• 제목/요약/키워드: project characteristics

검색결과 2,329건 처리시간 0.033초

대학의 프로젝트기반 수업에서 팀 활동에 대한 동료평가와 자기평가의 특성 및 활용방안 (Characteristics and Utilization of Peer-evaluation and Self-evaluation of Team Activities in University Project Based Classes)

  • 조수선
    • 공학교육연구
    • /
    • 제25권1호
    • /
    • pp.55-64
    • /
    • 2022
  • In this paper, the characteristics of peer-evaluation and self-evaluation of team activity participation in project-based learning and their usability were investigated. The characteristics of peer-evaluation and self-evaluation are as follows. First, in peer-evaluation and self-evaluation of project-based learning, the correlation between the two evaluation scores was very high. When students' scores from their peers correlate very well with the scores they give themselves, it means that they apply the same criteria to their peers and to themselves when evaluating team activity. Second, there was no difference in peer-evaluation and self-evaluation scores between groups with different written test scores. The fact that peer-evaluation and self-evaluation scores do not change according to academic ability shows that the two evaluation areas are independent. Third, the self-evaluation score in project-based learning is statistically significantly higher than the score received from peers. This raises doubts about the fairness of self-evaluation. Therefore, in this paper, it is suggested that self-evaluation of team activities in project-based learning is carried out together with peer-evaluation, but only peer-evaluation is reflected in credits.

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

프로젝트 조직자원이 경영성과에 미치는 영향 (The Effects of Project-Based Organizational Resources on the Business Performance)

  • 진상준;오민정;박소현
    • 산업경영시스템학회지
    • /
    • 제41권3호
    • /
    • pp.30-40
    • /
    • 2018
  • The purpose of this study is to examine the effect of project-based organizational resources on the business performance in the resource-based view (RBV) and dynamic capability one and analyze their relationship through an integrated model. The RBV argues that firms get competitive advantages when they have VRIN characterized resources but dynamic capability view argues that RBV has its limitation under volatility so it enables them to obtain competitive advantages in ever changing environments. This study analyzes data collected from 270 survey questionnaires on the project management related staff at the project-based organization among major companies in Korea. The result demonstrates that two project organizational resources on strategic and executional management with VRIN characteristics are found to bring positive effects on the organizational dynamic capabilities and also the dynamic capabilities such as integration & reconfiguration, organizational learning are verified to bring meaningful positive effects on the business performance. On the other hand, unlike previous studies, ambidexterity has quite a weak effect on the business performance. Therefore, we expect that the resources of the project-based organization with VRIN lead to strengthen the firm's business performance through organizational dynamic capabilities and produce high performance through the integrated model of RBV and dynamic capability one. The study has academic meanings that widely confirm the effects and characteristics of main elements of VRIN project organizational resources on the business performance of competitive advantage through the dynamic capabilities of the organization by the regression on the precedent studies regarding the project management resources and their relationship with the VRIO characteristics. The practical implication is that it is preferentially necessary for the organization to obtain VRIN resources and organizational dynamic capabilities, especially organizational learning to have sustainable competitive advantages.

프로젝트 상급자 특성이 프로젝트관리자의 보고 성향과 시스템 개발성과에 미치는 영향 (Effect of Senior Managers' Characteristics on Project Manager's Reporting Tendencies and Information Systems Development Performance)

  • 장시영;오만석
    • Journal of Information Technology Applications and Management
    • /
    • 제19권2호
    • /
    • pp.149-179
    • /
    • 2012
  • This study explores the reporting tendencies of project managers when sending a status reports to their respective senior managers in information systems development project. It also examines the effect of selective reporting on report quality and systems development performance. The research model is proposed based on literature survey as well as key points from Iacovou et al. [2009] which is an extension of selective reporting in information systems project. Analysis of responses from 257 project managers in information systems industry indicates that pessimistic reporting by project managers has negative effect on both report quality (mediator variable) and systems development performance, while optimistic reporting has no significant effect on systems development performance. The CEO interest has an impact on the senior manager's power, which in turn leads to optimistic reporting by project managers. The senior manager's character has an impact on the senior manager's leadership, which in turn leads to pessimistic reporting. No direct relationship exists either between CEO interest and optimistic reporting or between senior manager's character and pessimistic reporting. In addition, trust toward the senior managers is significantly related to pessimistic reporting. Finally, report tendencies are also found to be affected by the active/passive characteristics of project managers.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

시지각적 분석을 통한 가로경관개선사업 평가에 관한 연구 - 부산시 광복로를 대상으로 - (A Study on the Evaluation for the Improvement of Streetscape through Analysis of Visual and Perceptual Characteristics - Focused on the Gwangbok Street, Busan -)

  • 양재혁;이강희
    • KIEAE Journal
    • /
    • 제9권3호
    • /
    • pp.37-46
    • /
    • 2009
  • This study conducted an evaluation of the streetscape improvement project of the Gwangbok Street through analysis of visual and perceptual characteristics by comparing selected pictures of streetscape before and after the project. This work has conducted an analysis of the environmental factors which influence subjects' satisfaction degrees including physical street equipments and street view factors which are main contents of this project. Using a satisfaction analysis and factor analysis, each factor's significance was verified quantitatively. As a result of the analysis, physical components of the streetscape were classified into 4 types according to project's effectiveness and improvement priorities. These 4 types include (1) Components for maintenance because of higher satisfaction and higher importance, (2) Components for improvement because of lower satisfaction and higher importance, (3) Components for good business fruits because of higher satisfaction and lower importance, and (4) Components for unnecessity because of lower satisfaction and lower importance.

교통안전사업 유형별 평가항목의 가중치 특성분석 (Characteristic Analysis for Weight Values of Evaluation Items by Traffic Safety Project Type)

  • 이희원;이지선
    • 한국도로학회논문집
    • /
    • 제20권1호
    • /
    • pp.147-156
    • /
    • 2018
  • PURPOSES : The purpose of this study is to analyze the characteristics of the weight values of evaluation items by traffic safety project type. METHODS : In general, a large-scale investment in projects such as the traffic safety project requires economic analyses to be performed in advance. However, there is an argument for considering special characteristics of the traffic safety project. Therefore, this study conducted characteristic analysis of the weight values of evaluation items. The analysis consisted of two steps. The first step was hypothesis verification using analysis of variance (ANOVA). In this process, the authors examined whether the weight of evaluation items is the same regardless of the traffic safety project type. Based on the first step's results, the authors proceeded to the second step. The objective of this step was to analyze how different the weight values are by traffic safety project type using an analytic hierarchy process. RESULTS : According to the ANOVA test results, the benefit to cost ratios have different weight values based on traffic safety project type at the 0.01 significance level. The policy evaluation items, such as the plans connection, resident opinion, and regional equity, also showed the same results except that the result for the related plans connection was statistically significant at the 0.05 level. Based on the first step's result, the AHP analysis in the second step showed that the traffic safety projects for vulnerable users and pedestrians have very low weight values in economic evaluation factors compared with other safety project types. The weight values for vulnerable users and pedestrians were 0.29 and 0.26, respectively, in economic evaluation items. On the other hand, the weight values for other safety project types were around 0.6. Among the policy evaluation items, resident opinion showed a higher weight value than other factors, such as connection and regional equity items. CONCLUSIONS : The social and economic impact of a traffic safety project varies by project type and project characteristics. Although the economic approach is overarching and a reasonable methodology is applied for large-scale projects, it should be noted that the safety issue, especially for transportation of vulnerable uses, requires a non-economical approach. Based on the analysis results, this study suggests that the priority of the projects should be determined by separating them into independent assessment groups depending on their characteristics.

농촌이주를 고려한 농촌마을개발 특성에 관한 연구 -전원마을조성사업 사례를 중심으로- (The Study of Characteristics of Rural Village Development Project For Rural Area Migration -Focused on Farming Village Development Projet-)

  • 한석종;강만호;손승광;주석중
    • 한국농촌건축학회논문집
    • /
    • 제13권1호
    • /
    • pp.63-70
    • /
    • 2011
  • This study is about characteristic of rural areas development project considering Rural Areas Migration. As a Rural Economy is getting worse for a rapid decrease in population and a rapid aging of the population, Decline in Rural areas has become more serious. So, Each local government is promoting rural areas development project, like Culture Village Project, Rural Village Project, Happiness Village Project, and Farming and Fishing New-town Project, to attract inhabitants in the Urban Area. This study examines the change of policy about rural areas development project in Corea through theoretical study, and analyzes the Implementation of rural village Project supported or implemented by local community to characterize the project.