• 제목/요약/키워드: process schedule

검색결과 745건 처리시간 0.026초

3 차원 FEM 을 이용한 CB100의 압연공정 및 롤 응력 해석 (Rolling Process and Roll Stress Analysis of CB100 using by 3D FEM)

  • 김정민;박춘수;우기만
    • 소성∙가공
    • /
    • 제19권2호
    • /
    • pp.101-106
    • /
    • 2010
  • CB100 is one of the channel type products in the steel beam. In this study, rolling process of CB100 is analyzed by 3D FEM simulation and rolling process. FEM simulation result is compared with rolling process data. Also the intermediate & finishing roll stress analysis is carried out and the suitability of the roll through roll stress resultant analysis is evaluated. In order to decrease the roll stress, new pass schedule is developed for stable load balance between intermediate and finishing rolling stand. Therefore new rolling pass schedule is verified by the analysis results of rolling process and roll stress. By the analysis results, the credibility of rolling process analysis was obtained and it was determined that the possibility of roll damage between intermediate and finishing mill was high. So the new pass schedule was developed. Through the result of rolling process and roll stress analysis, it was obtained that the reduction of roll stress and stable load balance.

INTEGRATION MODEL OF COST AND SCHEDULE IN STEEL BOX GIRDER BRIDGE PRODUCTION PROCESS

  • Seok Kim;Kyoungmin Kim;Seung-Ho Ha ;Kyong Ju Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1262-1267
    • /
    • 2005
  • It is still difficult to share and utilize the information generated at each phase of a steel box girder production process due to the spatial gap and different level of management information. The physical distance results in the inefficiency of the information transmission, the accidental omission and typos of the relative information, and so on. Various levels of management information make it difficult to embody a new management system. Eventually, these factors incur the loss of cost and schedule and interrupt development of a new management system. This paper analyzes a current process and presents graphical process flow by using IDEF0. Based this analysis, the research for new production process and work breakdown structure (WBS) is conducted. At the end of this paper, the conceptual design of this system is suggested. Through new management system, it is expected that the model proposed in this study will improve the management process in the steel box production, and the improved process will reduce the redundant cost and schedule information, transmission and deposit generated by manual paper.

  • PDF

전자태그와 컴퓨터 비전 시스템을 이용한 생산 공정 감시와 재일정계획 (Manufacturing process monitoring and Rescheduling using RFID and Computer vision system)

  • 공재현;한만철;박진우
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.153-156
    • /
    • 2005
  • Real-time monitoring and controlling manufacturing process is important because of the unexpected events. When unexpected event like mechanical trouble occurs, prior plan becomes unacceptable and a new schedule must be generated though manufacturing schedule is already decided for order. Regenerating the whole schedule, however, spends much time and cost. Thus automated system which monitors and controls manufacturing process is required. In this paper, we present a system which uses radio-frequency identification and computer vision system. The system collect real-time information about manufacturing conditions and generates new schedule quickly with those information.

  • PDF

크로스 롤러가이드의 다단형상인발공정 패스 스케쥴에 관한 연구 (A Study on the Pass Schedule of Multi-Pas Shape Drawing Process for Cross Roller Guide)

  • 이태규;이찬주;이상곤;이선봉;김병민
    • 소성∙가공
    • /
    • 제18권7호
    • /
    • pp.550-555
    • /
    • 2009
  • In the multi-pass shape drawing process, the pass schedule that includes the determination of reduction ratio and intermediate die shape is very important. This study used the equal reduction, equal load, and electric field analysis method for pass schedule of the multi-pass shape drawing. The reduction ratio was calculated by the equal reduction and equal load method. And the intermediate die shape was determined by the result of the electric field analysis and the calculated reduction ratio. The proposed pass schedule method was applied to a shape drawing for producing cross roller guide. Finally, FE-analysis and shape drawing experiment were performed to verify the effectiveness of the proposed method.

일정관리를 위한 Opportunity Tree 및 알고리즘 설계 (Opportunity Tree and Algorithm design to schedule management)

  • 이은서;이상호
    • 정보처리학회논문지D
    • /
    • 제12D권7호
    • /
    • pp.965-978
    • /
    • 2005
  • 소프트웨어 개발 시, 일정과 품질에 저해 요인이 되는 결함이 다수 존재한다. 일정과 품질의 저해 요인을 제거하고 동시에 체계적으로 이를 관리하기 위하여 본 논문에서는 opportunity tree 프레임워크를 설계한다. 유사한 프로젝트를 수행 시 영역 전문가의 지식을 활용한 opportunity tree 발생되는 문제점을 예측, 대비할 수 있게 하여, 소프트웨어 프로세스를 개선할 수 있다 본 연구에서는 소프트웨어 개발 시 발생하는 일정관리에 대한 결함을 찾아내고, 원인을 식별 및 해결책을 제시하고자 한다.

Automated Methodology for Linking BIM Objects with Cost and Schedule Information by utilizing Geometry Breakdown Structure (GBS)

  • Lee, Kwangjin;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.637-638
    • /
    • 2015
  • There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.

  • PDF

공동주택의 공기지연 원인분석 사레 연구 (A Case Study on Reason Analysis for Schedule Delay of Apartment House)

  • 박창욱;윤석헌
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.89-94
    • /
    • 2009
  • A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site.

공정리스크의 정량적 도출을 위한 기초적 방법 (Quantitively deducing basic method of construction schedule risk)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 - (The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work -)

  • 서상욱;윤유상;김선국
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.177-185
    • /
    • 2005
  • 건축공사에서의 리스크 관리자들은 전체 공기에 영향을 미치는 공정리스크 관리에 대한 중요성에 대해 공감하고 있지만 그 에 대한관리 절차 및 도구 등이 체계화되어 있지 않아 공정관리에 어려움을 겪고 있다. 또한 기존의 리스크 관련 연구에서의 리스크 분류체계는 현장업무 중심으로 이루어지지 않아 실용화되기에 한계가 있다. 따라서 본 연구에서는 전체 공정에 많은 영향을 미치는 철골공사를 대상으로 공사 프로세스 중심의 리스크 분류체계와 주요 공정 리스크 요인과 연계한 업무 플로우를 제시하였고, 공정리스크 관리업무의 효율성을 제고하기 위해 공정리스크 중요도를 분석하였으며, 이를 기반으로 공정 리스크 요인별 대응방안 및 세부대책으로 이루어진 공정 리스크 관리 도구를 개발하였다.

4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성 (Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation)

  • 송성열;양정삼;명태식
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).