• Title/Summary/Keyword: progress management

Search Result 1,551, Processing Time 0.027 seconds

The Concept of Schedule and Cost Progress Integrated Management on the BDM Network (BDM 네트워크 공정 및 비용 진도율 통합관리 개념)

  • Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.54-64
    • /
    • 2011
  • Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.

Development of Construction Process Safety Information Management System for Safety Accident Prevention (안전사고 예방을 위한 건설업 공정 안전 정보 관리 시스템 개발)

  • Jun Hyun Jong;Yang Kwang Mo;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.11-23
    • /
    • 2005
  • It is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

A Study for Productivity Progress of Assembly Process Improvement for manu/auto open and closed type air-machine (수/자동 개폐식 환풍기 조립공정개선을 위한 생산성 향상에 관한 연구)

  • 정영득;박주식;오지영;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.3
    • /
    • pp.107-116
    • /
    • 2001
  • The purpose of this paper is to solve the problem that is occuring in assembly process and to progress the productivity by process analysis methods for manu-open and closed model(DWV-20/25DRG), and auto-open and cloesd model(DWV-20/25/DRA)-ventilation fan. Also, this paper is studied by data of 'D' company's product.

  • PDF

Development of Telepresence System for Schedule Management in Railway Construction Project (철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Park, Jin-Jung;Moon, Hyoun-Seok;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.23-30
    • /
    • 2010
  • In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.

Development of automatic alert populating system of earth structures based on sensor monitoring (센서 모니터링을 활용한 토류구조물 상황전파 자동화 시스템 개발)

  • Kim, Yong-Su;Ahan, Sang-Ro;Jung, Jae-Hyun;Han, Sang-Jea;Jung, Seung-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.667-672
    • /
    • 2009
  • Gathering information and systemization of infrastructure disaster management is to reduce uncertainties in making decisions and maximize the number of alternations. The key objects of a sensor-based progress report and propagation automation systems are to provide objective data, realize and support decision making and deliver them to a certain area, department, manager and other people rapidly. The major findings and results of this study are as follows. 1) Application of international standard-based alerting protocol(CAP; Common Alerting Protocol). 2) Development of database of existing progress report and propagation manual in order to achieve networking of safety management on major social infrastructure of the nation. 3) Development middleware application programs to progress report and propagation data using SMS, FAX, EMS, VMS, MMS.

  • PDF

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

Present Status and Prospects of Horticultural Seed Industry (원예종묘산업의 현황과 발전전망)

  • Kim Byung Soo;Om Young Hyun
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 1998.10a
    • /
    • pp.336-352
    • /
    • 1998
  • The horticultural seed industry has made great progress in the last fifty years of its history after the independence of this country. The industry has accomplished self-sufficiency in major vegetable seeds and has even gained international competitive edge in certain crop seeds, particularly in hybrid cultivar development. However, the industry is facing a crisis at present coming from excessive competition among the domestic seed companies as well as the foreign currency crisis of the country. Several major seed companies have already been acquired by multinational corporations. Many people in the country as well as agriculturists are concerned about this situation. Although it is true that the industry is undergoing hard times, this crisis can be turned into a chance for making new progress depending on the joint efforts of the groups responsible, i.e., private companies, public institutions, and policy makers. Therefore, we have to turn this crisis into an opportunity for self-reform and progress. We should not be discouraged or give up. We Propose some ideas for the Progress of the seed industry. Public institutions and policy makers should do such things in cooperation as 1) training human resources for future breeders, 2) securing a wide range of genetic resources and improvement of the management system, 3) basic science research including biotechnology, 4) releasing breeding stocks from germplasm enhancement through use of exotic accessions, 5) support for breeding region- or use-specific cultivars, and 6) collection of foreign agricultural information for breeding cultivars for overseas markets. Eventually the responsible group for the final development of commercial cultivars, production, sales and management is private companies. Therefore, private companies also should have to do their best to develop competitive cultivars with a missionary spirit and endeavor for both domestic and overseas markets in cooperation with public institutions. Management based on competition, professionalism and rationalism is also urged. We are going to conclude with optimism that we can make a new vault of progress once the private and public sectors closely cooperate for the development of Korean horticultural seed industry by overcoming this crisis.

  • PDF

A Study on the Application to PSM (Process Safety Management) Policy in the Construction (건설현장의 PSM(Process Safety Management) 제도 적용에 관한 연구)

  • 양광모;전현정
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.21-30
    • /
    • 2003
  • In this paper, we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.