• Title/Summary/Keyword: productivity and cost

Search Result 1,367, Processing Time 0.026 seconds

Optimization of productivity in the rehabilitation of building linked to BIM

  • Boulkenafet Nabil;Boudjellal Khaled;Bouabaz Mohamed
    • Advances in Computational Design
    • /
    • v.8 no.2
    • /
    • pp.179-190
    • /
    • 2023
  • In this paper, building information modelling (BIM) associated to the principle of significant items emerged at quantities and costs in the optimization of productivity related to the rehabilitation of the building where proposed and discussed. A quantitative and qualitative study related to the field of application based on some parameters such as pathology diagnosis, projects documents and bills of quantities were used for model development at the preliminary stage of this work. The study identified 14 quantities significant items specified to cost value based on the use of the 80/20 Pareto rule, through the integration of building information modelling (BIM) in the optimisation of labour productivity for rehabilitation of buildings. The results of this study reveal the reliability and the improvement of labour productivity using building information modelling process integrating quantities and cost significant items.

Development of Chip-harvester for Collecting Forest Biomass and an Analysis of Productivity and Cost of Operation (산림바이오매스 수집용 칩하베스터의 개발과 생산성 및 비용 분석)

  • Kim, Jae-Hwan;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.106 no.1
    • /
    • pp.54-62
    • /
    • 2017
  • This study was carried to develop the chip-harvester and to analysis the operation productivity and cost for effective collection and forwarding of forest biomass. Main target specification of chip-harvester is speed of 8km/h, maximum climbing capacity of $30^{\circ}$ and maximum load capability of 2000 kg. Body structure is articulate type to reduce turning radius. Driving equipment is six-wheel drive, and a rear wheel is tandem bogie type to increase grip force. As a result of the driving test about developed chip-harvester, driving speed was 6.9 km/hr and 8.1 km/hr in ${\pm}10%$ slope with loaded and 7.3 km/hr and 7.9 km/hr in ${\pm}10%$ slope without load. As a result of the operation productivity and cost, operation productivity of grinding and forwarding was approximately $10m^3$ per day, and operation cost was 393,126 won per day.

Harvesting Cost and Productive of Tree-Length Thinning in a Pinus densiflora Stand Using the Tower Yarder (HAM300)

  • Cho, Minjae;Cho, Koohyun;Jeong, Eungjin;Lee, Jun;Choi, Byoungkoo;Han, Sangkyun;Cha, Dusong
    • Journal of Forest and Environmental Science
    • /
    • v.32 no.2
    • /
    • pp.189-195
    • /
    • 2016
  • Logging equipment and method have a major influence on harvesting productivity and cost. This study investigated the productivity and operational costs of tree-length cable yarding system using HAM300, a domestically developed tower yarder. We tested HAM300 for thinning operation in Pinus densiflora stands at Gangreung, Gangwon-do on April, 2014. To assess the productivity we conducted time study for each stage of the operation. When the average time/cycle was examined for each stage of the operation, the longest was for yarding (241 sec), followed by delimbing (237 sec), felling (153 sec), and processing (103 sec). Furthermore, productivity for felling was $8.6m^3/hr$, followed by delimbing ($5.1m^3/hr$), yarding ($3.5m^3/hr$), and processing ($8.1m^3/hr$). The total cost for the tree-length logging system was $58,446won/m^3$, of which the majority was incurred by the yarding cost at $46,217won/m^3$ (79.3%), whereas the lowest cost was for felling at $2,359won/m^3$ (4.1%). We suggest that it is necessary to foster specialized operators and provide training in operating the tower yarder thereby implementing efficient harvesting system resulting from low-cost yarding.

Estimation of Productivity Losses due to Smoking (흡연으로 인한 생산성 손질 추정)

  • 김태현;문옥륜;김병익
    • Health Policy and Management
    • /
    • v.10 no.3
    • /
    • pp.169-187
    • /
    • 2000
  • Cigarette smoking has been identified as the most important source of preventable morbidity and premature mortality (WHO, 1995), The prevalence of smoking among men is very high in Korea. This study estimated productivity losses due to smoking in Korea, 1997. The derivation of cost estimates for mortality, disability, hospitalization and use of physician services related to cigarette smoking is bas 어 on the calculation of attributable fractions suggested by MacMahon and Cole and Smoking-Attributable Mortality, Morbidity, and Economic Cost(SAMMEC) software. To estimate the number of deaths from neoplastic, cardiovascular, respiratory diseases associated with cigarette smoking, estimates for adults(aged 20 years and over) were based on 1997 mortality data, 1995 data on smoking prevalence from Korea Institute for Health and Social Affairs. Smoking-attributable indirect morbidity cost data were obtained from the National Federation of Medical Insurance. As the result of cost estimation, these productivity losses were 336-430 billion won. During 1997, 8,620-10,804 deaths were attributed to smoking. Cigarette smoking resulted in 133,991-169,422 Years of Potential Life Lost (YPLL) to life expectancy. For smoking -attributable indirect mortality costs, the present value of future earnings(PVFE) for the age at death are 299-384 billion won. Smoking-attributable indirect morbidity costs, the costs of lost productivity for persons who are disabled by smoking-related chronic diseases are 37-46 billion won. In this study the productivity losses due to smoking were restricted to the health effects of smoking. It is possible that these costs were underestimated with the limitation of the data. Smoking is the leading preventable cause of illness and death. The results of this study can be used as elementary data for antismoking policy.

  • PDF

Study on Influence of Standardization of Agricultural Product Packages on Cost in Hypermarekts

  • Shin, Hyeong-Jin;Lee, Sang-Youn
    • Journal of Distribution Science
    • /
    • v.8 no.4
    • /
    • pp.35-41
    • /
    • 2010
  • Although dictionary definition of standardization is 'to prevent disordered complexity and to make and use rules for reasonable simplification or unification, from a position of shop-floor operations of distribution, it is directly connected to efficiency, that is 'productivity equals cost savings'. This study analyzed influence of standardization of agricultural product packages in hypermarkets on costs in stakeholders of distribution channel such as suppliers, distribution centers and hypermarkets. The research findings demonstrated that it would influence manufacturing costs of suppliers and improve shop productivity of hypermarkets.

  • PDF

Productivity, Cost, and Optimal Forest Road Network Density of Tree-length Yarding Operations with Tower Yarder (타워야더를 이용한 전간집재작업의 생산성 및 비용과 적정 노망밀도 분석)

  • Kim, Min-Kyu;Baek, Seung-An;Cho, Koo-Hyun;Jung, Do-Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.106 no.3
    • /
    • pp.300-309
    • /
    • 2017
  • The productivity, cost, and optimal forest road network density for tree-length yarding with K301-4 and HAM300 tower yarders were analyzed. The results showed that productivity decreased as the yarding distance increased. The productivity of the K301-4 was greater than that of the HAM300 as the maximum yarding distance was longer than 34 m. This difference increased as the load volume increased. As the K301-4 yarder had a higher purchase price and it took more time to set up compared to the HAM300, the HAM300 was cost effective. Therefore, in oder to introduce tower yarders to reduce operational cost, it is effective to increase the load volume during operations and to utilize the road network repeatedly for a long period.

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

Projection of Activity Duration Utilizing Historical Cost Data (자원투입 비용을 고려한 공정관리 작업기간 산정)

  • Moon, Sung-Woo;Kang, Sang-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.444-447
    • /
    • 2006
  • Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.

  • PDF

Transition from Cost Minimizing Management to Cost Pass-along Management in U.S. Manufacturing Industries (미국 공업에 있어서 비용 극소화 관리로 부터 비용 전가식 관리로의 변천)

  • Hong, Byeong-Yu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.6 no.1
    • /
    • pp.9-15
    • /
    • 1980
  • By the mid 1960's the rate of productivity growth in the manufacturing industries of the United States reached the lowest level ever recorded in the American economy. As a result the cost-offsetting operations that had been a century-long part of cost minimizing became less feasible. U.S. manufacturing firins apparently embarked on a pattern of a cost pass-along management. Accounting for price variation as a function of a shift from cost minimizing to cost pass-along is the main subject of this investigation. An econometric model of the inflation process is presented which indicates a clear shift in the modal behavior of manufacturing industries from cost minimizing (1948-1964) to cost pass-along (1965-1975). The latter behavior, initially triggered by the drag of resource diversion on the productivity growth process, undermines the pressure toward productive efficiency that is at the core of industrial engineering, and at the center of U.S. industry's ability to remain competitive.

  • PDF

Comparative Analysis of Construction Productivity for Modernized Korean Housing (Hanok) (보급형 신한옥 개발을 위한 건설 생산성 분석)

  • Kim, Min;Kim, Yesol;Lee, YunSub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.107-114
    • /
    • 2013
  • The interest in traditional Korean housing has greatly increasing in Korean housing market. However, it is difficult to wildly disseminate for a high construction cost reason. In order to effectively facilitate the Hanok construction, Korean government has initiated a project that develops a new style Korean housing, which meets the requirements of low cost and modernized life style. Cost of building is mainly affected by materials and construction methods. Hanok has some special commodities those significantly impact the cost. In order to effectively cut down the costs, well-organized planning for costs is very important. Also, improving the productivity by utilizing new materials and methods can result in cost down. In this context, this paper compared and analyzed two different types of Korean housing; one is a modernized Korean house which used new materials and methods, the other is a traditional Korean house which was build up by purely traditional methods. Productivity has also been compared and analyzed for 5 major commodities between two types of models. Based on these comparative data, effect of cost down by new model has been analyzed. As a result it is confirmed that by using the new materials and methods could highly effect to increasing productivity and cost down. Especially, the cost of Roofing have been more influenced by using new material while the Wood and Finishes have been influenced by new construction method. Construction cost of Foundation (Earthwork, Concrete, Masonry) and Openings were influenced both factors, changing of materials and methods.