• 제목/요약/키워드: production well

검색결과 6,469건 처리시간 0.132초

Can you predict the production performance using the make-ready performance?: Cases on highway construction projects

  • Yong-Woo Kim;Jinwoo Jang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.914-919
    • /
    • 2009
  • The research investigates for the relationship between the operating performances of the make-ready process and project production performance. To this end, the researchers proposed a metric of PCR (Percentage of Constraint Removal) to measure the make-ready performance. The study measured the production performance in two ways: production planning reliability and progress performance. We hypothesized that how well the make-ready process is performed has an impact on the degree of production performance. The statistical analyses are used to investigate that how operating performance of the make-ready process affects project production performance. The results of the regression analysis support our hypotheses (p<0.25) and correlation coefficients for the relationship between project production performance and make-ready performance are also significant (p<0.05).

  • PDF

Opposite Roles of B7.1 and CD28 Costimulatory Molecules for Protective Immunity against HSV-2 Challenge in a gD DNA Vaccine Model

  • Weiner, David B.;Sin, Jeong-Im
    • IMMUNE NETWORK
    • /
    • 제5권2호
    • /
    • pp.68-77
    • /
    • 2005
  • Background: Costimulation is a critical process in Ag-specific immune responses. Both B7.1 and CD28 molecules have been reported to stimulate T cell responses during antigen presentation. Therefore, we tested whether Ag-specific immune responses as well as protective immunity are influenced by coinjecting with B7.1 and CD28 cDNAs in a mouse HSV-2 challenge model system. Methods: ELISA was used to detect levels of antibodies, cytokines and chemokines while thymidine incorporation assay was used to evaluate T cell proliferation levels. Results: Ag-specific antibody responses were enhanced by CD28 coinjection but not by B7.1 coinjection. Furthermore, CD28 coinjection increased IgG1 production to a significant level, as compared to pgD+pcDNA3, suggesting that CD28 drives Th2 type responses. In contrast, B7.1 coinjection showed the opposite, suggesting a Th1 bias. B7.1 coinjection also enhanced Ag-specific Th cell proliferative responses as well as production of Th1 type cytokines and chemokines significantly higher than pgD+pcDNA3. However, CD28 coinjection decreased Ag-specific Th cell proliferative responses as well as production of Th1 types of cytokines and chemokine significantly lower than pgD+pcDNA3. Only MCP-1 production was enhanced by CD28. B7.1 coimmunized animals exhibited an enhanced survival rate as well as decreased herpetic lesion formation, as compared to pgD+pcDNA3. In contrast, CD28 vaccinated animals exhibited decreased survival from lethal challenge. Conclusion: This study shows that B7.1 enhances protective Th1 type cellular immunity against HSV-2 challenge while CD28 drives a more detrimental Th2 type immunity against HSV-2 challenge, supporting an opposite role of B7.1 and CD28 in Ag-specific immune responses to a Th1 vs Th2 type.

Sensititivity Analysis For Development Of Gulf Of Alaska

  • Pak, Ee-Tong
    • 한국해양학회지
    • /
    • 제11권2호
    • /
    • pp.57-63
    • /
    • 1976
  • It was attempted to analyze the sensitivity of the oil prospect place named MARIA which placed inside Gulf of Alaska. For the analysis, P6031090, ECOANA( computer) which installed in the head office, Shell Oil Co was used and the data needed for computer programming were 1) Unit of Production data 2) Production Schedule 3) Total Gross Yearly Expenses and 4) Total Gross Capital and so on. The important data among the computer output 1) PVPAT (Present Value After Tax): $1,167,077,500 2) Payout After Tax: 3.14 Years (256,284,810 BBL Production) 3) Earning Power: 42% (After Tax) 4) PVPAT/BBL : $1.22 5) Capital/BBL : $2.00. On the other hand, the effect acted upon PVPAT with varying the Platform cost, Facility cost, Pipeline cost and Well cost was observed in comparion with the basic for range from 50% to 200%. Resultantly, the order was 1) Pipeline cost 2) Facility cost 3) Well cost 4) Platform cost for range form 100% to 200%. This project was completed by the contract with Shell Oil Co., and the geological data needed for this analysis were given by the head office and the development project started from Jan. 1976.

  • PDF

일본어 특수박의 지속시간에 관한 음향음성학적 분석 (An acoustic study on the duration of the morn in Japanese)

  • 김선희
    • 대한음성학회지:말소리
    • /
    • 제38호
    • /
    • pp.113-124
    • /
    • 1999
  • It is well known that Japanese prosodic structure assumes mora below the syllable tier. Syllables with V or CV structure are counted as having one morn whereas those with coda consonants /-pp, -tt, -kk, -ss, -N/ or long vowels are counted as having two morns in Japanese. This study measured the acoustic duration of these special moras ('tokusyuhaku') produced by Tokyo dialect speakers to see if they are isochronic with V or CV. It also examined the production of Korean(Seoul/Kyungsang dialect) and Chinese native speakers loaming Japanese as a second language to examine how the learners' first language influence their second language. Finally, it examined how speakers of the Akita dialect, which is blown as a syllabeme dialect in Japanese, produced them. The results showed that intra-speaker variation as well as inter-speaker variation was observed in the production by Akita dialect speakers. Production of native speakers of Chinese and Kyungsang dialect of Korean -- which have vowel length contrast in their phonological systems -- showed a similar result to Tokyo dialect speakers, which implies the influence of the learners' first language on the acquisition of the second language.

  • PDF

Flower Habitat Supplementation can Conserve Pollinators and Natural Enemies in Agricultural Ecosystem: Case Study in the Pepper Field

  • Lee, Changyeol;Jung, Chuleui
    • 한국양봉학회지
    • /
    • 제34권2호
    • /
    • pp.141-147
    • /
    • 2019
  • Pollinators play important roles for crop production as well as maintenance of wild plants' reproduction. Pollinator dependency in Korean agriculture have increased, but the degradation of habitat quality pose significant threats to pollination in agroecosystem. Provisioning flower habitat is one of the major activities to increase pollinator abundance and richness. We tested the effect of flower habitat supplementation on the pollinator, pest and natural enemy abundance in pepper field. Results showed that Hymenopteran pollinators were more abundant in the pepper plots close to the flower habitat. Among natural enemies, the similar pattern from pollinators was observed to parasitoids in the family of Eulophidae, but not to those of Ichneumonidae. There were no statistically significant differences of insect pests like aphids and thrips, as well as pepper production among plots in the pepper field. Even limited spatial scale, this study showed supplementing the flowering plant habitat to the agricultural landscape could conserve and boost pollinators and natural enemies, and possibly resulting better fruit production by pollination service.

생산정보를 이용한 자동차 조립 서열시스템에 관한 연구 (Automobile Assembly Sequence System Using Production Information)

  • 옥영석;김병수;배준희
    • 산업경영시스템학회지
    • /
    • 제37권3호
    • /
    • pp.8-15
    • /
    • 2014
  • For zero inventory and mixed assembly production, JIT (Just In Time) production system in Toyota and JIS (Just-In-Sequence) production system in Hyundai motor co. have been proposed in automobile production areas. Even though the production systems are popular in the areas, many subcontract companies producing part-modules for final production at a parent company suffers from excessive or shortage amount of inventory due to the time gap of production and delivery to the parent company. In this study, we propose an efficient real-time assembly sequence system applying a well-known Pareto method using Paint-In information in painting process and daily production planning information. Based on this system, a production line can estimate the shortage amount of UPH (Units Per Hour) at production line and recovers the amount before operating assembly production in the line. The proposed system provides efficiency on productivity compared with the previous system.

Data Collection Methodology of Activity Production Rates for Contract Time Determination

  • 허영기;김창완;송종철
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.114-123
    • /
    • 2004
  • Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.

서울.경기지역 도시락 제조업체의 구조 및 생산 실태조사 (Assessment of the Working Environment, Production and Transportation Practices for the Packaged Meal(Dosirak) Manufacturing Establishments in Seoul City and Kyungki-do Province)

  • 계승희;윤석인;곽동경
    • 한국식생활문화학회지
    • /
    • 제3권3호
    • /
    • pp.293-299
    • /
    • 1988
  • 34 packaged meal (Dosirak) manufacturing establishments were assessed in terms of working environment, production and transportation practices. Questionnaires and facility check-lists were developed. Most establishments were small in business, and production personnel as well as production facilities were insufficient compared with production capacity of establishments. Mean production capacity for packaged meals in terms of optimum and maximum levels were 6,500 and 15,166 meals in large sized establishments; 2,662 and 8,301 in medium; and 2,112, and 4,733 in small respectively. Those figures indicate potentially hazardous practices in production especially in small and medium sized establishments. Most meals were produced to order. Transportation facility and kitchen space were assessed as insufficient.

  • PDF

The effect of the dissolved oxygen concentration on the production of manganese peroxidase by Phaenerochaete chrysosporium

  • 최수형;구만복
    • 한국생물공학회:학술대회논문집
    • /
    • 한국생물공학회 2000년도 추계학술발표대회 및 bio-venture fair
    • /
    • pp.171-174
    • /
    • 2000
  • 본 연구는 용존산소의 양에 따른 MnP의 생산양상을 체계적으로 연구하였으며, 과량의 산소 공급 시 MnP 생산이 저해될 수 있음을 산소공급에 따른 과량의 $H_2O_2$생산 측면에서 설명하고 있다. 또한 보다 높은 MnP 생산을 위한 산소공급방법을 제시하고자 하였다.

  • PDF

중소기업에서 생산시간 감소를 위한 생산시스템 설계에 관한 연구 (A Study on Design of Production System for reducing Production Time in the Small and Medium Business)

  • 조석호;양광모;서장훈;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 추계학술대회
    • /
    • pp.203-206
    • /
    • 2003
  • Each method for economic evaluation has its own characteristics. Therefore adoption of each of them in evaluation production investment project results in many problems. Hence combination & modification of them are required to perform more accurate evaluation about investment project. This paper discuss evaluation method of investment projects expansion and replacement investment on each line or individual in the production. Generally investment evaluation method has add to a few method by Subsidiary means with use a especial method. And then in this paper, a Taguchi Techniques is presented, which may be effective to the facilities appraisal or improvement. We propose a decision model to incorporates the values assigned by a group of experts on different factors in production. Using this model, SN ratio of taguchi method for each of subjective factors as well as values of weights are used in this comprehensive method for reducing production rate in production management.

  • PDF