• Title/Summary/Keyword: project approach

Search Result 1,375, Processing Time 0.025 seconds

How Does the Frequency of Instructor Feedback Affect Perceived Loafing and Team Performance in Team Project-Based Learning? A Moderated Mediation Approach

  • Ji Won YOU
    • Educational Technology International
    • /
    • v.24 no.2
    • /
    • pp.237-262
    • /
    • 2023
  • This study focuses on the instructor's role in student-centered learning and aims to test the effects and moderating role of instructor feedback on perceived loafing in team project-based learning. A conditional effect model including team efficacy, perceived loafing, instructor feedback, and team performance was proposed. Data were collected from students who registered for team project-based learning courses at a university in South Korea. A total of 420 cases were subjected to moderated mediation analysis. The results demonstrated that instructor feedback was negatively related to perceived loafing and moderated the relationship between team efficacy and perceived loafing. Furthermore, instructor feedback moderated the relationship between perceived loafing and team performance. In particular, even when perceived loafing was high, students who received frequent instructor feedback were found to significantly reduce the damage to team performance. Based on these findings, the importance of instructors' facilitation in team project-based learning is discussed.

THE INFLUENCE OF THE PROJECT MANAGER ON THE SUCCESS OF THE CONSTRUCTION PROJECTS

  • Mahdi M Abdulsamad Ali;Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.345-353
    • /
    • 2009
  • The success and failure of any project depends upon many factors, the Project Manager is considered to be the key contributor to the success of any project, as well as a guide to the team members to achieve the client satisfaction (Cost, Time and Quality). Therefore the main aim of this paper is to provide a practical approach for understanding the importance of the Project Manager and his effectiveness to the success of the construction projects. In addition, the Project Manager's roles, responsibilities and duties have direct impact to the success of the construction projects. In order to identify the thoughts and opinion of the construction industry on this particular assertion, a quantitative study was carried out within the UK construction industry. The result of the study shows that there is an extremely strong correlation between the Project Manager and the success of the construction projects. In construction projects the Project Manager is considered to be one of the most important people who can lead and drive the projects in the right direction and conclude construction projects successfully. Moreover, these can play the most important role regarding the improvement of the organization's performance, the organization's profitability and the client's satisfaction. The research confirmed that the Project Manager is a very essential element to the success of the construction project and have an impact at every stage of the construction project. So it concluded that selection of a Project Manager should be carefully done with regard to experience, knowledge, power/authority and good understanding to the kind of the project.

  • PDF

Designing a Fuzzy Expert System with a Hybrid Approach to Select Operational Strategies in Project-Based Organizations with a Selected Competitive Priority

  • Javanrad, Ehsan;Pooya, Alireza;Kahani, Mohsen;Farimani, Nasser Motahari
    • Industrial Engineering and Management Systems
    • /
    • v.16 no.1
    • /
    • pp.129-140
    • /
    • 2017
  • This research was conducted in order to solve the problem of selecting an operational strategy for projects in project-based organizations by designing a fuzzy expert system. In the current research, we first determined the contributing parameters in operational strategy of project-based organizations based on existing research literature and experts' opinion. Next, we divided them into two groups of model inputs and outputs and the rules governing them were determined by referring to research literature and educational instances. In order to integrate rules, the revised Ternary Grid (revised TG) and expert opinions were applied according to a hybrid algorithm. The Ultimate rules were provided in Fuzzy Inference System format (FIS). In this FIS, proper manufacturing decisions are recommended to the user based on selected competitive priority and also project properties. This paper is the first study in which rules and relations governing the parameters contributing operational strategy in project-based organizations are acquired in a guided integrated process and in the shape of an expert system. Using the decision support system presented in this research, managers of project-based organizations can easily become informed of proper manufacturing decisions in proportion with selected competitive priority and project properties; and also be ensured that theoretical background and past experiences are considered.

Application of CCPM to Construction Project (건설프로젝트에 CCPM의 적용)

  • Kim Young;Lee Young-Dae;Kim Ok-Su;Kim Sung-Hwan;Park Hyeok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.95-101
    • /
    • 2003
  • The Theory of Constraints (TOC) is an approach and a philosophy that is used to develop specific management techniques. It was first popularized by the novel, The Coal, that applied the principles to operations management. Since 1997 it has found application in two areas within project management The first application is scheduling of a sing1e project to reduce project duration and simplify project control. there is a further application to allocate resources that are shared by concurrent project. It is the objective of this paper to explore the fundamentals of critical chain and to pursue an application of critical chain method to construction project by a case study.

TOTAL RISK INDEX FOR ASSESSING RISK LEVELS OF OVERSEAS CONSTRUCTION PROJECTS

  • Du Yon Kim;Seung Heon Han;Heedae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1414-1418
    • /
    • 2009
  • International construction projects typically manifest difficult, complex, and varied types of risk exposures; because of this, there is a need for accurate evaluation of risk-integrated performances during the timeframe of project execution. Given the financial crisis currently affecting the world economy recession, risk management has become a more crucial part for the success of international project management. However, the majority of risk management approaches, particularly for overseas projects, are focused primarily on simple forms of checklists, formalization of risk variables affecting project performance for a specific phase, or more complicated computational methods that restricting practical utilization in real-world projects; moreover, these methods lack the conceptual basis to broadly visualize the level of risk over all phases of a project. This study suggests an efficient, yet simple risk-integrated total index to successfully assess the risk levels of overseas construction projects. To this end, this paper first investigates the life cycles and key processes of decision-making for a given project and then derives formulas to represent the total risk index (TRI) along the key decision-making processes. In addition, the study examines the relationships between TRI and performance levels based on the analysis of 126 real-world project samples. Validations using the proposed TRI showed a high correlation to project performance, signifying the usefulness of the proposed approach for construction firms when investigating the level of risks and key areas for management focus.

  • PDF

Analysis of the Impact of Enterprise Risk Management (ERM) on the Project Success through PRM Process: Focused on the Overseas Construction Projects (전사적 리스크 관리(ERM)가 프로젝트 리스크 관리(PRM) 향상을 통해 프로젝트 성과에 미치는 영향 분석: 해외 건설사업을 중심으로)

  • Sullim Jung;Seung-Chul Kim;Dae-Cheol Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.47 no.2
    • /
    • pp.93-106
    • /
    • 2024
  • As the complexity and uncertainty of international construction projects increase, the importance of risk management capabilities in the construction industry has become more pronounced. Accordingly, Enterprise Risk Management (ERM) has become a widely adopted approach among organizations as a new way for more effective risk management. Despite its growing application, research related to ERM is still in its infancy, and most of the existing studies have been limited to financial industries. Therefore, this study aims to empirically examine the influence of ERM's core elements on project risk management (PRM) and project performance within construction firms. Our findings indicate that the key ERM components-organization, policy, and culture-significantly enhance PRM processes, underscoring their critical role and importance. Additionally, effective PRM positively affects project outcomes, highlighting its significance for construction companies engaged in international projects. While ERM does not directly impact project performance, it indirectly improves outcomes through enhanced PRM capabilities. It suggests that ERM will contribute to the firm's performance by improving the firm's PRM capability through policies and a risk-focused culture corresponding to the adopted ERM organization and system..

A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.