• 제목/요약/키워드: project contract

검색결과 398건 처리시간 0.023초

공공 IT 프로젝트 수발주 제도와 정책의 국제간 비고 (A International Comparative Study on the Bidding System & Policy for the Public IT Project)

  • 노규성
    • 디지털융복합연구
    • /
    • 제6권1호
    • /
    • pp.11-19
    • /
    • 2008
  • The Bidding System of the public IT project in Korea is fallen behind, because of the ordering habitual practice based old system, overcompetition based sealed bid and subcontract practice. To innovate this old-fashioned practice for public IT project bidding, this paper wants to generate a proper improvement direction of the public IT project contract law and the related policy through the literature review about the ordering and receiving system in Korea, the practical survey about bidding marketplace in Korea, and competition between bidding system and/or policy of major countries: USA, UK, France and Japan. As a result of practical survey, many problems of the current public IT project bidding system came out and improvement ideas toward future situation turned up. These outputs implicate that the current law and system related public IT project demands better improvement work for the future ubiquitous Korea. Therefore, this paper, to solve these problems about bidding systems and practice, propose the new public IT project contract law and the related policy, reflecting these improvement ideas by the practical survey and the literature review, and benchmarking points from bidding system of other countries.

  • PDF

전문건설업체 측면에서 전문공종 시공업무 장애 요인에 관한 연구 (A Study on the Obstacle Factors of Construction Works in terms of the Specialty Contractors)

  • 양진국;이기훈;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.155-156
    • /
    • 2021
  • Most of the construction works in domestic are not direct undertaking work, but by a contract method including subcontracting. Therefore, a general contractor for each project jointly carry out construction work with a specialty contractor for each engineering type. However, in terms of contract, this method is not a joint venture contract, but a subcontract. Accordingly, this system can cause various problems between the prime contractor and the subcontractor. Therefore, this study aims to extract and present the actual obstacle factors in terms of specialty contract company performing specialty construction work for construction project. The presented contents are expected to present the standard for the cooperation system that the prime contractor and the subcontractor can win-win.

  • PDF

A STUDY ON CONSTRUCTION SCHEDULE OPTIMIZATION INTEGRATING WITH CASH-FLOW

  • Hyung-Guk Lee;Dong-Pil Shin;Sung-Hoon An;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.141-144
    • /
    • 2013
  • This paper presents a system called a Cash-flow based Construction Schedule Optimization system(CfSO). The existing CPM effectively handles schedule and cost management. However, funding strategy should be considered to obtain maximum profit and to progress a project favorably. One of measures is to coordinate the contract terms between owner and subcontractors (or suppliers). Contractor may decrease the interest cost attributed to project financing by adjusting the timing of cash-inflows and cash-outflows. It is an excellent method maximizing profits. This paper presents a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed method is implemented as a system prototype in Microsoft Excel. This system provides a user an automated tool that identifies an optimal schedule that secures maximum profit by adjusting start and finish times of non-critical activities' free-floats without affecting on the project completion time. This system supports a project manager to establish an optimum project schedule and identifies profitable contractual conditions against to a construction owner.

  • PDF

건축주가 직접 발주한 석면해체공사 도급의 타당성에 관한 연구 (Practical Reasonability for Introducing Separate Contract Award System Concerning Asbestos Removal)

  • 손기상;갈원모;김형석
    • 대한안전경영과학회지
    • /
    • 제13권2호
    • /
    • pp.259-266
    • /
    • 2011
  • Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.

플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구 (Improved Scheme to Manage Engineering Man-hour in a Plant Project)

  • 신지로;문승재;이재헌
    • 플랜트 저널
    • /
    • 제5권1호
    • /
    • pp.51-59
    • /
    • 2009
  • The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

  • PDF

토목공사 수주현황 분석을 통한 턴키${\cdot}$대안입찰제도의 문제점 및 개선방안 연구 (Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects)

  • 이양규;강인석;박종혁;전성철
    • 한국철도학회논문집
    • /
    • 제8권5호
    • /
    • pp.460-469
    • /
    • 2005
  • Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.

물가변동에 의한 계약금액 조정방안 개선 기초연구 (Improvement contract sum adjustment method caused by price fluctuation)

  • 조훈희;서장우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술대회지
    • /
    • pp.83-86
    • /
    • 2004
  • Index adjusted ration method has been widely utilized in public construction secter for contract sum adjustment by price fluctuation. In this method. the Production Price Index are used for calculating the base ratio. but the PPI can't reflect the property of construction project in respect of the selected item and weight structure. In this research we prove the problem of using the index adjusted ration method in contract sum adjustment by price fluctuation. and improve it by using the construction cost index. which has the property of construction project. And the result. we figure out the difference between the PPI and CCI by $6.7\%$ in maximum value.

  • PDF

Enhancing Value of Public Construction Projects by Improving Contract Review Process

  • Song, Sang-Hoon;Bang, Jong-Dae;Cho, Gun-Hee;Sohn, Jeong-Rak;Jung, Sang-Ho
    • 토지주택연구
    • /
    • 제2권4호
    • /
    • pp.479-489
    • /
    • 2011
  • This study aims to suggest the method to enhance the value of public construction project during contract review process considering budget reduction for project profit and public interest enhancement simultaneously. The main results of this study are as follows: (1) Current method are considered to be improved from the point that cost reduction through current method could influence performance of the object of contract without conforming to user requirements or facilities' function. (2) In order to supplement current process, the method to evaluate the variation of performance and value was established based on facility type, participants on each phase, and their requirement. (3) Case study was conducted to verify suggested method, and showed the successful application in enhancing the value of construction projects on public sector.

국내의 공공건설 클레임 예방을 위한 계약제도 개선방안 연구 (A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims)

  • 정민정;조영준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.239-242
    • /
    • 2007
  • 현재 국내건설공사 참여자들은 계약문서의 계약조건에 의해 공사를 수행하기보다는 건설현장에 뿌리내려온 전통적인 관행에 의해 공사를 수행해왔다. 복잡 다양한 건설환경을 고려하여 볼 때, 단지 몇 권의 계약문서만으로 그 모든 분쟁 요소를 해결할 수 없다. 따라서 본 연구는 현 국내의 건설공사의 계약문서인 공사계약일반조건을 고찰하여 불합리를 해결함과 동시에 일반조건의 개선방안 및 계약관리의 효율화 방안을 제시하여 계약관리 및 공사관리의 미숙으로 인한 클레임을 최소화하기위한 방안을 모색하고자 한다. 본 연구결과 국내의 공공건설 클레임과 관련된 문제를 최소화하기 위한 방안을 다음과 같이 제시하였다. (1) 설계변경시기에 대한 명확한 규정이 필요하다. (2) 감리자의 권한을 점차 강화하고, 동시에 책임도 강화해야 한다. (3) 설계감리제도가 계약에 반영되어야 한다. (4) 클레임제기시 그 사유를 분명히 하도록 한다.

  • PDF

정보시스템 아웃소싱에서 심리적 계약 커미트먼트의 중요성에 대한 연구 (An Empirical Study on the Importance of Psychological Contract Commitment in Information Systems Outsourcing)

  • 김형진;이상훈;이호근
    • Asia pacific journal of information systems
    • /
    • 제17권2호
    • /
    • pp.49-81
    • /
    • 2007
  • Research in the IS (Information Systems) outsourcing has focused on the importance of legal contracts and partnerships between vendors and clients. Without detailed legal contracts, there is no guarantee that an outsourcing vendor would not indulge in self-serving behavior. In addition, partnerships can supplement legal contracts in managing the relationship between clients and vendors legal contracts by itself cannot deal with all the complexity and ambiguity involved with IS outsourcing relationships. In this paper, we introduce a psychological contract (between client and vendor) as an important variable for IS outsourcing success. A psychological contract refers to individual's mental beliefs about his or her mutual obligations in a contractual relationship (Rousseau, 1995). A psychological contract emerges when one party believes that a promise of future returns has been made, a contribution has been given, and thus, an obligation has been created to provide future benefits (Rousseau, 1989). An employmentpsychological contract, which is a widespread concept in psychology, refers to employer and employee expectations of the employment relationship, i.e. mutual obligations, values, expectations and aspirations that operate over and above the formal contract of employment (Smithson and Lewis, 2003). Similar to the psychological contract between an employer and employee, IS outsourcing involves a contract and a set of mutual obligations between client and vendor (Ho et al., 2003). Given the lack of prior research on psychological contracts in the IS outsourcing context, we extend such studies and give insights through investigating the role of psychological contracts between client and vendor. Psychological contract theory offers highly relevant and sound theoretical lens for studying IS outsourcing management because of its six distinctive principles: (1) it focuses on mutual (rather than one-sided) obligations between contractual parties, (2) it's more comprehensive than the concept of legal contract, (3) it's an individual-level construct, (4) it changes over time, (5) it affects organizational behaviors, and (6) it's susceptible to organizational factors (Koh et al., 2004; Rousseau, 1996; Coyle-Shapiro, 2000). The aim of this paper is to put the concept, psychological contract commitment (PCC), under the spotlight, by finding out its mediating effects between legal contracts/partnerships and IS outsourcing success. Our interest is in the psychological contract commitment (PCC) or commitment to psychological contracts, which is the extent to which a partner consistently and deeply concerns with what the counter-party believes as obligations during the IS project. The basic premise for the hypothesized relationship between PCC and success is that for outsourcing success, client and vendor should continually commit to mutual obligations in which both parties believe, rather than to only explicit obligations. The psychological contract commitment playsa pivotal role in evaluating a counter-party because it reflects what one party really expects from the other. If one party consistently shows high commitment to psychological contracts, the other party would evaluate it positively. This will increase positive reciprocation efforts of the other party, thus leading to successful outsourcing outcomes (McNeeley and Meglino, 1994). We have used matched sample data for this research. We have collected three responses from each set of a client and a vendor firm: a project manager of the client firm, a project member from the vendor firm with whom the project manager cooperated, and an end-user of the client company who actually used the outsourced information systems. Special caution was given to the data collection process to avoid any bias in responses. We first sent three types of questionnaires (A, Band C) to each project manager of the client firm, asking him/her to answer the first type of questionnaires (A).