Risk Assessment and Contingency Prediction considering Work Characteristics for Modular Plant Construction Projects (모듈러 플랜트의 업무특성을 고려한 위험 평가 및 예비비 예측)

  • Kang, Hyunwook;Kim, Jongwook;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.81-89
    • /
    • 2018
  • The purpose of this study is to assess the risk and predict the contingency for modular plant construction projects. Considering the work characteristics of the modular plant, The adapted research method is that suggest models for assessment impact of risk and predict the contingency considering risk. Based on the proposed models, It is selected one modular plant construction project and assessment impact of risk factors and predicted the contingency. The results of this study are as follows: Assessment the probability of occurrence of risk factors and intensity of impact, and extract 15 important risk factors. These are classified as Engineering, Procurement, Fabrication, Transportation, Construction phases to consider the work characteristics of the modular plant. The predicted contingency is that 6.739%(Engineering 2.850%, Procurement 6.225%, Fabrication 6.211%, Transportation 4.165%, Construction 8.168%) to prepare the basic business expense. The model is used as a way to derive quantitative results in the decision-making process for risk management in construction projects.

An Analytical Study on the Durability Standard of Ground Structures Monitoring Sensors (지반구조물 계측센서의 내구연한 기준에 대한 분석적 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.53-59
    • /
    • 2021
  • Purpose & Method: The purpose of this study is the theoretical study on the durability standard of ground structures monitoring sensors. A survey on the durability criteria for construction monitoring sensors of domestic construction companies and the income tax implementation regulations, the standard years of contents such as buildings and the standards of the Public Procurement Service for construction monitoring and construction machinery were analyzed. Result: The durability criterion such as the inclination meter and the strain gauge, which are purchased from the Public Procurement Service prior to installation on the ground structure, is 8 to 10 years. Conclusion: The actual durability analysis by comparing the reliability of various monitoring sensors installed in dams at home and abroad, As a result of comprehensive study on the loss and damage rate of the maintenance monitoring sensor installed in the tunnel, the proper durability period of the built-in type monitoring sensor such as domestic pore pressure meter and earth pressure meter installed in the structure or the ground is 5 to 8 years it seems reasonable.

A Fundamental Study on the Causes of Defects in Landscape Construction Projects Based on the Ratio of In-House and Supplied Materials -Focused on Incheon Metropolitan City- (조경공사업에서 관급자재·사급자재 비율에 따른 하자 원인에 대한 기초연구 -인천광역시 사례를 중심으로-)

  • Sang-Won Hwang;Sung-Jin Yeom;Chung-In Park
    • Journal of Environmental Science International
    • /
    • v.32 no.11
    • /
    • pp.821-831
    • /
    • 2023
  • Recently, landscaping construction has played a significant role in enhancing the quality of life for citizens by creating and maintaining outdoor spaces. However, landscaping projects vary in material procurement depending on the contracting method, and they also present various challenges in defect occurrence and defect rectification due to their specialized nature. In this study, we classified different types of projects based on material procurement ratios and conducted on-site assessments of defect status by specific processes. We also analyzed the itemization of material ratios and defect rectification costs. The results revealed it was found that projects with a higher proportion of government-provided materials had the poorest defect status in terms of planting works and also incurred the highest defect rectification costs. Moreover, conflicts concerning the responsibility for defects arose. Currently, there are no specific guidelines for setting standards for the proportion of government-provided materials in landscaping construction contracts. Furthermore, there is ambiguity in the management of defect rectification. Therefore, it is necessary to establish a systematic landscaping construction contracting framework by providing institutional guidelines tailored to local governments or the circumstances of contracting entities and to conduct thorough reviews of construction processes.

A study on the Construction Procurement System at Multi-Trade Contract Method (다중시공방식에서 합리적인 공사 분리발주 방안)

  • Kim, Se-Bum;Jeon, Min-Chang;Lee, Sang-Beom;Kim, Dae-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.62-63
    • /
    • 2015
  • In this paper, to prevent overspending of the CM Fee, Agent CM for the normal work-oriented, Willing to separate order model being used in the construction, using a multi-national grouping Go to offer the right company, a number of groups according to the appropriate CM Fee setting is aimed to suggest a reasonable basis. This paper does not use the domestic point of order characteristic of the model, and using a different theory of affinity grouping projection method is presented. The main disadvantage of the domestic order model because it is a contractual relationship, the contractual relationship as unified as possible by the most reasonable way of construction and construction capabilities and commercialization agreement upon the ability of companies also expect to be very helpful. The grouping by using the multi-order construction of the separation problem of the increase and thus the management object construction type administration was to solve the problem.

  • PDF

A Planting Study on the Development of Eco-friendly Reinforced Earth-Retaining Wall Using Planting Green Net (환경친화형 그린넷 보강토 옹벽 개발을 위한 식생시험 연구)

  • Chung, Dae-Seouk
    • Journal of Environmental Science International
    • /
    • v.16 no.9
    • /
    • pp.1099-1102
    • /
    • 2007
  • This paper presents eco-friendly planting method to overcome the problems of existing concrete retaining wall and gabion retaining wall, respectively, based on the examination on existing concrete and gabion retaining wall. Prior to doing this, proper design method was provided through pull out test. Planting method using gabion metal net and L shape green net retaining wall were compared and analyzed. According to this study, it is confirmed that reduction of construction period and economical profit in construction can be achieved by both manufacturing at the factory and self procurement at the job site as well as the use of metal net, which is applied as a substitution of existing strengthening material. For the effect of planting method, the use of L shape green net retaining wall shows superiority to environment-friendly gabion retaining wall in its ability to rootage and germination of the grass. The L shape green net retaining wall had excellent performance in helping rootage of grass and prevention of soil leakage, and even if raining period, remarkable damage of planting mat does not occur when planting mat is applied.

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

Safety Stock Management Framework for Semiconductor Enterprises Under Demand and Lead Time Uncertainties (반도체부품 수요 및 납기 불확실성을 고려한 안전재고 설정 프레임워크)

  • Ho-Sin Hwang;Su-Yeong Kim;Jin-Woo Oh;Se-Jin Jung;In-Beom Park
    • Journal of the Semiconductor & Display Technology
    • /
    • v.22 no.2
    • /
    • pp.104-111
    • /
    • 2023
  • The semiconductor industry, which relies on global supply chains, has recently been facing longer lead time for material procurement due to supply chain uncertainties. Moreover, since increasing customer satisfaction and reducing inventory costs are in a trade-off relationship, it is challenging to determine the appropriate safety stock level under demand and lead time uncertainties. In this paper, we propose a framework for determining safety stock levels by utilizing the optimization method to determine the optimal safety stock level. Additionally, we employ a linear regression method to analyze customer satisfaction scores and inventory costs based on variations in lead time and demand. To verify the effectiveness of the proposed framework, we compared safety stock levels obtained by the regression equations with those of the conventional method. The numerical experiments demonstrated that the proposed method successfully reduces inventory costs while maintaining the same level of customer satisfaction when lead time increases.

  • PDF

Analysis of the Productivity and Effects of Administration Information System: Focused on KONEPS(Korea Online E-Procurement System) (행정업무시스템의 생산성 및 효과 분석: 나라장터 중심으로)

  • Kim, Hun-Hee;Oh, Changsuk
    • The Journal of Society for e-Business Studies
    • /
    • v.22 no.2
    • /
    • pp.123-136
    • /
    • 2017
  • The evaluation and analysis method of information system (IS) is studied from the system perspective, the user perspective, and the management viewpoint. The detailed analysis method performs qualitative evaluation by user questionnaire or expert opinion. In this study, Measures the productivity and the effect of building administrative information systems. In the previous study, qualitative productivity and universal effect indicators were used, but in this study, quantitative productivity indicators and indicators specific to administrative complaints were selected. KONEPS, an administrative service system, used electronic contract records and information recorded in the intermediate process. The information was converted into the number of days, and the productivity based on the input manpower was calculated. The effect analysis analyzed the questionnaire related to civil affairs, which is the goal of the administrative work system. Each factor was divided into reflective structural variable and formal structural variable, and internal consistency and multi-collinearity were diagnosed. In order to verify the model, the influence of the work was set as a hypothesis, the reliability was verified according to the descriptive statistics method, the influence was measured through the regression analysis, and the model was analyzed by the multiple regression model path coefficient. Model validation methods are Chi-square (df, p), RMR, GFI, AGFI, NFI, CFI and GFI as indicators according to CFA.

A Method of Information Management for BIM Based Building Permission (BIM기반 건축물 인허가 신청을 위한 정보 관리방안)

  • Yeo, ChangJae;Kim, Karam;Kim, Gutak;Yu, JungHo
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.242-251
    • /
    • 2016
  • Around the world, BIM application has been mandated. In Korea, an announcement was made in 2016 that BIM application will be required for all public constructions ordered by the Public Procurement Service. However, BIM cannot be used for building permits as Seumter, a building permit system, doesn't support BIM, even if it was used for building design. To utilize BIM for permit application, this study introduces a method of management for BIM-used permit application information. It was done by analyzing the data entered for new building permit application in Seumter. For the analysis, the permit application information is classified as internal BIM information and external BIM information and the required information is defined. To easily create and utilize the data types at the design stage, this study introduces a method of creating and utilizing a permit template. Also, this study developed a tool for combining the area information to add up all the related information such as gross floor area and floor area ratio. This study is significant in that it analyzes the required information for new building permit application among all the permit application types in Korea.

The Operational Method of the RFID Identification System for National Product Asset Management (국가물품자산관리를 위한 RFID 식별코드체계 운용방안)

  • Kim, Sun-Ho;Kim, Jin-Yong;Park, Jeong-Jae;Song, Ju-Hyung;Kim, Hyun-Min;Ann, Chong-Hwan
    • The Journal of Society for e-Business Studies
    • /
    • v.12 no.3
    • /
    • pp.19-31
    • /
    • 2007
  • In this research, we propose the operational method of the RFID-based NPI (National Product Identifier) which can manage product assets for the Korean government in the future. First of all, we present the operational concept of the national product asset management. Second, we suggest the structure of the NPI which accommodates ISO/IEC 15459 and the method to encode NPI and related data to ISO/IEC 18000-6C tags. Finally, we propose the operational business processes to generate and manage NPI in the stages of product procurement and product asset management.