Market Project

  • RYU, Tae-Chang
    • 유통과학연구
    • /
    • 제17권5호
    • /
    • pp.61-72
    • /
    • 2019
  • Purpose - In this study, we try to measure the efficiency of the traditional market and university cooperation projects and present the direction of policy improvement for the near future by converging the system, which exerts to secure the competitiveness and revitalize its centered-city, and the recent policies that have new business and social Research Design, Data, and Methodology - In order to improve this situation, this study uses Data Envelopment Analysis (DEA) to evaluate the effectiveness of the policy project and propose its evaluation results. Also, we want to derive the weight calculation for utilizing DEA by using AHP method. Results - This study's results were derived from the input and output variables, so instead of qualitative analysis, the conclusion was drawn out from the quantitative analysis. Through this quantitative analysis method, we had an opportunity to identify the characteristics of each site by each year. Conclusions - It is believed that the reliability of the results can be further improved if the qualitative part can be supplemented its unique characteristics of the model which only considers the simple quantitative aspect. Further studies should be undertaken as these sectors are expected to draw out fruitful research conclusion when these aspects were supplemented additionally, so continuous additional study is essential.

Evaluation Methodology of Remote Dismantling Equipment for Reactor Pressure Vessel in Decommissioning Project

  • Hyun, D.J.;Choi, B.S.;Jeong, K.S.;Lee, J.H.;Kim, G.H.;Moon, J.K.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • 제1권1호
    • /
    • pp.83-92
    • /
    • 2013
  • A novel methodology to evaluate remote dismantling equipment for a reactor pressure vessel (RPV) in a decommissioning project is presented in this paper. The remote dismantling equipment, mainly composed of cutting tools and positioning equipment, is absolutely required to cut and handle highly radioactive and large components in nuclear power plants (NPPs); this equipment has a great effect on the overall success of the decommissioning project. Conventional evaluation methods have only focused on cutting technologies or positioning equipment, although remote dismantling equipment cannot achieve its goal without organic interaction between the cutting tools and the positioning equipment. In this paper, the cutting tools and the positioning equipment are evaluated by performance parameters according to their original characteristics, the relationship between the two systems, and common factors. Finally, the remote dismantling equipment used in recent decommissioning projects has been evaluated based on the proposed methodology. The results of this paper are expected to be useful for future decommissioning projects.

CBTC 시스템에 대한 시스템 수준의 시험평가 방안 연구 (A Study on the System-level Test and Evaluation for the CBTC System)

  • 이영훈;이재천
    • 조명전기설비학회논문지
    • /
    • 제22권12호
    • /
    • pp.115-121
    • /
    • 2008
  • 현재 추진되고 있는 무선통신을 기반으로 하는 열차제어시스템 개발 프로젝트에서는 상호운영성 및 상호교환성을 고려하는 하부시스템의 개발을 목표로 하고 있다. 이 프로젝트는 상위 시스템 수준의 설계보다는 주로 하부시스템의 설계에 집중되어 있다. 시스템에 대한 시험평가는 시스템 사양에 대한 만족 여부를 확인하는 것이며, 이에 따라 시스템 수준으로 통합된 시스템 사양서가 필요하다. 본 연구에서는 시스템 사양서가 마련되지 않은 하부시스템의 설계단계에서 최상위 시스템 수준의 시험평가에 대한 방안을 제시하였다.

영월읍 농촌중심지활성화 사업 모니터링 결과 분석 - 2018년 지역역량강화 프로그램을 중심으로 - (The Monitoring and Evaluation of the Community Central Revitalization Project in Yeongwol - Focusing on the Community Empowerment Project in 2018 -)

  • 정미경;김기성
    • 한국농공학회논문집
    • /
    • 제61권4호
    • /
    • pp.43-54
    • /
    • 2019
  • The present study aims to monitor three of the community empowerment projects implemented as part of the community central revitalization projects in Yeongwol. We used an established indicator (i.e., quantitative evaluation) as well as an interview (i.e., qualitative evaluation) throughout the monitoring process. The PM (project manager) committee members, consisting of six interdisciplinary experts, carried out the monitoring from $24^{th}$ of October until the $26^{th}$ of November 2018. We categorized the results of the monitoring into the aspects of needs, software, and hardware, and analyzed them as follows: First, although the locals were willing to take part in programs, they were in overall not well informed about the ongoing programs and the program that suits their needs the most. The service organization should therefore actively publicize the program and provide sufficient information about it .Second, instead of a one-off program, the locals should be empowered to take over the program eventually and develop it as a local business model. Last, the locals from the center as well as the outskirts of Yeongwol should organize a learning net, collaboratively develop a further program, and assess its effectiveness by employing a thorough monitoring system.

무기체계 획득시 WBS를 활용한 운용시험평가 항목 도출방법 개발 (A Deriving methodologies for OT&E items using WBS when acquiring a weapon system)

  • 박종완;정희태
    • 시스템엔지니어링학술지
    • /
    • 제18권2호
    • /
    • pp.1-10
    • /
    • 2022
  • In general, similar or previous projects are mainly referred to in order to derive operational test and evaluation(OT&E) items after acquiring weapon system. The idea that a more systematic method is needed is spreading because some of OT&E items derived in this process are redundant or unnecessary. Therefore, in this topic, we plan to use WBS, a tool that classifies components into a hierarchical structure and manages development easily to achieve the weapon system development goal. In addition, the WBS tool is applied to the medium-sized standard vehicle project, which is currently being research and developed, to effectively derive OT&E items. As a result of deriving OT&E items by applying WBS to the vehicle development field and electric devices of the medium-sized standard vehicle project, the operability and relationship were judged early, and then contents of the evaluation items could be written substantially while working on environmental adaptability. In the future, it is judged that the efficiency will be increased if the method discussed in this paper is applied when deriving the OT&E items from the R&D development project.